This document is a pre-bid meeting summary for RFP 10-2025-021 (ERATE 470 No. 250010941) for additional wireless cabling services in Bartow County, Georgia. The project involves installing and relocating network drops for wireless access points across 20 school locations, with the goal of having wireless access points in every classroom instead of every other classroom. The project timeline runs from April 1, 2025, to the end of July 2025 (preferably mid-July), with proposal opening scheduled for February 5, 2024. Work hours are typically 7:30 a.m. to 4:00 p.m., with flexibility for alternative schedules, and vendors must be prepared to work around students present from April through late May 2025.
The project requires vendors to provide per-drop pricing, as the total number of new drops and drop moves is an estimate and may be adjusted downward. The work includes primarily copper cabling installations, with one fiber run of approximately 500 feet at Cass Middle School. Technical specifications include the use of NEMA20 PDUs, proper cable labeling, and color coding requirements as detailed in the RFP. All bidders must include their SPIN number in their bid or face disqualification, indicating this is an E-Rate funded project. The work involves using existing cable supports, and all locations are accessible using 10-12 foot ladders, with no scissor lifts required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cabling APs Switches Final10_2025_021.pdf | ||
| 010725 Prebid Meeting Sign In Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Wireless Cabling
RFP 10-2025-021 ERATE 470 No. 250010941
Mandatory Pre-Bid Meeting January 7, 2025 9:00 a.m.
Below is the information that was covered during the pre-bid meeting.
Agenda
General description of the project – Explained the project which is detailed in the RFP
Current situation – Explained that we have wireless access points in every other classroom and want to move to having one in every classroom. To accomplish this, we will be using some existing drops previously used for other systems and new drops that we are asking to be installed. The existing drops will need to be moved from the walls in the rooms to the ceiling toward the center of the room.
Location needs to route to – Explained that drops will for the most part route back to the closest MDF or IDF but there are some exceptions to this.
Sample Maps – Adairsville High, Adairsville Middle and Adairsville Elementary – Michael displayed the maps for these schools and explained that the red Xs are the locations where drops either need to be moved or added.
Access to Maps – We explained that we will send a link to email addresses shared on the sign in sheets that will give meeting attendees access to the maps for all locations.
Timing for project – We explained the expected timing of the project.
We will open proposals 2/5/2024 to grade, decide and make our recommendation for Board approval.
The project can start April 1, 2025 and we need it to finish by the end of July 2025, preferably mid July 2025.
7:30 a.m. – 4:00 p.m. are normal business hours. We explained that we can work with the vendor if they want to work other hours. We also mentioned that students will be present April 1, 2025 – late May 2025 and the vendor would need to be prepared to work around students. Some students may be in the building during the summer also.
Question and Answer Session
Can we provide the addresses for the 3 support locations? Below is a list of all locations, addresses and an indicator as to whether work will be done at each location or not for this project.
Location Location Full Name Location Address Project Work
AES Adairsville Elementary School 118 N Franklin Street Adairsville, GA 30103 Yes ALES Allatoona Elementary School 4150 New Hope Church Road Acworth, GA 30102 Yes CCES Clear Creek Elementary School 50 Pleasant Valley Road Cartersville, GA 30121 Yes CLES Cloverleaf Elementary School 291 Highway 20 Spur Cartersville, GA 30121 Yes EES Emerson Elementary School 220 Old Alabama Road Emerson, GA 30137 Yes EHES Euharlee Elementary School 1058 Euharlee Road Kingston, GA 30145 Yes HCES Hamilton Crossing Elementary School 116 Hamilton Crossing Road Cartersville, GA 30121 Yes KES Kingston Elementary 240 Hardin Bridge Road Kingston, GA 30145 Yes MRES Mission Road Elementary School 1100 Mission Road SW Cartersville, GA 30120 Yes PLES Pine Log Elementary School 1095 Cass Pine Log Road Rydal, GA 30171 Yes TES Taylorsville Elementary School 1502 Old Alabama Road Taylorsville, GA 30178 Yes WES White Elementary School 505 Colonel Way White, GA 30184 Yes
AMS Adairsville Middle School 485 Old Highway 41 Adairsville, GA 30103 Yes CMS Cass Middle School 195 Firetower Road Cartersville, GA 30120 Yes RTMS Red Top Middle School 224 Old Alabama Road Emerson, GA 30137 Yes WMS Woodland Middle School 1061 Euharlee Road Kingston, GA 30145 Yes
CHS Cass High School 1000 Colonel Way White, GA 30184 Yes AHS Adairsville High School 519 Old Highway 41 Adairsville, GA 30103 Yes WHS Woodland High School 800 Old Alabama Road Cartersville, GA 30120 Yes BCLC Bartow County Learning Center 738 Grassdale Road Cartersville, GA 30121 Yes
Maintenance Maintenance 86 Registration Drive Cartersville, GA 30121 No STARS Stars Preschool 86 Registration Drive Cartersville, GA 30121 No Transportation Transportation 86 Registration Drive Cartersville, GA 30121 No Bus Shop Transportation 86 Registration Drive Cartersville, GA 30121 No CO Central Office 65 Gilreath Road Cartersville, GA 30121 No
It was pointed out that Cass Middle School does need one fiber run. The fiber run needs to be run according to RFP details. The ESTIMATE of how long the fiber run will be is 500 feet.
All other cabling for this project is copper.
Are the schools regular dropped ceiling? Yes. However, there may be some exceptions in bathrooms and special areas. If we run into an area like this, we will work with the vendor for a solution.
How should wall penetration be handled? We do not expect there to be a need for this with this project. If a need for this arises, we will work with the vendor to develop a solution.
In discussion about the sample maps that was shown, we explained that we do have a specific list of rooms that drops need to be installed or moved. This list will be provided to the winning bid vendor.
Will cable supports need to be supplied? No, existing supports can be used.
Color coding of drops and cabling is covered in the RFP. For existing drops that are moved, only the parts that are replaced need to follow the RFP color coding. Existing parts that are not swapped out can remain whatever their current color is.
Drops that are moved should be toned, tested and labeled according to the RFP details.
All IDFs currently exist except one. An IDF needs to be added at EES in Storage Room 233 as indicated on the map. This IDF should be a Hubbel RE2 enclose or similar.
Drops that are moved hopefully have service loops that afford the extra cable needed. If not, a biscuit box with patch cable can be used.
An ESTIMATE of 15-20 feet was given for the expected move distance for drops that need to be moved.
Is it ok to run the drops to the nearest MDF/IDF even if that is not how current drops are run? Yes, as long as drops are labeled with MDF/IDF etc.
Is it ok to use Velcro for cable dressing? Yes, Velcro or zip ties.
All boxes that drops are moved from should be covered with a blank plate according to details in the RFP.
Are PDUs required to be NEMA20 or can they be NEMA15? NEMA20 per the details in the
RFP.
Attendees were reminded that they must include their SPIN number in their bid. If SPIN numbers are not included, bids will be disqualified.
In the RFP details, a quantity is given for New Drops and Additional New Drops. The total of both quantities should be quoted. ULTIMATELY A BASE PER DROP PRICE IS WHAT WE ARE LOOKING FOR. The number of new drops and drop moves is an ESTIMATE. We need the ability to reduce the chargeable amount for drops not needed.
Will these drop locations all be accessible by either a 10ft or 12ft ladder? Are there any locations that would require a scissor lift to reach? All locations are accessible by either a 10ft or 12ft ladder.