Advertisement_ Hwy 29 SR 14 Water Main Extens.pdf

PDF 13 KB Posted

Attached to
HIGHWAY 29 / STATE ROUTE 14 WATER MAIN EXTENSION
Solicitation number
PE-78456-NONST-2025-000000002
Issued by
Crisp County, Georgia

About this file

This document is an Advertisement for Bids issued by the City of Grantville, Georgia for the Highway 29 / State Route 14 Water Main Extension project. The project involves the installation of approximately 6,685 linear feet of 12" DIP water main, 280 linear feet of 8" DIP water main, 13 fire hydrant assemblies with valves, 10 12-inch gate valves, 7 8-inch gate valves, 96 linear feet of 20" steel casing installed by jack & bore method, 60 linear feet of 16" steel casing installed by jack & bore method, three connections to existing water mains, fittings, water service connections, water service lines and appurtenances, asphalt pavement patching, installation and maintenance of erosion control measures, traffic control, permanent grassing and other related work. Sealed bids will be received by the City of Grantville, Georgia until 2:00 p.m. on Thursday, October 17, 2024 and then publicly opened and read aloud. Bidders must possess a valid Georgia State Contractor's License and provide a 5% bid bond. The successful bidder must provide 100% performance and payment bonds within 10 days of the Notice of Award.

The Advertisement does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources. It states that the City of Grantville reserves the right to reject any and all bids and to waive irregularities, technicalities, and informalities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

City of Grantville, Georgia

123 LaGrange Street

Grantville, Georgia 30220

HIGHWAY 29 / STATE ROUTE 14 WATER MAIN EXTENSION

Sealed Bids will be received by the City of Grantville, Georgia for HIGHWAY 29 / STATE

ROUTE 14 WATER MAIN EXTENSION, which includes the installation of approximately 6,685 linear feet of 12" DIP water main, 280 linear feet of 8" DIP water main, 13 fire hydrant assemblies with valves,10 12-inch gate valves, 7 8-inch gate valves, approximately 96 linear feet of 20" steel casing installed by jack & bore method, 60 linear feet of 16" steel casing installed by jack & bore method, three connections to existing water mains, fittings, water service connections, water service lines and appurtenances, asphalt pavement patching, installation and maintenance of erosion control measures, traffic control, permanent grassing and other related work. The contractor will furnish all materials and perform all work associated with the project.

Separate sealed bids for construction of HIGHWAY 29 / STATE ROUTE 14 WATER MAIN

EXTENSION will be received by City of Grantville, Georgia (also referred to as Owner) from qualified Contractors to include all associated work labor and materials, equipment and appurtenances required to complete the work for HIGHWAY 29 / STATE ROUTE 14 WATER

MAIN EXTENSION as described herein.

Bids will be received at the City of Grantville, Georgia, 123 LaGrange Street, Grantville, Georgia

30220, at 2:00 p.m. legal local time, Thursday, October 17, 2024 and then publicly opened and read aloud. Bids submitted by mail or courier are required to be delivered before the Bid Opening time stated above and should be addressed to: City of Grantville, Georgia, 123 LaGrange Street, Grantville, Georgia 30220, Attention: Al Grieshaber, Jr.

No bid will be considered unless it is accompanied by satisfactory evidence that the Bidder holds

Georgia State Contractor's License of proper classification and in full force and effect, in compliance with Act. O.C.G.A. 43 14.

No bid may be modified, withdrawn, or canceled for a period of sixty (60) days after time designated for receipt of Bids, or until notified by Owner, whichever is sooner.

Bids must be accompanied by a certified check or Bid Bond in the amount of five percent of the bid amount. The successful bidder must be able to provide a Payment Bond and Performance Bond within ten days of Notice of Award. These bonds must be in the amount of 100 percent of the contract amount.

A non-collusion affidavit must be completed and submitted as part of the Contractor's bid.

City of Grantville, Georgia reserves the right to reject any and all bids and to waive irregularities, technicalities, and informalities.

The Contract Documents may be examined at the following locations:

Brennan Jones Engineering Associates, LLC

7513 Mason Falls Dr.

Winston, GA 30187

Office of the County Manager

123 LaGrange Street

ConstructConnect (CMD, AGC Builders Exchange, and iSqFt)

30 Technology Parkway S., Suite 100

Norcross, Georgia 30092

Sets of the Bid packages consisting of one set of plans and specifications may be obtained at the office of Brennan Jones Engineering Associates, LLC, the Engineer, upon payment of a nonrefundable fee of $200.00 for each set.

s/Al Grieshaber, Jr., City Manager

123 LaGrange Street

September 16, 2024

File details come from the government source that posted it. Updated .