AF121-213.pdf

PDF 46 KB Posted

Attached to
Condition Based Maintenance: Planning and Implementation
Solicitation number
AF121-213
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF121-213: Condition Based Maintenance: Planning and Implementation

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Materials

MODERNIZATION PRIORITIES:

KEYWORDS:

condition based maintenance, job shop optimization, planning and scheduling

ADDITIONAL INFORMATION

OBJECTIVE:

Develop advanced techniques to optimize planning and implementation of a Condition Based Maintenance (CBM) operation to minimize overall flow time while maintaining a high quality process.

DESCRIPTION:

The PDM (Programmed Depot Maintenance) repair processes involve three major divisions: Aircraft, Engines, and Commodities. While much of the attention is directed toward the end items for Aircraft and Engines divisions, commodities also has requirements. There are thousands of LRU’s (Line Replaceable Units) removed at depot, in the field, and in combat areas that must be returned to the depot and be refurbished. Most of these items are not available commercially. Small inventory levels force quick turnaround to prevent fleet shortages and there is limited advanced visibility of the repairs needed. The LRU’s are returned in various conditions and require intensive evaluations to determine the necessary repair processes (routes). No standard route exists since each end item is repaired based on its condition (condition based Maintenance - CBM), and no standard parts list is available since only necessary items are replaced. While condition based maintenance may save funds, it can be difficult to control and manage since every item must be treated uniquely. Critical supply needs and internal parts shortages often force mid-stream priority adjustments further complicating the process. The commodities division manages thousands of different end items (high diversity) with many different routes (high variability). The current planning and implementation processes are labor intensive and requires constant vigilance to meet delivery dates and accommodate adjustments. While much data is collected, it requires time consuming analyses to utilize it and constant communication to keep it current. The new concepts should address both planning and implementation of the plans without overburdening personnel with data collection and analysis tasks. It must also consider the experience and time constraints of the maintenance personnel and simplify the process where at all possible. The new concepts must be flexible enough to address thousands of different end items and repair operations. While research has been conducted on maintenance planning and scheduling, the focus has been on high demand, low variability operations. There are many gaps in the research associated with high variability, low demand operations and very little research available on condition based maintenance optimization and physical implementation. Any approaches to solving the issues must take into account the physical constraints, security protocols, and personnel restriction/limitations. The resulting concepts / processes / training must be demonstrated with the context of the depot repair environment and must follow the strategic, operational, and tactical framework of the Department of Defense depot repair processes.

PHASE I:

Research best concepts to meet needs and resolve the constraints associated with condition based maintenance operations. Based on the results of the research performed, develop a concept demonstration for assessing the program’s feasibility for Phase II.

PHASE II:

Develop a real world demonstration of the concepts/processes/training to be assessed by managers involved in the numerous production lines, shops, and support processes. The demonstration should include the integration of the concepts/processes/training in at least two different areas. The program shall also provide a plan to transition the technology to commercial development and deployment.

PHASE III DUAL USE APPLICATIONS:

DUAL USE COMMERCIALIZATION: Military Application: Various applications to areas with complex, variable planning requirements. Commercial Application: It could have a significant impact on material quality, accuracy, efficiencies, and throughput for commerical applications. The processes and/or technology selected will improve quality, reduce costs, and increase throughput.

REFERENCES:

Don Nyman and Joel Levitt, “Maintenance Planning, Coordinating & Scheduling”, Industrial Press, Inc, 2010.

1.

Bill Hale, “An alternative vision for CBM+ for the Air Force”, Thomson Gale, 2005.2.

Peter Brucker and Sigrid Knust, “Complex Scheduling”, Springer, 2010.3.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .