- AETC Initial Pilot Training Industry Day 15-16 Feb 2024 Federal contract opportunity
- Solicitation number
- FA3002-25-AETC-IPT
About this file
This document outlines the Air Education and Training Command's request for information regarding an industry day to discuss increasing pilot production output, efficiency, and pipeline modernization. Vendors are asked to respond by 29 January 2024 if interested in attending the industry day scheduled for 15-16 February 2024 at Joint Base San Antonio-Randolph, Texas. Up to ten vendors may participate either in-person with a maximum of two representatives each or virtually. Vendors are provided definitions for conditions-based phasing and asked to indicate by year what phases they can complete for pilot training, remotely piloted aircraft training, multi-engine lead-in training, and combat systems officer training. Additional questions address implications of removing certain training requirements and plans for ramping up instructor pilots, maintenance personnel, and aircraft procurement.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AETC IPT Industry Day
Using Attachment 1 (original RFI scope posted on SAM.gov), please provide responses to the following questions. To aid Industry, the Government provided a Conditions-Based definitions, mission priority, and a general framework for each company to use in responding the Government’s Request for Information.
The Government’s Industry Day will be conducted on a first-come, first-served basis on 15-16 February 2024. The Government’s proposed agenda allows for a maximum of ten (10) vendors to participate either in-person at Randolph Air Force Base, TX or virtually. Attendance is limited to a maximum of two (2) representatives from each vendor. To register for the event, please respond to ALL individuals below and annotate your company’s intent (in-person or virtually).
Notice: If your company desires in-person attendance, the Government will require specific information on each individual no later than 29 January 2024.
Points of Contact:
Mr. Trevor Talamantez (trevor.talamantez@us.af.mil) MSgt Jorge GrullonRodriguez (jorge.grullonrodriguez@us.af.mil) Lt Col Bennet Burton (bennet.burton@us.af.mil)
Capability-Based (C-B) Phasing Definitions:
Conditions-Based (C-B) Pilot (PPC &
IR)
Phase 1A 250 Phase 2A 500 Phase 3A 750 Phase 4A 1000 Phase 5A 1250 Phase 6A 1600 Phase 7A 1800
Conditions-Based (C-B) MEL Phase 1B 250 Phase 2B 500 Phase 3B 750 Phase 4B 1000 Phase 5B 1250 Phase 6B 1600 Phase 7B 1800
Conditions-Based (C-B) RPA Phase 1A 100 Phase 2B 200 Phase 3C 300 Phase 4C 450
Conditions-Based (C-B) CSO Phase 1D 100 Phase 2D 200 Phase 3D 350
Mission Priority:
1. Pilot PPC & IR qualifications
2. RPA
3. MEL
4. CSO
MEL Aircraft Type & Quantity
Sim Type &
b. Schedule: Please indicate, by year, each Conditions-Based Phase your company can complete for each of the four priority areas. For example, if your company can complete PPC & IR Phase 1A (250 students) in Year 1, place a “1A” into Year 1. Following the same format, please outline the remainder of the C-B Phases your company can complete for the remainder of PPC & IR, RPA, MEL, and CSO.
Part 141
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
Pilot (PPC &
IR)
RPA
MEL
CSO
Part 61
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
CSO
c. Location implications:
d. Infrastructure/Student Services Implications:
e. Student Training Schedule:
f. Cost Profile:
3. If Multi-Engine (MEL) Qual was removed, but the training retained – how does that change:
a. Aircraft Quantity/Procurement:
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
Aircraft Type & Quantity can complete PPC & IR Phase 1A (250 students) in Year 1, place a “1A” into Year 1. Following the same format, please outline the remainder of the C-B Phases your company can complete for the remainder of PPC & IR, RPA, MEL, and CSO.
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
c. Location implications:
d. Infrastructure/Student Services Implications:
4. If MEL & Instrument Rating (IR) were removed, but the training retained – how does that change:
a. Aircraft Quantity/Procurement:
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10 can complete PPC & IR Phase 1A (250 students) in Year 1, place a “1A” into Year 1. Following the same format, please outline the remainder of the C-B Phases your company can complete for the remainder of PPC & IR, RPA, MEL, and CSO.
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
5. If MEL, IR, and PPC certifications & checkrides were removed, but the training retained – how does that change:
a. Aircraft Quantity/Procurement:
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10 can complete PPC & IR Phase 1A (250 students) in Year 1, place a “1A” into Year 1. Following the same format, please outline the remainder of the C-B Phases your company can complete for the remainder of PPC & IR, RPA, MEL, and CSO.
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
6. If the CSO production requirement was removed – how does that change:
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10 can complete PPC & IR Phase 1A (250 students) in Year 1, place a “1A” into Year 1. Following the same format, please outline the remainder of the C-B Phases your company can complete for the remainder of PPC & IR, RPA, MEL, and CSO.
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
7. If the RPA production requirement was removed – how does that change:
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
b. Schedule: Indicate, by year, each C-B Phase your company can complete for each of the four priority areas. For example, if your company can complete Phase 1A in Year 1, place a “1A” into Year 1. Complete remainder of C-B Phases for PPC & IR, RPA, etc.
PLEASE
COMPLETE
YEAR
1 2 3 4 5 6 7 8 9 10
CSO
c. Location implications:
d. Infrastructure/Student Services Implications:
8. Given the high-demand, low-density nature of flight training personnel, maintenance personnel, and new aircraft today, what is your ramp-up plan on the following areas:
a. DPE:
b. Instructor Pilots:
c. Maintenance:
d. Aircraft and avionics procurement:
9. Does limiting aircraft to a single-family of systems create challenges to a quicker FOC timeline?
10. Can you please explain how you plan to ramp-up Student Services?
11. Have you cross-compared per diem rates against your ROM associated with Student Services?
12. Can you provide any additional details that would help us understand the commercial market?
Attachment 1 (found at Notice ID FA300224RFI-EIFT)
E-IFT - RFI -