Advertisement To Bid~13.pdf
PDF 107 KB Posted
- Attached to
- Fitchburg Road Sewer Main Extension - Phase 1
- Solicitation number
- BD-26-1652-PW240-PW240-134578
- Issued by
- Massachusetts
About this file
This is an Advertisement to Bid issued by the Town of Ayer, Massachusetts Department of Public Works for the Fitchburg Road Sewer Main Extension – Phase 1 project. The Town seeks sealed bids from General Contractors for construction of a new gravity sewer main on Fitchburg Road, including appurtenances, service connections, trench paving, and miscellaneous related work. All traffic management and road restoration work must comply with MassDOT standards and permit requirements. Bids will be received at the Ayer DPW Administrative building located at 25 Brook Street, Ayer, MA 01432 until Friday, December 11th, 2026 at 2:00 PM, at which time bids will be publicly opened and read aloud. The contract completion period is 150 calendar days following the Notice to Proceed, which will be issued no earlier than April 1st, 2027. Bidding and award procedures will follow M.G.L. Chapter 30, Section 39M. Electronic copies of contract documents are available at www.ayer.ma.us/Bids.aspx.
Each General Bid must be accompanied by a Bid Security equal to 5 percent of the bid amount, and bidders may not withdraw bids for 60 calendar days (excluding weekends and legal holidays) after the bid opening date. The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Prevailing wage rates as determined by the Massachusetts Commissioner of the Department of Workforce Development under M.G.L. Chapter 149, Sections 26 to 27D apply to this project. Contractors are responsible for obtaining current Prevailing Wage Rate information prior to bid opening. The Town reserves the right to waive any informality in or reject any or all bids in its best interest.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement To Bid~12.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00020-1
ADVERTISEMENT TO BID
27DPW03 - Fitchburg Road
SECTION 00020
ADVERTISEMENT TO BID
TOWN OF AYER, MASSACHUSETTS
FITCHBURG ROAD SEWER MAIN EXTENSION – PHASE 1
The Town of Ayer DPW is seeking bids for the "Fitchburg Road Sewer Main Extension – Phase 1” project.
Sealed Bids for the General Contract will be received from General Contractors for construction of the Fitchburg Road Sewer Main Extension – Phase 1 project at the Ayer DPW Administrative building at 25 Brook Street, Ayer, MA 01432 until Friday, December 11th, 2026, 2:00 (PM), and at that time and place bids will be publicly opened and read aloud.
The base bid consists of constructing a new gravity sewer main on Fitchburg Road. The work includes construction of gravity sewer main, appurtenances, service connections, trench paving and other miscellaneous work. All traffic management and road restoration work on Fitchburg Road is required to meet MassDOT standards and permit requirements. The time for completion of this contract is 150 calendar days following the Notice to Proceed. Please note, the Notice to Proceed to start construction will be issued no earlier than April 1st, 2027.
The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 30, Section 39M. Complete instructions for filing Bids are included in the Instructions to Bidders.
Each General Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 5 percent of the Bid.
No Bidder may withdraw his Bid for a period of sixty (60) days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the General Bids. This advertisement does not obligate the Owner for any costs associated with preparing or submitting bids.
The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner.
Minimum wage rates as determined by the Commissioner of the Department of Workforce Development under the provisions of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request, if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract.
Electronic copies of the Contract Documents will be available at www.ayer.ma.us/Bids.aspx.
The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest.
DEPARTMENT OF PUBLIC WORKS
AYER, MASSACHUSETTS
END OF SECTION