Addendum Two .pdf

PDF 266 KB Posted

Attached to
RFB-37-26 DOC BCFC Wastewater Treatment Plant Generator
Solicitation number
RFB-785-2600000050-3
Issued by
Bell County, Kentucky

About this file

This document is an Addendum (No. Two) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for Invitation to Bid No. RFB-37-26. The project involves a Generator Replacement at the Wastewater Treatment Plant located at the Bell County Forestry Camp, Department of Corrections in Pineville, Kentucky, dated August 27, 2025. The addendum provides three key modifications to the original bid documents: (1) references an additional addendum to be distributed by Lynn Imaging with specification and drawing changes, (2) updates technical specifications including changing the generator foundation/slab elevation to 1430.36, increasing foundation depth from 1'-6" to 2'-6", and relocating the generator set, and (3) adds Caterpillar to the list of acceptable generator manufacturers.

The addendum is part of a competitive bidding process for a generator replacement project, with the bid number RFB-785-2600000050. The document is signed by Susan Ward, Statewide Procurement Analyst II, and includes an electrical site plan (ES-101) from GRW Engineers, Inc. showing the precise location and elevation details for the generator installation. The site plan indicates the project is located within the Bell County Forestry Camp in Pineville, Kentucky, with specific site measurements and elevation notes provided to guide potential bidders in understanding the exact project requirements and site conditions.

View the file

Other files

File Type Posted
Final_RFB_785_2600000050_3_SO_FORM.PDF PDF
Addendum One .pdf PDF
Final_RFB_785_2600000050_1_SO_FORM.PDF PDF
Final_RFB_785_2600000050_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-37-26

FOR: Generator Replacement Wastewater Treatment Plant Bell County Forestry Camp Department of Corrections Pineville, Kentucky

DATE: August 27, 2025

RFB-785-2600000050

ADDENDUM NO. Two (2)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

Item 2: 1. Sheet S-101: GENERATOR FOUNDATION/SLAB PLAN, the elevation for the top of slab shall be 1430.36.

2. Sheet S-101, SECTION 1, Change foundation depth from 1’-6” to 2’-6”.

3. Sheet ES-101, see revisions in attached Partial Drawing, where the generator set is being relocated, in lieu of the location indicated in the bid documents, and is dimensioned for its precise location.

Item 3: Section 2632113, Page 2, Article 2.1B, Item 1, Add Caterpillar to the acceptable manufacturers.

END OF ADDENDUM

Invitation to Bid No. RFB-37-26 For: Generator Replacement Wastewater Treatment Plant Bell County Forestry Camp Department of Corrections Pineville, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

4.8328' 25.7507'

ELEV: 1430.29

EXISTING FENCE

GRW ENGINEERS, INC.

801 CORPORATE DRIVE

LEXINGTON, KY.

(859) 223-3999 / FAX (859) 223-8917

engineering architecture geospatial www.grwinc.com

ES-101

ELECTRICAL SITE PLAN - ADDENDA 1

AutoCAD SHX Text

DECA LOG #

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FRANKFORT, KENTUCKY

AutoCAD SHX Text

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

AutoCAD SHX Text

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

AutoCAD SHX Text

FINANCE AND ADMINISTRATION CABINET

AutoCAD SHX Text

COMMONWEALTH OF KENTUCKY

AutoCAD SHX Text

PON:

AutoCAD SHX Text

BELL COUNTY FORESTRY CAMP

AutoCAD SHX Text

PINEVILLE, KENTUCKY

AutoCAD SHX Text

WWTP GENERATOR REPLACEMENT

AutoCAD SHX Text

JULY, 2025

AutoCAD SHX Text 2-785-2300001529

AutoCAD SHX Text

EXCERPT FROM ES-101

Addendum Two
ES-101 REVISIONS
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .