ESTC Fire Training Equipment Storage Building - Site Work and Building Upfit Re-bid
Solicitation number
120-080526
Issued by
North Carolina

About this file

This is an advertisement for fire training equipment storage facility construction issued by the Randolph Community College (RCC) in North Carolina. The project involves the construction of a slab-on-grade concrete pad with anchor bolt setting and coordination with Cirrus Construction, Inc. for the erection of a 60-foot by 60-foot pre-engineered building. The interior upfit scope includes installation of a mechanical ventilation system, unit heaters, three overhead coiling doors, electrical power distribution, and overhead lighting. The project is a re-bid opportunity for the ESTC Fire Training Equipment Storage Building site work and building upfit phase.

The advertisement solicits construction bids from qualified contractors capable of executing the concrete foundation work and interior finishing within the pre-engineered building structure. Specific details regarding pricing terms, bid submission deadlines, site visit requirements, pre-bid conference scheduling, and contract award timelines should be referenced in the full advertisement document. Contractors are expected to coordinate closely with Cirrus Construction, Inc., the general contractor responsible for the building erection, to ensure sequencing and quality standards throughout the project delivery process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advertisement for Bids Rockingham Community College

Fire & Rescue Training Department Fire Training Equipment Storage Building

Sealed proposals will be received until 3:00 PM on August 27, 2026, in Rockingham Community College’s Administration Building - Gwyn Boardroom, 215 Wrenn Memorial Road, Wentworth, NC 27375 located on the main campus of Rockingham Community College. At that time and place bids will be opened and read aloud for furnishing of labor, material, and equipment to conduct site improvements to address clearing and grading of building pad for 60’ x 60’ pre-engineered building. Construction of slab on grade concrete pad, setting anchor bolts and to coordinate with Cirrus Construction, Inc.

for the erection of the pre-engineered building. The scope of work will include interior upfit of the pre-engineered building to address installation of the mechanical ventilation system and unit heats, placement of three overhead coiling doors, electrical power and overhead lighting. All work is to be per the project drawings and specifications.

A non-mandatory pre-bid meeting will be held at 10:00 AM on August 13, 2026, at the ESTC Classroom Building located at 222 NC-65, Reidsville, NC 27320 (entrance to the Fire Training Cener located between the NC National Guard and Rockingham County Judicial Center). Tours of the site will take place following the meeting

Complete plans and specifications for this project can be obtained from Efird Sutphin Pearce & Associates, PA; 2638 Willard Dairy Road, Suite 100, High Point, NC 27265 during normal office hours after August 5, 2026. Electronic drawings and specifications are available upon request to Efird Sutphin Pearce & Associates, PA at 336-803-4081.

Rockingham Community College Board reserves the unqualified right to reject any and all proposals and waiver informalities in bidding.

Signed: Trustees of Rockingham Community College

215 Wrenn Memorial Road Wentworth, NC 27375 Caleb Rorrer - Capital Projects Manager Phone: (336) 342-4261 Ext. 2306