This document is a Request for Qualifications (RFQ) for Architectural/Engineering Services for the Capital Circle Office Complex - Central Energy Plant, Design Chiller Replacement project issued by the Florida Department of Management Services (DMS). The RFQ seeks qualified firms to provide design services for the replacement of the HVAC chiller system at the Central Energy Plant. The project includes determining the appropriate increase in cooling capacity and any related modifications to the existing structure, though major structural changes are not anticipated. Interested firms must submit their qualifications, and DMS will shortlist firms to participate in the next phase. The selected firm will serve as the prime consultant, and both architectural and engineering services are required.

The RFQ provides responses to questions submitted, including confirmation that the current funding is anticipated to be increased by the legislature for the design and construction phases. Pricing details are not specified, but the RFQ indicates that DMS has construction documents for the existing Central Energy Plant that will be provided to the shortlisted firms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Qualifications for Architectural/Engineering Services for Capital Circle Office Complex – Central Energy Plant, Design Chiller Replacement

RFQ-REDM2223-12

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA

STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW

WITHIN THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF

PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES.

The Department’s responses to timely submitted questions are below.

Question Number Question Response

The current funding appears to be far short of the funding required for the equipment replacements listed in the General Description. Does DMS anticipate increased funding by the legislature for design and construction b during the next cycle?

Yes

Understanding that final equipment sizes will need to be based on calculations performed by the selected firm, does DMS have some idea of an anticipated increase in cooling capacity?

Equipment sizing will be determined in the design phase.

Will the anticipated increase in cooling capacity and the related increase in size of the new equipment require modifications to the existing CEP structure that require an architect and/or structural engineer to be on the design team?

Modifications to the existing structure are not anticipated.

Does the response to the RFQ require the qualification(s) of an architect and/or structural engineer to be submitted?

The qualifications of the person or personnel qualifying the firm need to be provided.

The RFQ for the CCOC CEP Chiller project indicates that there will be Architectural and Engineering services required. Can a qualified Engineer serve as the prime consultant, or will DMS prefer that an architect serve as the prime consultant?

A Engineer can serve as the prime consultant.

Is there a set of asbuilts for the Central Energy Plant?

DMS has construction document for the Central Energy Plant. Plans will be provided to the firms that are short listed.