IDIQ_SOW_FINAL_2015_-2020_3-4-2015.pdf

PDF 100 KB Posted

Attached to
A-E Environmental Program at Robins AFB, GA Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to A-E Environmental Program at Robins AFB, GA, newest first.
File Type Posted
Request_for_Information__3.pdf PDF
Request_for_Information__2.pdf PDF
RFI__1.pdf PDF
IDIQ_SOW_FINAL_2015_-2020_3-4-2015.pdf PDF
CDRLS_for_FollowOn_AE_IDIQ.pdf PDF
Attachment_3_Past_Performance_Questionnaire_3-4-15.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.XXXX

Robins Air Force Base

STATEMENT OF WORK

FOR

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)

ARCHITECT-ENGINEERING (A-E) SERVICES

TO SUPPORT ENVIRONMENTAL PROGRAMS

4 MARCH 2015

TABLE OF CONTENTS

1.0 SCOPE

2.0 TITLE I, TITLE II AND OTHER A-E SERVICES REQUIREMENTS 5

2.1 Title I Services

2.2 Title II Services

2.3 Other A-E Services

3.0 APPLICABLE DOCUMENTS

4.0 TASK ORDER MANAGEMENT, PLANNING, AND REPORTING

SERVICES

4.1 Project Web Site

4.2 Schedule and Planning Requirements

4.3 Performance and Cost Reporting

4.4 Funds and Man-Hours Expenditure Report

4.5 Photo Documentation

4.6 Meeting and Conference Services

4.7 Regulatory/Professional Interface

4.8 Notification Requirements

4.9 Work Site Coordination

4.10 Spatial Data (Map) Requirements

5.0 TASK ORDER PROJECT PLAN DEVELOPMENT SERVICES

5.1 Quality Program Plan (QPP)

5.2 Laboratory Selection

5.3 Analytical Data Management

6.0 ENVIRONMENTAL PLANNING AND PROGRAMMING

6.1 Professional Planning and Programming

6.2 Planning Actions

6.3 Tracking of Performance Metrics and Quality Performance Indicators

6.4 Environmental Baseline Surveys (EBSs)

7.0 TITLE I SERVICES FOR ENVIRONMENTAL PROJECTS

7.1 Design Overview

7.2 Operations and Maintenance Plan

7.3 Project Schedule

7.4 Environmental Design Reviews

8.0 TITLE II SERVICES FOR ENVIRONMENTAL PROJECTS

8.1 Construction Submittal-Review

8.2 Design Update

8.3 Evaluation of Ongoing Actions

8.4 Field Oversight

8.5 Inspections

8.6 Submittal Register Review

8.7 Treatment, Storage, and Disposal Facility Audits

9.0 OTHER ENVIRONMENTAL A-E SERVICES

9.1 Community Involvement

9.2 Environmental Restoration

9.2.1 Preliminary Assessment/Site Inspection (PA/SI) or RCRA Facility Assessment

9.2.2 Remedial Investigation (RI) or RCRA Facility Investigation (RFI)22

9.2.3 Project Baseline Risk Assessment

9.2.4 Conceptual Site Model (CSM)

9.2.5 Feasibility Study (FS) or Corrective Measures Study (CMS)

9.2.6 Informal Technical Information Reports (ITIRs)

9.2.7 Proposed Plans (PPs), Records of Decisions, Decision Documents (DDs), and No Further Response Action Plans (NFRAPs)

9.2.8 Engineering Evaluation/Cost Analysis (EE/CA)

9.2.9 Remedial Process Optimization (RPO)

9.2.10 Treatability Studies, Pilot Tests, Bench Scale Tests, Remedial Actions (RAs)

9.2.11 Management Action Plans (MAPs)

9.2.12 Peer Review

9.2.13 Warranty of Installed Environmental Restoration Equipment and Systems

9.3 Low Level Radionuclides

9.4 Monitoring and Operations

9.4.1 Long Term Monitoring (LTM) and Remedial-Action Operations

(RAO)

9.4.2 Monitoring Well Installation, Upgrades, Treatment, Testing, and Repairs

9.5 Record Keeping and Reporting

9.6 Risk Assessments

9.6.1 Human Health Risk Assessment

9.6.2 Ecological Risk Assessment (ERA)

9.7 Storage Tank Management

9.7.1 Petroleum, Oils, and Lubricants and Other Storage Tank

Management

9.8 General Environmental Program Technical Support

10.0 OTHER TRADITIONAL A-E SERVICES

10.1 Graphics Support

10.2 Publication Development and Production

11.0 GOVERNMENT POINTS OF CONTACT

CONTRACT SECTION C --STATEMENT OF WORK

For Architect-Engineering (A-E) Services to Support Environmental Programs

PART A – INTRODUCTION

This statement of work (SOW) defines requirements for A-E services for environmental programs in accordance with applicable regulatory guidance.

In carrying out each work assignment issued as a Task Order (TO) under the basic contract, the Contractor shall furnish the personnel, services, equipment, materials, facilities, and other requirements necessary for, or incidental to, the performance of work set forth herein. The A-E is advised that all work products generated under this contract shall not be released to any other organization without the written permission of the Contracting Officer (CO).

Primary technical services shall be performed by individuals who are credentialed members of architectural, planning, science, and engineering professions. Generally, a credentialed professional (a) is licensed (e.g., registered professional engineer) to practice in the state where a facility is located and (b) commands the necessary expertise, in terms of knowledge and experience, to undertake the specified task.

1.0 SCOPE

The Contractor shall provide Title I, Title II, and Other A-E Services for environmental restoration and compliance programs for Robins Air Force Base, Georgia (Robins AFB). The government may also issue orders requiring delivery to or performance at multiple installations.

The scope of the contract includes support in the following existing and emerging program areas.

Individual TOs may include greater detail concerning the project requirements.

2.0 TITLE I, TITLE II AND OTHER A-E SERVICES REQUIREMENTS

2.1 Title I Services

Title I services include all aspects of environmental design such as preparation and/or review of contract plans, specifications, scheduling, cost estimates, and preparation of operating and design manuals. These services relate to specific Environmental requirements. They consist of conducting field surveys and investigations to obtain design data, as well as preparing contract plans, specifications, cost estimates and estimated construction periods of performance. Title I efforts also encompass those efforts required to support and develop design work, including planning and programming, program management, project scoping, studies, investigations, evaluations, consultations, conceptual design, value engineering, topographic survey services, as well as operation, monitoring, and optimization of environmental treatment or control systems.

2.2 Title II Services

The Contractor shall perform quality assurance and oversight of environmental projects. These services are related to specific or proposed projects and consist of supervision and inspections.

A-E Supervision and Inspection Services: Separate, normal construction management duties to include construction contractor submittal review, day to day liaison, surveillance, coordination, testing, and documentation of construction/investigative activities. Inspection activities shall ensure compliance with contract regulatory requirements, construction of complete and usable facilities, safe work practices, timely construction, limitation of cost growth, etc. All activities are under the jurisdiction of the CO and coordinated with Contracting Officer’s Technical Representative (COTR), e.g., AFCEC and/or Robins AFB Project Managers.

Quality Assurance/Quality Control (QA/QC) Inspection Services: The A-E shall be capable of providing inspection of field work being conducted by other contractors engaged in environmental projects. This QA/QC inspection could include observation of the following:

drilling and installation/development of monitoring wells, soil and ground water sampling, soil gas investigation, installation of extraction trenches, slurry walls, landfill caps, liners, and other construction and demolition activities. The QA/QC could also include collection of data to validate inspection and verify conditions.

2.3 Other A-E Services

The Contractor shall provide a full range of environmental services. These services shall include, but are not limited to, support necessary for the environmental restoration and compliance programs. These efforts include planning and programming, program management, scoping, studies, operations support (including data gathering and permit preparation), investigations (including geophysical), evaluations, consultations, conceptual design, value engineering, as well as operation, monitoring, and optimization of environmental treatment or control systems. Also included are other related services for the continuation of an existing environmental program or to establish an initial environmental program.

For Architect-Engineering (A-E) Services to Support Environmental Programs

PART B – ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS

The Contractor shall provide management, planning, performance measurement and cost status reporting pertinent to the performance of the requirements identified in the TO.

3.0 APPLICABLE DOCUMENTS

Comply with all applicable (l) federal, state, and local environmental statutes, instructions, manuals, handbooks, regulations, guidance, policy letters, and rules (including all changes and amendments), and (2) Presidential Executive Orders, in effect on the date of issuance of the TO, including Unified Facilities Criteria (UFC) and Unified Facilities Guide Specifications (UFGS).

In addition, the Contractor shall refer to the AFCEC Technical Services Quality Assurance Program, Guidance for Contract Deliverables (GCD), current version, unless otherwise specified.

This GCD is a reference document to be used in the generation of contract deliverables.

Installation or location-specific documents shall be identified in individual task orders. The Contractor shall be responsible for identifying and complying with all applicable requirements as they pertain to the individual project requirements of each task order.

4.0 TASK ORDER MANAGEMENT, PLANNING, AND REPORTING

SERVICES

Contractors shall plan project activities, including the development, implementation, and maintenance of project schedules, events, status of resources, report(s) on the activities, and progress toward accomplishing project objectives. Document for government review and approval the results of the project efforts for the TO.

4.1 Project Web Site

The Contractor shall have the capability to establish a project web site with real-time access available to government personnel. The web site may include, but are not limited to, a submittal tracker or submittal register, a Request for Information (RFI) tracker, a change order tracker, a photo log, project schedule, and project status. Information Assurance (IA) requirements for DoD information systems and/or data storage must meet the Technical security requirements of the DoD/AF environment and is the responsibility of the service provider to meet the mandates defined in Department of Defense Instructions (DoDI) 8510.01. Responsibility for procedural and administrative security is shared between the service provider and the supported entity contracting for the service and must meet the Defense Information System Agency (DISA) Best Security Practices. The project-specific web sites shall be tailored to the needs of each project.

(Contract Data Requirements List (CDRL) A001)

4.2 Schedule and Planning Requirements

Provide schedules for tracking work progress as specified in the TO. The SOW for specific TOs will indicate which of the following schedules is required. Project Planning Charts (PPCs) are recommended for less complex projects and Integrated Master Schedules (IMSs) are recommended for more complex projects.

The Contractor shall prepare and submit PPCs or IMSs for approval. The PPC shall detail the project schedule and status through the use of Gantt charts, which shall depict percent complete for each task (CDRL B002). The IMS shall detail the project schedule and status through the use of Gantt charts and Critical Path Method (CPM) analyses (CDRL B003).

