This is an Addendum No. 2 to the construction specifications for Phase II of the STEM Lab space modification project at Cass High School located at 1000 Colonel Way in White, Georgia, issued by the Bartow County School System on August 20, 2021. The addendum documents changes resulting from the mandatory pre-bid meeting held on August 18, 2021 at 9:00 am at Cass High School, with an attendance sign-in sheet included as Attachment A. The project modifications include updates to the project directory contact information, instructions to bidders directing questions to Mr. Albert Zielke at the Bartow County School System, and general requirements specifying that all construction work must occur after normal school hours, on weekends, and during school holidays. Additional contractor responsibilities include daily cleaning of work areas, protection of the existing HVAC system from construction dust, and removal of existing owner furniture to other campus locations as directed.
The addendum contains numerous changes to the original drawings and specifications across multiple sheets, including the addition of room signage at Room 2.030, modifications to cabinets in the Break Area 2.099, deletion of magnetic whiteboards and computer work counters in the STEM Lab 2.102, relocation of a writeable wall in STEM Lab 2.104, and various electrical modifications including dimmer switch relocations, fire alarm strobe light repositioning, and outlet changes in multiple lab spaces. The contractor is required to field verify existing concrete block wall dimensions before ordering new door frames and must coordinate with the architect regarding block cell conditions and wire routing options. Attachment B provides detailed cabinet modification drawings for the Break Area 2.099.
Text of this file
ADDENDUM NO. 2
August 20, 2021
ADDENDUM NO. 2
PHASE II – STEM LAB
CASS HIGH SCHOOL
1000 Colonel Way White, Georgia
MANDATORY PRE-BID MEETING:
[A copy of the Sign In Sheet for the Mandatory Pre-Bid Meeting conducted Wednesday, August 18, 2021 at 9:00 am at the Cass High School, is included as Attachment ‘A’ located at the end of this Addendum.]
CHANGES TO SPECIFICATIONS:
SECTION 00002 – PROJECT DIRECTORY
Page 00002-1/Owner – last line
CHANGE:
[E-mail: pan………k12.ga.us]
TO READ:
[E-mail: joe.millsaps@bartow.k12.gs.us]
SECTION 00100 – INSTRUCTIONS TO BIDDERS
Page 00100-1/Paragraph 3
CHANGE TO READ:
[3. QUESTIONS
Submit all questions in writing to Mr. Albert Zielke, Purchasing Specialist, Bartow County School System, at albert.zielke@bartow.k12.ga.us.]
SECTION 01100 – SUMMARY OF WORK
Page 01100-2/Paragraph 1.8
ADD THE FOLLOWING:
[1.8 GENERAL REQUIREMENTS
A. All construction work must be performed after the normal school hours (Owner will provide the exact start time at the pre-construction meeting) during the week, on weekends, and on days when school is out for holidays.
B. The Contractor must clean the construction work area and other areas that have been disturbed at the end of each work day and before staff and students arrive the next morning.
C. The Contractor must protect the existing HVAC system while they are working within the construction areas from construction dust.
D. The Contractor is responsible for removing the Owner’s existing furniture, currently located inside the construction areas, to another location on campus as determined by the Owner.]
CHANGES TO DRAWINGS:
SHEET T1.01
SCOPE OF WORK (as noted in Addendum No. 1)
[ADD one (1) additional Room Signage to be installed at existing Room 2.030.
Contractor shall remove the existing signage and install new signage. Repair wall as required. The new signage shall match the existing signage style and color and read:
SHEET A1.01
GENERAL NOTES AND SCHEDULE
DELETE:
[ 1. Work will………..campus.
2. Any work………..the day.
3. If work……….school day.]
ADD THE FOLLOWING:
[ 1. All construction work must be performed after the normal school hours (Owner will provide the exact start time at the pre-construction meeting) during the week, on weekends, and on days when school is out for holidays.
2. The Contractor must clean the construction work area and other areas that have been disturbed at the end of each work day and before staff and students arrive the next morning.
3. The Contractor must protect the existing HVAC system while they are working within the construction areas from construction dust.
4. The Contractor is responsible for removing the Owner’s existing furniture, currently located inside the construction areas, to another location on campus as determined by the Owner.]
SHEET A2.01
DETAILS 3/A2.01, 4/A2.01, & 5/A2.01
ADD THE FOLLOWING NOTE:
[The Contractor shall field verify that the existing concrete block wall is 6” CMU before ordering the new door frame.]
SHEET A2.02
PLAN 1/A2.02 – BREAK AREA 2.099
[MODIFY the existing cabinets as shown in Attachment ‘B’ which is attached at the end of this Addendum]
PLAN 1/A2.02 – STEM LAB 2.102
[DELETE the requirement for the two (2) new magnetic white boards]
PLAN 1/A2.02 – STEM LAB 2.102
[DELETE the requirement for the new 42 inch high Computer Work Counter]
PLAN 1/A2.02 – STEM LAB 2.104
ADD THE FOLLOWING REQUIREMENT
[The requirement for the construction of the writeable wall shown on the wall between Stem Lab 2.104 and Stem Lab 2.101 shall be changed to the opposite wall in Stem Lab 2.104, extending from the exterior wall to the Corridor 2.100 wall. All existing electrical devices shall also be extended to the face of the new construction.]
SHEET E1.01
PLAN 1/E1.01 – BREAK AREA 2.099 and STEM LAB 2.102 [DELETE the reference to note 2 and note 3 in these spaces.]
SHEET E2.01
PLAN 1/E2.01 – STEM LAB 2.101
[REMOVE the two (2) light switches (dimmers) shown on the left side of the left (from room side) corridor door. Install a blank stainless steel cover plate. Install two (2) new dimmer switches on the right side of the right corridor door. Install new wiring concealed in the existing block wall. If the Contractor determines that the block cells are filled with grout, notify the Architect and install from the ceiling in new wire mold.]
PLAN 1/E2.01 – BREAK AREA 2.099 and STEM LAB 2.102
[DELETE the reference to note 2. The existing light switches are to remain.]
PLAN 1/E2.01 – STEM LAB 2.102
[DELETE the reference to note 3.]
PLAN 2/E2.01 – STEM LAB 2.101
[CHANGE the location of the existing Fire Alarm Strobe Light to the left side of the existing left (from room side) corridor door. Contractor shall review the exact location with the Architect before relocating. Install a blank stainless steel cover plate over the old location. Install new wiring concealed in the existing block wall. If the contractor determines that the block cells are filled with grout, notify the Architect and install from the ceiling in new wire mold.]
PLAN 2/E2.01 – STEM LAB 2.101
[DELETE the requirements for the new Data outlet.] [CHANGE the new electrical outlet (shown with note 8) to a recessed type installation.
Raceway must be concealed in the wall.]
PLAN 2/E2.01 – STEM LAB 2.104
[CHANGE notes 2, 3, and 5 to point to the opposite wall as noted in this Addendum on Sheet A2.02.]
PLAN 2/E2.01 – STEM LAB 2.102
[DELETE the requirements for the new Data outlets shown in this space.] [CHANGE the requirements of the length of the new wall mounted wire mold raceway to extend only six (6) feet to the left from the corner of the room with one (1) double electrical outlet at the end of the raceway.] [CHANGE the new electrical outlet (shown with note 8) to a recessed type installation.
Raceway must be concealed in the wall.]
ATTACHMENTS:
I – Copy of Mandatory Pre-Bid Sign In Sheet.
II- Cabinet Changes in Break Area 2.099
END OF ADDENDUM NO. 2
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Addendum #1 | — | |
| Addendum #3 | — | |
| stem lab II | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .