This is Addendum No. 2 to Invitation to Bid (RFB) No. RFB-67-25 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for soil erosion repair at the Eastern Kentucky Correctional Complex in Morgan County, Kentucky, under the Department of Corrections. The addendum directs bidders to reference an additional addendum to be distributed by Lynn Imaging for all specifications and drawings modifications. Additionally, the addendum provides responses to five questions submitted by bidders prior to the established deadline: brush and tree burning from clearing operations is permitted with Site Representative coordination; no known borrow area exists on site; no known waste area exists on site; existing rock from eroded ditches may be reused for outlet aprons if it meets minimum size requirements for channel lining; and contractors are responsible for repairs to existing paved roads used for equipment and material delivery.

No pricing terms, set-aside provisions, incumbent information, funding sources, or contract award timeline are specified in this addendum document. The addendum serves primarily as a clarification document addressing contractor inquiries regarding project execution and site conditions rather than establishing commercial or financial terms.

View the file

Other files

File Type Posted
Final_RFB_785_2500000115_2_SO_FORM.PDF PDF
Addendum One .pdf PDF
Final_RFB_785_2500000115_1_SO_FORM.PDF PDF
Final_RFB_785_2500000115_3_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-67-25

FOR: Soil Erosion Repair Eastern Kentucky Correctional Complex Department of Corrections Morgan County, Kentucky

DATE: September 18, 2024

RFB-785-2500000115

ADDENDUM NO. Two (2)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-67-25 For: Soil Erosion Repair Eastern Kentucky Correctional Complex Department of Corrections

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-67-25

FOR: Soil Erosion Repair

Eastern Kentucky Correctional Complex

DATE: September 18, 2024

RFB-785-2500000115

ADDENDUM NO. TWO (2)

BIDDER SHALL REVIEW THE RESPONSES TO THE FOLLOWING QUESTIONS SUBMITTED TO THE

ENGINEER PRIOR TO THE DEADLINE ESTABLISHED IN ADDENDUM NO. 1

1. Will burning of brush and trees from clearing operations be allowed on site? Yes, burning will be allowed but must be coordinated with the Site Representatives.

2. Is there a borrow area onsite for soil if needed? There is not a known borrow area on site.

3. Is there a waste area on site if one is needed? There is not a known waste area on site.

4. Could the existing rock in the eroded ditches be used for the Outlet Aprons? Yes, if the rock meets or exceeds the minimum size requirement for the channel lining

5. Deliveries of equipment and materials for the project will need to be hauled over existing paved roads to access site, will contractor be responsible for repairs if any are needed? Yes, the Contractor will be responsible.

END OF ADDENDUM

Invitation to Bid No. RFB-67-25 For: Soil Erosion Repair

Eastern Kentucky Correctional Complex

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Addendum Two
RFB-67-25 Addendum #2

File details come from the government source that posted it. Updated .