4.3 Performance and Cost Reporting

Prepare and submit Performance and Cost Reports (PCRs) as specified in the TOs. The PCR provides the current status and projected requirements for funds, man-hours, and work completion relative to the negotiated budget. The PCR shall be used to review and evaluate the overall progress of the project, along with any existing or potential problem areas. The PCR shall include a summary of the events that occurred during the reporting period, discussion of performance, identification of problems, proposed solutions, corrective actions taken, and outstanding issues. (CDRL C0001)

4.4 Funds and Man-Hours Expenditure Report

Implement and maintain a cost accounting system and prepare a Funds and Man-Hours Expenditure Report (FMER) to correlate the status of expensed funds and man-hours against the progress of the work completed and the negotiated budget. The FMER and associated graphics shall detail the current project status and identify funds and man-hours required to complete the assigned tasks. (CDRL C0002)

4.5 Photo Documentation

Prepare digital photo documentation. Include photo documentation of site(s) and building(s) under investigation, field activities, and sample locations. Approval to conduct photography of any kind must be coordinated through the CO and/or COTR. (CDRLs B0005)

4.6 Meeting and Conference Services

4.6.1 Meeting/Teleconference Support

Attend and/or support meetings and teleconferences as required by the CO and/or COTR. The purpose of the meetings include, but are not limited to, contract discussions, progress reviews, project scoping, planning, design reviews, construction reviews, project status, and the general exchange of information concerning current and future activities. When specified in the TO, the Contractor shall participate in and/or facilitate on-site meetings. (CDRL A021)

4.6.2 Public Meetings and Hearings

Present technical information and provide logistical support (e.g., facilities, audiovisual, handouts, report(S), recordings, verbatim transcripts, translations, slides, synopsis, etc.) for events and/or meetings in support of the government's position. (CDRL A021)

4.6.3 Conference and Training Support

Develop conference programs, training sessions, and arrangements for government sponsored conferences in support of environmental programs. (CDRL A021)

4.7 Regulatory/Professional Interface

Assist with oral/written interaction with interested parties related to the project. Forums may include administrative proceedings, formal meetings, or informal meetings. Requirements include, but are not limited to, presentation materials, agendas, minutes, publications, news releases, public notices, and the maintenance of mailing list(s).

Assist in project technical review, analysis, and discussions to integrate comments from interested parties on programs and related data and studies. Develop options for responses and prepare-report(s) to communicate government priorities to regulatory agencies and other interested parties.

Assist with the review and interpretation of new statutory and regulatory requirements and make recommendations for government facility planning and policy integration as it applies to the assigned project. (CDRLs A001, A021)

4.8 Notification Requirements

The Contractor is required to notify the CO and COTR of critical issues that may affect the contract performance and/or human health and the environment. The types of issues that require notification include, but are not limited to, health risks, spills, unexpected utility crossings, unusual weather conditions, unacceptable materials, changes in critical personnel, and Unexploded Ordnance (UXO). As an example, if unanticipated UXO was discovered during field activities, the Contractor would be required to immediately stop work, report the discovery to the COTR, and implement the appropriate safety precautions. Commencement of field activities could not continue until clearance was received from the CO and/or COTR. On critical issues, oral notification should be made immediately, followed by written notification as soon as practical. (CDRL A003)

4.9 Work Site Coordination

Coordinate work site activities to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions. Provide physical security to the work area with security equipment and personnel as specified in the TO.

The Contractor must comply with Occupational Safety and Health Administration (OSHA) safety and health regulations and local safety office requirements. The Contractor is required to provide the CO copies of any OSHA report(s) submitted during the duration of the TO. (CDRLs A00l, A004)

Specifically, coordinate work site activities with applicable existing base or area operations.

4.10 Spatial Data (Map) Requirements

All products associated with this contract that provide a map representation of the location of installation features (historical, existing, or planned) including installation maps, site plans, area development plans, or other related overhead (plan) views of an installation (partial or entire) must adhere to the following requirements.

All maps and associated data must comply with the latest version of Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE) available from the CAD/BIM Technology Center website: https://cadbim.usace.army.mil/. These data will be organized using the current version of the standard approved by the Headquarters Air Force Geo Integration Office (HAF GIO) as the functional lead for installation mapping and visualization. The SDSFIE will determine file and feature class identification and definition, attribution and valid domain values.

When any geospatial information collected as a result of the contract includes information identified in the Common Installation Picture (CIP) or recognized Mission Data Set (MDS) the contractor will deliver data consistent with the established requirements for the data and will ensure functionality with the receiving system. Information must be collected at no less than

1:1200 scale for base cantonment areas and 1:4800 scale for larger undeveloped base areas.

Spatial data will meet or exceed National Map Accuracy Standards at those scales. Metadata will be provided by the government when applicable and updated by the contractor when changes are made. Contractor shall use Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata (CSDGM) for updates to the metadata.

Geospatial data must be delivered in a geo-referenced GIS (Geographic Information System) format (feature-based file structures with one-to-one cardinality between spatial records and attribute records) which would include Environmental Systems Research Institute's (ESRI) shapefile and geodatabase formats. All attribute data as specifically outlined in the task order contract must be included either in the GIS data file or as a separate table with a SDSFIE key variable that may be used to relationally join the separate table with the GIS data file. All geospatial data must be delivered in the North American Datum 1983 (NAD83) projection, State Plane Coordinate System, using feet or metric coordinate units. Deviations from this standard may occur in the event the projection standard is modified by HAF GIO (E.g. UTM). Further guidance on mapping units, coordinate systems and projections is available from the Installation

GIO.

Mapping- or Survey-Grade Global Positioning Systems (GPS) or comparable traditional survey methods will be used to collect geospatial data. The use of mapping- or survey-grade GPS will depend on the precision requirements of the product data. These requirements will be specified later in this SOW for all contract activities where geospatial data are involved. In the case of contracts involving utility construction, location and attribute data will be obtained at the time of excavation. GPS surveys performed by the contractor shall be tied to the existing Robins AFB geospatial control datum. Government shall provide a shape file of existing control points to the contractor upon request. Further information about precision requirements should be obtained from the installation GIO.

Source data and product data remain the property of the US Government. The contractor may be required to explain and demonstrate the company's process for protecting all geospatial data, including but not limited to geometry, attributes, metadata, topologies, and relational database schemas and operations used in association with this SOW. The contractor may be required to sign a non-disclosure agreement attesting to the same before source data are released. Further information about security and nondisclosure requirements should be obtained from the installation GIO. Some installation map data, source and/or product, may be considered by the government to be "sensitive, but unclassified. The intent of this clause is to prevent intentional or unintentional dissemination of "sensitive, but unclassified" information to include unauthorized access to the source and product data by any entity wishing to do harm to the USAF or United States Government while the data resides on the contractor's computer network.

The contractor is not authorized to release this. information to any third party without the explicit consent of the Headquarters Air Force Office of the Civil Engineer (AF/A7C) or its involved installation. All source information must be returned to the government POC or destroyed upon completion of this project. Aerial imagery obtained from the Government and by the contractor is not to be used, shared, transmitted to third parties, or stored for any purpose other than performing work under this SOW without consent from the Installation GIO. Special requirements for handling classified map data, if applicable, will be addressed elsewhere in this SOW. (CDRLs A00l, A019, A020)

5.0 TASK ORDER PROJECT PLAN DEVELOPMENT SERVICES

Project and/or site-specific planning documents and development requirements may be required under the TO. Plans must comply with the specifications, procedures, and methodologies (such as approved Federal Facilities Agreements [FFAs]) in the site/project specific plan(s). Project plans may include any of the following as appropriate to the TO. The COTR shall approve (in writing) any proposed modification to, or deviation from, any activity described in these documents, following approval by the CO.

5.1 Quality Program Plan (QPP)

The QPP shall include the Work Plan (WP), the Health and Safety Plan (HSP) (as required by 29 Code of Federal Regulations (CFR) 1910.120), and the Environmental Sampling and Analysis Plan (SAP).

5.1.1 Work Plans (WPs)

Prepare WPs to comply with Department of Defense, Air Force, United States Environmental Protection Agency (USEPA) (epa.gov/quality), state, and local regulations regarding the proposed work effort. Prepare test plan(s), including cost estimates. Specific WPs to conduct site activities and analysis as part of future projects may also be specified. Restoration sampling and analysis WPs shall be prepared in accordance with the Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP). The UFP-QAPP Worksheets shall be used, unless regulations or formal agreements require a different format. If the UFP-QAPP Worksheets are not used, a crosswalk (Worksheet 2) shall be used to document that all required elements of the UFP-QAPP are present in the WP. (CDRLs A004, A005, A006, A007)

5.1.2 Health and Safety Plan (HSP)

Prepare a HSP to comply with Air Force, OSHA, USEPA, state, and local health and safety regulations regarding the proposed work effort. Utilize to the fullest extent possible any existing related HSP, tailored specifically to the current effort. Use USEPA guidelines for designating the appropriate levels of protection needed at the study site(s) as applicable. Maintain written certification that the approved HSP has been reviewed with all personnel that work at the project site prior to their mobilization. (CDRL A004)

5.1.3 Sampling and Analysis Plan (SAP)

Prepare a SAP as specified in the TO. The SAP shall consist of both an FSP and a QAPP. If an installation-wide SAP has already been prepared, the TO may only require the preparation of project/site specific addenda. SAPs in the restoration program shall be prepared using the UFP- QAPP, AFCEC Restoration Quality Assurance Examples and Guidance, and project DQOs as specified by the restoration team. (CDRL A005)

5.2 Laboratory Selection

The Contractor shall select a laboratory with analytical capabilities sufficient for the methods specified in the WP and adequate throughput capacity to handle the project’s analytical workload during all field activities. The Contractor shall ensure that the selected laboratory is accredited under the DoD Environmental Laboratory Accreditation Program, and meets all state and federal requirements, including state certification where appropriate.

5.3 Analytical Data Management

The Contractor shall ensure that all hard copy and electronic data deliverables supplied by the laboratory are complete and adequate to support the quality and usability of the data. Raw data packages shall be submitted to AFCEC upon request. Data packages shall meet federal and state standards and include all information required to re-create the analysis, including correspondence with the laboratory regarding Quality Assurance and Quality Control (QA/QC) exceedances and documentation of corrective actions. (CDRL A00l)

For Architect-Engineering (A-E) Services to Support Environmental Programs

PART C – PLANNING SERVICES

The contractor shall provide A-E services in support of installation planning and programming activities.

6.0 ENVIRONMENTAL PLANNING AND PROGRAMMING

Develop, update, integrate, publish and present environmental planning and programming services as specified in the TO.

6.1 Professional Planning and Programming

Services to be performed include support to establish or sustain environmental programs including documentation to support funding and execution.

6.2 Planning Actions

Develop a short-term and long-range plan of action to achieve compliance with the proposed mission, including regulatory requirements as specified in the TO. (CDRLs A001, A007, A016, A017)

6.3 Tracking of Performance Metrics and Quality Performance Indicators

Measure the performance and the accomplishment of environmental program goals. Assist in the development of performance metrics, tracking of data, development of report(s), and recommendation for improvements. (CDRL A001)

6.4 Environmental Baseline Surveys (EBSs)

Review all available information and survey the condition of real property proposed by the Air Force to be acquired, transferred, leased, sold or otherwise conveyed and provide appropriate documentation.

6.4.1 Phase I Environmental Baseline Surveys

Review items such as historical records, reports, data, environmental surveys, inspection reports, regulatory agency reports, notices of violation or noncompliance, current or discontinued permits, titles, deeds, and other real property records, aerial photographs, and other documents to determine the potential for past/present contamination of real property. (CDRLs A001, A002)

6.4.2 Phase II Environmental Baseline Surveys

Conduct a Phase II EBS as directed in the TO. Investigations involve surface, subsurface, and aquifer sampling to determine type, concentration, and extent of contamination. (CDRLs A00l, A002)

6.4.3 Environmental Impact Analysis Process

Provide support for activities such as the preparation of the Description of the Proposed Action and Alternatives (DOPAA), environmental assessments (EAs), environmental impact statements (EISs), findings of no significant impact (FONSIs), Records of Decision (RODs), mitigation plan(s), and other associated documents. Supplemental activities include support on data identification, collection (including site visits and interviews), development, and interpretation;

sampling and analysis; human health risk and environmental impact evaluations and reports;

expert testimony; and public meetings and hearings (including scoping meetings).

6.4.4 Description of Proposed Action and Alternatives (DOPAAs)

Prepare, review or complete DOPAAs as specified in the TO. (CDRL A001)

6.4.5 Environmental Assessment (EA) & Findings of No Significant Impact (FONSI)

Prepare EAs and FONSIs for specific actions as specified in the TO. Activities include obtaining and analyzing data to determine potential environmental impacts, preparing EAs/FONSIs, and coordinating efforts with the appropriate agencies. (CDRL A001)

6.4.6 Environmental Impact Statements (EISs) and Records of Decision (RODs)

Prepare EISs and RODs as specified in the TO. Tasks include collection, development, and interpretation of data; analyzing environmental consequences; and meeting support. (CDRL A001)

6.4.7 Project Environmental and Land Use Plans

Provide support for project environmental, siting, and design considerations in support of decisions on mission realignments; base/mission modifications, explosive safety site approvals, additions and closures; airspace designators, routes and ranges; and other mission support activities required by AF. (CDRLs A001, A013)

6.4.8 Asset Management Planning.

Develop, update, integrate, publish and present, asset management plans directly related to environmental projects/programs to include, but not limited to, the following: Base Activity Management Plans (BAMPS), MAJCOM Activity Management Plans (MAMPS), Base Comprehensive Activity Management Plans (BCAMPs), MAJCOM Comprehensive Activity Management Plans (MCAMPs), and Air Force Comprehensive Activity Management Plan (AFCAMP) as specified. Provide the necessary natural/built infrastructure data/information collection and analysis to support requirements/opportunities identification and prioritization.

Provide capability gap analysis in support of investment planning at all AF levels. (CDRLs A001, A013)

For Architect-Engineering (A-E) Services to Support Environmental Programs

PART D – ENVIRONMENTAL SERVICES

For environmental services, all on-site workers (contractor and subcontractor) performing hazardous operations, including working with hazardous materials, must have completed the OSHA 1910.120 Hazardous Waste Operations and Emergency Response (HAZWOPER) training and/or other applicable training, plus annual refresher courses. Maintain documentation supporting training records and have the site-specific HSP on site, available for workers and/or regulatory review.

Title I, Title II, and Other A-E services are anticipated for environmental remediation projects.

Environmental Services - Support environmental restoration, environmental conservation and planning, environmental quality, and related projects as identified in this SOW.

7.0 TITLE I SERVICES FOR ENVIRONMENTAL PROJECTS

7.1 Design Overview

The government shall provide pertinent and available background information concerning the project. The major objective of a design project shall be the complete design of a practical and effective system(s).

Designs specified in Section C of the contract may include new construction, upgrades, maintenance, or repair. Designs shall comply with all environmental requirements as specified by the USEPA or state environmental agency for the selected site. The complete design shall comprise the following.

7.1.1 Cost Estimates

As part of the design, develop a detailed cost estimate for construction and implementation of the project with detailed labor, material, subcontractor, and other costs using an accepted industry standard format. Develop life cycle cost estimates for planning and budgeting. These cost estimates shall detail, by fiscal year, the various development, construction, O&M, and LTM costs. (CDRL A008)

7.1.2 Design Plans and Specifications

Develop clear and comprehensive design plan(s) and specifications with a supporting Design Analysis or Basis of Design Report. Include critical information like the design basis, discussion of technical factors, design assumptions, detailed engineering drawings, equipment tables, material tables, permits required, submittal register(s), and appendices with data and calculations. (CDRLs A001, A008, A009, A010, A011)

7.2 Operations and Maintenance Plan

As part of the design effort, develop an Operations and Maintenance (O&M) Plan to cover both implementation and long-term maintenance. The plan shall include documentation for the comprehensive system, not simply for each component. Include information such as the start-up procedures, specifications, description of normal O&M, potential problems, contingencies, description of equipment, routine testing requirements, replacement parts and sources, and other industry standard requirements. (CDRL A012)

7.3 Project Schedule

As part of the design effort, develop a project schedule for construction and implementation.

(CDRLs A016, A017)

7.4 Environmental Design Reviews

The design and design criteria shall be submitted for review by the government in one or more phases, as specified in the TO. Disposition of the comments shall be determined at the respective review meeting and the results shall be incorporated into the next required design phase submittal. The specific requirements for each design phase shall be specified in the TO.

Examples of requirements that might be specified for a phase would include design plans, cost estimates, schedules, Basis of Design Reports, review comments with responses from prior work, design analyses, submittal registers, List of required permits, O&M requirements, calculations, and other similar requirements. (CDRLs A001, A008, A009, A010, A011)

8.0 TITLE II SERVICES FOR ENVIRONMENTAL PROJECTS

8.1 Construction Submittal-Review

Review plan(s) and systematic QA procedures. Examples of plan(s) to be reviewed may include, but are not limited to, cost estimates, design plans and specifications, O&M plans, project schedules, all documents associated with design phases, QPP, HSP, and SAP as applicable to the TO. These plans should be reviewed against current guidance. Prepare and submit an evaluation of the project-specific plan(s). Perform RFI tracking, provide initial input for the COR on RF is, and close out RFI responses based upon COR feedback. (CDRL A001)

8.2 Design Update

Maintain and update the design documents during construction. This is required to incorporate any changes to the design made during the construction phase to correct design deficiencies, incorporate new technologies, or adapt to previously unknown conditions. (CDRLs A001, A008, A009, A010, A011)

8.3 Evaluation of Ongoing Actions

Perform on-site technical surveillance of field operations being performed by others, provide integrated management oversight and technical assessment of ongoing fieldwork, and ensure conformance with the selected remedies and regulatory requirements. Provide an evaluation to ensure that remedies are performing as designed. (CDRL A001)

8.4 Field Oversight

Provide manpower, equipment, material, services, and transportation necessary for oversight services during the construction and operation of the project. Provide independent review and summary of actual versus scheduled status for real time review by the COR and periodic progress reports summarizing the work efforts and any open items requiring Robins AFB resolution. Meet and follow the site-specific HSP. (CDRL A018)

8.5 Inspections

Conduct routine, pre-final, and final walk-through inspections of the project. Daily reports, if required, should use a bound log book such as AF Form 1477. All information required by AF Form 1477 shall be annotated daily and each day's entry shall be signed by the inspector and submitted to the COR twice per week.

The pre-final inspection of the completed project shall involve the CO and/or COTR, regulatory agencies, and other agencies with a jurisdictional interest. Document the pre-final inspection findings in a pre-final inspection report.

The pre-final inspection report shall be used as a checklist for focusing the final inspection on deficient construction items. Document the findings of the final inspection in a final inspection report according to the format specified at the pre-construction conference. The final inspection report shall certify that all items of the design have been implemented and that the project is complete and operational. The final inspection report shall include a record of as-built drawings and documentation (e.g., test results) verifying that performance standards have been met.

(CDRLs A001, A013)

8.6 Submittal Register Review

Review construction submittals to ensure compliance with the Submittal Register prepared during design. Assist the COTR by identifying discrepancies and recommending resolution.

(CDRL A001)

8.7 Treatment, Storage, and Disposal Facility Audits

Evaluate the acceptability of potential treatment, storage, and disposal (TSD) facilities for compliance with all applicable local, state, and federal requirements. (CDRL A001)

9.0 OTHER ENVIRONMENTAL A-E SERVICES

Provide all labor, materials, and services necessary to deliver, for government review and approval, those studies and services that support environmental programs and projects.

Multidisciplinary technical capabilities may be required. The Contractor shall perform tasks, including but not limited to, the following general tasks related to the specific work areas cited in this section.

General technical support Document reviews Technical evaluations of responses to solicitations Permit applications, coordination, negotiation Emissions characterization Completion of inventories Identification of relevant regulations Compliance assessments and plans Development of policy and regulations, handbooks, tutorials, and pamphlets Preparation of pollution prevention strategies Evaluations of records Evaluations of reporting processes Modeling using computer software Preparation of implementation plans Technology reviews Completion of cost and feasibility studies Risk management planning Training support Audit support Meeting support and/or facilitation

Program management support Programming Safety evaluations Project and program level scoping studies Technical investigations and/or evaluations Value engineering services Inspection and field oversight Optimizing environmental systems Annual report support

In the completion of these tasks, the Contractor shall comply with all federal, state, and local rules and regulations.

9.1 Community Involvement

Support Community Involvement programs including support on meetings, media relations, risk communication, strategic planning, information repositories, government relation activities, advisory boards, outreach activities, fact sheets, poster boards, websites, training, and strategic planning. Prepare plan(s) including, but not limited to, the Community Relations Plan (CRP).

(CDRLs A001, A014, A021)

9.2 Environmental Restoration

9.2.1 Preliminary Assessment/Site Inspection (PA/SI) or RCRA Facility Assessment

(RFA) Conduct the PA/SI or RFA to define the project setting at a specified location. Identify, document, and report preliminary assessment of the site condition, restraints, local environmental conditions and contamination, and potential mechanisms for contamination migration. (CDRL A001)

9.2.1.1 Preliminary Assessment or RCRA Facility Assessment

Conduct a literature search to define the installation or facility project setting and to identify potential project conditions, site(s), and resources to include the possibility of encountering Resource Conservation and Recovery Act (RCRA)-listed wastes. The purpose of this effort is to develop a Conceptual Site Model (CSM) for each location, present summary hypotheses regarding the local conditions, potential project alternatives, and their potential impact on sensitive site conditions. (CDRL A001)

9.2.2 Remedial Investigation (RI) or RCRA Facility Investigation (RFI)

Conduct an RI or RFI as specified in the TO.

9.2.2.1 Remedial Investigation or RCRA Facility Investigation Report

Prepare RI or RFI Reports that characterize environmental conditions, define the nature and extent of contamination, and quantitatively estimate the risk to human health and the environment at various site(s) through the collection of geologic, geophysical, hydrogeological, ecological, chemical, physical and hydrologic data, as well as appropriate environmental samples. (CDRL A00l)

9.2.3 Project Baseline Risk Assessment

Evaluate the project risk to the public's health and to the environment for each site using validated data supported by acceptable QA/QC results, the site's conceptual model, and a Chemical and Site-Specific Risk Analysis (CSSRA). (CDRL A001)

9.2.4 Conceptual Site Model (CSM)

Develop or refine the CSM for each site using validated data (preferably) or unvalidated data of sufficient quality to the CO supported by acceptable QA/QC results and site characterization information. The primary purpose of the CSM is to aid in identifying exposure pathways by which populations may be exposed to contaminants. (CDRL A001)

9.2.5 Feasibility Study (FS) or Corrective Measures Study (CMS)

Complete the FS or CMS utilizing information from the RI or RFI and the baseline risk assessment. In the FS or CMS, develop and evaluate remedial action alternatives for each site where identified risks to human health and/or the environment exceed acceptable levels negotiated by the government and regulatory agencies. (CDRL A001)

9.2.5.1 Alternatives Development

Establish project objectives and goals for promoting human and environmental balance. These objectives and goals shall be determined based on identified applicable or relevant and appropriate requirements (ARARs). Identify general project actions, applicable technologies, and combine project/mission/installation technologies that formulate distinct project development alternatives. Identify alternatives that eliminate, control, and reduce project risk.

(CDRL A001)

9.2.5.2 Alternatives Analysis

Conduct a detailed analysis of each alternative selected and identified in the Initial Screening of Alternatives (ISA) report. (CDRL A001)

9.2.6 Informal Technical Information Reports (ITIRs)

Support the development of ITIRs to include Analytical Data Reports, Accelerated Remediation Project Definition, and Site Characterization Summaries.

9.2.6.1 Analytical Data Report

Provide an Analytical Data Report that includes, but is not limited to, the project requirements, analytical results, QC results, cross-reference tables, chain-of-custody documents, verification/validation reports, usability report(s), the case narrative(s), approved variances, project communication and raw data as specified in the TO. (CDRL A001)

9.2.6.2 Accelerated Remediation Project Definition ITIR

For those site(s) identified during this effort as candidates for accelerated remediation, prepare a Accelerated Remediation Project Definition ITIR. (CDRL A001

9.2.6.3 Site Characterization Summary ITIR- (SCS ITIR)

Prepare SCS ITIRs to serve as core documents for the RI report(s). (CDRL A001)

9.2.7 Proposed Plans (PPs), Records of Decisions, Decision Documents (DDs), and No Further Response Action Plans (NFRAPs)

Prepare the PP(s), DD(s), NFRAP(s) and ROD(s) using the format in OSWER 9200.1-23P and latest AF guidance for NFRAP preparation. The PP shall be prepared utilizing a format approved-by-the-GOR: Once the PP is distributed to-the-public and-comments are obtained, prepare a responsiveness summary report. The DD shall contain the responsiveness summary report. (CDRLs A001, A007)

9.2.8 Engineering Evaluation/Cost Analysis (EE/CA)

Prepare the EE/CA as part of Action Memorandum DDs. The EE/CA shall evaluate possible alternative technologies for removal actions for remediation of an immediate or long-term threat at a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site.

An EE/CA is required by the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) for any removal action that is determined to be non-time critical. (CDRL A001)

9.2.9 Remedial Process Optimization (RPO)

Perform all studies to monitor and evaluate the remedial process to plan, design and implement RPO to ensure the effectiveness and efficiency of the remedial process through feedback of information into the decision process. (CDRLs A001, A007)

RPO Scoping Visit: Conduct base-wide assessments to identify opportunities to implement the RPO strategies.

Evaluation of Remedial Systems and Environmental Equipment: Conduct independent evaluation of remedial systems to determine their effectiveness.

Monitoring Optimization: Evaluate monitoring programs and plan/design optimization of environmental monitoring programs in accordance with the Robins AFB LTM guidance.

Perform temporal and spatial analysis of monitoring data using statistical and geostatistical software.

Remedial Process Evaluation and Optimization: Conduct remedial progress evaluations, including 5-year reviews of remedial action RODs; assess the effectiveness of remedial processes that are in place; demonstrate remedial actions operating properly and successfully;

and develop and implement remedial process optimization measures as necessary.

9.2.10 Treatability Studies, Pilot Tests, Bench Scale Tests, Remedial Actions (RAs)

Conduct treatability studies, bench-scale tests and/or pilot tests to determine optimum methods of contaminant delineation, removal of contaminants, and the degree of treatment anticipated using various processes. RAs may be required on a limited basis. Perform RAs as required to reduce or eliminate an immediate threat to human health or the environment. (CDRL A001)

9.2.11 Management Action Plans (MAPs)

Perform comprehensive developmental analysis, and planning in support of installation, customer, and major command programs and plan(s) for all environmental programs including pollution prevention, compliance, planning and restoration. Complete MAPs to incorporate all projects in a program, perform timeline and program forecast development, and establish tools to track the progress of base-level environmental programs. (CDRLs A001, A007)

9.2.12 Peer Review

Prepare peer review package(s). Include information to support the project requirement, technology selected, costs, funding timeline, and other project data to support the work identified. (CDRL A001)

9.2.13 Warranty of Installed Environmental Restoration Equipment and Systems

Assist the government in resolving warranty issues. Review installed equipment and prepare databases of equipment/systems with information such as scheduled maintenance, vendor sources, and warranty expiration dates. (CDRL A001)

9.3 Low Level Radionuclides

Support background determinations, in-situ sampling, and sampling of excavated materials in accordance with established regulations and federal standards for radionuclide cleanup. Submit a report of findings outlining the site conditions, selected methods of remediation, and associated costs. CDRLs A001)

9.4 Monitoring and Operations

Provide monitoring and operations optimization services for the discrete measuring, sampling and analysis of groundwater, surface water, influent/effluent, air emissions, soils, hazardous waste, hazardous materials, and other environmental media as specified in each TO. May include development through implementation of site-specific plan(s) including negotiations with administrators/regulators. (CDRL A001)

9.4.1 Long Term Monitoring (LTM) and Remedial-Action Operations (RAO)

Support optimization of LTM programs in accordance with LTM and RPO guidance. Assess data, propose updates, assist in negotiations, establish/implement RAO plans, implement tests, and develop O&M manuals and standard operating procedures. (CDRLs A001, A007)

9.4.2 Monitoring Well Installation, Upgrades, Treatment, Testing, and Repairs

Install monitoring wells, upgrade-existing-wells, and perform well rehabilitation. Test, repair, and properly close and abandon existing wells as required by the TO. (CDRLs A001, A007)

9.5 Record Keeping and Reporting

Support with information repositories and administrative records. Provide an information repository of documents applicable to the accomplishment of the TOs and maintain a database of pending deliverables, the corresponding CDRLs, and an on-line inventory of data management processes to ensure compliance with applicable regulations and AFCEC requirements. Prepare, compile, and maintain an administrative record containing pertinent information regarding project decisions. (CDRL A001)

9.6 Risk Assessments

Support with the development of Human Health Risk Assessments (HHRAs) and Ecological Risk Assessments (ERAs).

9.6.1 Human Health Risk Assessment

Complete HHRA as specified and submit Risk Screening Analyses (RSAs) and/or Full Risk Assessments (FRAs). Perform Risk Evaluation Preliminary Remediation Goals and submit a Risk Evaluation of Remedial Alternatives in conformance with regulatory guidance. Perform technical activities and analyses in support of risk assessment requirements to comply with federal, state, and local rules and regulations. Provide risk analyses for environmental, safety and health data using scientific and engineering expertise and risk assessment tools including risk management options and tradeoff analyses. These activities may include conducting and reviewing studies of community health concerns, evaluating current and historical on-site and off-site contamination data, and conducting pathway analyses. Conduct toxicological evaluations through literature and regulatory reviews. The review shall incorporate the past and present regulatory guidance with available risk related data. Based on risk assessment guidance outcome, develop and perform special toxicological studies to evaluate the study site's impact on health. (CDRL A001)

9.6.2 Ecological Risk Assessment (ERA)

Complete ERA as specified to comply with federal, state, and local rules and regulations.

Review data and make recommendations for an initial or scoping ERA to document actual/potential effects of contaminants on protected wildlife species, habitats, or environments.

Define the extent of contamination, evaluate the ecological effects of remedial alternatives, and develop the remediation criteria to conform to guidance following the three tiers in logical order.

These activities may include rapid bioassessments; fish kill investigations; Toxicity Reduction Evaluations (TREs); Toxicity Identification Evaluations (TIEs); ecological and risk assessment studies; particulate analysis of groundwater; evaluation of the effect of pollutants on ecosystems;

sludge pathogen testing; and other microbiological studies. (CDRLs A001, A002)

9.7 Storage Tank Management

9.7.1 Petroleum, Oils, and Lubricants and Other Storage Tank Management

Perform technical activities and analyses in…

This is the start of the file's text. The full file is on GovTribe.