ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO

END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR RU17FEB216997,

MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES,

CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A

MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION FROM TSR RU17FEB216997.

***THE 50 METER SEPARATION IS WAIVED INSIDE BLDG 1636 FOR RALEIGH, NC OCATION.***

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWI NGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL D MARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE

SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND

ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO THE

GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE MET.

ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH

CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-

PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE

EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP)

AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT

ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.

THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT

BOTH LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: C618-418-8627, D418-8627. 14. THE

VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING

THEIR END-TO-END TESTING. PHONE: C618-418-8627, D418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST M. REMARKS CONTINUED:

FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR

EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP

INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE

EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR

MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT

THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24

HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)

IAW ITU-T-Y.1564.

VENDOR MUST MEET SERVICE DATE.

SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.

TESTING REQUIREMENTS

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB

ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS

DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT

CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE

GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION

UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-

T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES

STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:

ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY

THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

C618-418-8627, D418-8627.

2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF

THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING

THEIR END-TO-END TESTING.

6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY:

C618-418-9950, D418-9950 TOLL FREE: 855-868-9950.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE:

OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,

SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: C618-418-

8627 D418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING

PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% OR BETTER. O. REMARKS CONTINUED: FRAME LOSS SHALL BE EQUAL TO ZERO WHEN

TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS.

JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24

HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN

MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND

TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161

WILL NOTIFY DITCO IMMEDIATELY IN WRITING. ** DIVERSITY INFO: NETWORK DIVERSITY

REQUIRED: PATH DIVERSITY; COMMERCIAL DIVERSITY: NO; DIVERSITY FROM TSR

RU17FEB216997 ** ADDITIONAL PROVISIONING INFORMATION: DISA (DISN IP ROUTER

NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS)