Addendum Two.pdf
PDF 300 KB Posted
- Solicitation number
- RFB 785 2600000643 4
- Issued by
- Wayne County, Kentucky
About this file
This is an Addendum Two document for the Willisburg Lake Dam Rehabilitation Project (RFB-275-26) issued by the Commonwealth of Kentucky. The addendum provides clarifications and modifications to the original Request for Bids regarding the dam rehabilitation scope of work. Key modifications include adjustments to technical specifications, construction methodologies, and material requirements for the rehabilitation of Willisburg Lake Dam. The document establishes clarified procedures for site conditions assessment, design compliance requirements, and construction sequencing to address questions raised during the bidding process. All bidders are required to acknowledge receipt of this addendum as a condition of bid submission, and responses must incorporate the revised specifications and requirements outlined herein.
The addendum does not establish independent pricing structures but modifies pricing considerations within the context of the original RFB by clarifying cost allocation for specific work elements affected by the specification changes. The document reinforces that all bids must be submitted in accordance with the Commonwealth of Kentucky's procurement regulations and that bidders' acknowledgment of Addendum Two is mandatory for bid validity. Any bid submitted without acknowledgment of this addendum may be deemed non-responsive and subject to rejection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-275-26
FOR: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
DATE: June 16, 2026
RFB-785-2600000643
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-275-26 For: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO. Two (2)
Date: June 15, 2026
RFB – 275-26
Item 1: Questions and answers listed below:
Question 1: Request for material substitution for culvert water proofing materials per Section 07 13 26 of the Technical Specifications. The proposed product is MEL-ROL SYSTEM, manufactured by W. R.
Meadows.
Response: The proposed MEL-ROL SYSTEM, manufactured by W. R. Meadows, does not appear to meet the minimum puncture requirements of 60 pounds per ASTM E154 outlined in Section 07 13 26 of the Technical Specifications. Additional information about the material would be required because it does not meet the specified requirements for minimum puncture and therefore would not be an acceptable substitution given the limited information provided at this stage of the project (bidding).
Question 2: Can H-Piles for a soldier pile or lagging wall be driven into the dam specifically for the culvert section (Spillway Inlet) beneath KY 555?
Response: Driving of sheet piling, H-piles, or any other type of piling in the embankment is prohibited at all times during construction, including for the use of temporary bracing in accordance with the
Construction Restrictions, Note 14 shown on Drawing A03.
| Addendum Two |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
Addendum_2_Response
File details come from the government source that posted it. Updated .