This addendum modifies the procurement for precast concrete box culvert units for the CR-03 over West Settlement Creek Bridge Replacement Project issued by Greene County, Town of Halcott, New York (PIN 1762.66). Addendum No. 2, issued April 23, 2026, clarifies specifications for prospective fabricators and bidders submitting quotes due May 7, 2026. The addendum specifies that downstream precast bin walls labeled wingwall 3 and 4 shall be excluded from the current bid quote, as these components will be procured under a separate construction contract. Additionally, mechanical female dowel bars must be cast into the box culvert units, with corresponding mechanical male dowel bars to be provided by the County for two closure pour areas on the downstream side of the box where wingwall 3 and 4 will eventually connect. Bidders are directed to govern their bid quotes accordingly and contact Luke Short at Creighton Manning Engineering, (518) 689-1875, for clarification on these requirements.
This addendum serves as a critical modification to the original procurement documents and contract plans, narrowing the scope of work to exclude specific precast components while establishing the interface requirements between the current precast units and future construction phases. The modification ensures bidders understand precisely which precast elements are included in their quotes and clarifies the mechanical connection requirements necessary for future integration with wingwall 3 and 4, thereby preventing scope ambiguity and potential contract disputes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum1.pdf | ||
| Fabrication.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIN 1762.66
Addendum No. 02
APRIL 23, 2026
Town of Halcott Greene County, New York
ADDENDUM NO. 2 TO:
PROJECT: County Road 3 over West Settlement/Brownell Creek Bridge Replacement
PIN 1762.66
IN THE BID QUOTE OF
May 7, 2026
NOTICE TO PROSPECTIVE FABRICATORS/BIDDERS
Contract Plans
1. The downstream precast bin walls (labeled wingwall 3 and 4) shall not be included in the prospective fabricators/bidders bid quote for the precast units. Precast bin wall 3 and 4 will be part of a separate construction contract.
2. The mechanical female dowel bars shall be cast in the box, and the corresponding mechanical male dowel bars shall be provided to the County for the two closure pour areas on the downstream side of the box for the precast bin wall 3 and 4.
PLEASE BE GOVERNED ACCORDINGLY WHEN SUBMITTING BID QUOTES.
PLEASE CONTACT LUKE SHORT WITH CREIGHTON MANNING
ENGINEERING AT (518) 689-1875 WITH ANY QUESTIONS.