AF103-243.pdf

PDF 47 KB Posted

Attached to
Improved Methodology for Engineering Repair Process
Solicitation number
AF103-243
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF103-243: Improved Methodology for Engineering Repair Process

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Materials

MODERNIZATION PRIORITIES:

KEYWORDS:

engineering technical support, inspections technologies, reliability analysis

ADDITIONAL INFORMATION

OBJECTIVE:

Develop advanced techniques for analysis of processes and procedures that streamline the technical engineering support processes to minimize overall flow time while maintaining a high quality process.

DESCRIPTION:

The PDM (Programmed Depot Maintenance) repair processes are extensive overhauls that transform the weapon system into a refurbished product with full functionality and many upgraded processes. Because of the age of the weapon systems many of these cycles are thousands of hours and require broad tear down of the assets before the weapon system can be re-assembled to ensure it’s full working capabilities. Within the PDM cycle there are one hundred percent operations, low percent operations, and engineering technical support requests. One hundred percent operations are repairs that occur on every weapon system. Low percent operations are repairs that occur on only a certain percent of the weapon systems. Engineering Technical Support (ETS) requests are created when an issue or defect is encountered that does have a defined approach to resolve it. In the current depot process, maintenance discovers an issue or defect that requires engineering support to correct. It is sent to engineering where a decision is made on how to resolve the issue or defect. The decision is then sent to planning who determines the material list and skill sets required to correct the issue or defect. Maintenance is then informed of the solution, and personnel are dispatched to correct the issue. The current process is time consuming, non-standard, and leads to delays that impact the weapon system due dates. Improvements need to be made to streamline the process. The new concepts must be flexible enough to address four primary aircraft production lines, engine overhaul production lines and accessory back shop production lines while still addressing the distinctions between the cognizant engineering authorities for the different weapons systems. It must also consider the experience of the maintenance personnel and simplify the process where at all possible. While research has been conducted on the ETS request, the focus has been on identification and there are many gaps in the research associated with techniques regarding the physical execution and management of the processes in a depot setting. Any approaches to solving the issues must take into account the physical constraints, security protocols, and personnel restriction/limitations. The resulting concepts/processes/training must be demonstrated with the context of the depot repair environment and must follow the strategic, operational, and tactical framework of the Department of Defense depot repair processes.

PHASE I:

Research best concepts to meet needs and resolve the constraints associated with the many different interactive variables of the Engineering Technical Support requests including corrosion and crack inspections, and mechanic failures that require significant man-time and/or expertise.

PHASE II:

Develop a real world demonstration of the concepts/processes/training to be assessed by managers involved in the numerous production lines, shops, and support processes. The demonstration should include the integration of the concepts/processes/training in at least two different areas. The program shall also provide a plan to transition the technology to commercial development and deployment.

PHASE III DUAL USE APPLICATIONS:

DUAL USE COMMERCIALIZATION: Military Application: Applicable to all weapons systems and easily extensible to similar military operations. It could have a significant impact on material quality, accuracy, efficiencies, and throughput. Commercial Application: It could have a significant impact on material quality, accuracy, efficiencies, and throughput. The processes and/or technology selected will improve quality, reduce costs, and increase throughput.

REFERENCES:

James R. Evans, William M. Lindsay, “Managing for Quality and Performance Excellence”, Thomson South- Western, c2007.

1.

Steve Geary and Kate Vitasek, “Performance-Based Logistics: a Contractor's Guide to Life Cycle Product Support Management”, Supply Chain Visions - of Tennessee's Center for Executive Education, c2008.

2.

Andrew Sanchez, “Technical Support Essentials: Advice to Succeed in Technical Support”, Apress, c2009.3.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .