Addendum Two .pdf
PDF 82 KB Posted
- Solicitation number
- RFB-785-2500000213-5
- Issued by
- Lewis County, Kentucky
About this file
This document is an Addendum Two to Invitation to Bid No. RFB-115-25 issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for the Boonesborough Firing Range Upgrade project for the Department of Criminal Justice Training in Richmond, Kentucky.
The addendum outlines changes to the specifications and/or drawings, which will be distributed by Lynn Imaging. It also addresses potential requirements for shoring of the restroom concrete roof during Men's 'wet' CMU wall removal, the possibility of encountering rock while trenching utilities, and the need for vegetation removal, for which general contractors are to provide unit pricing. Additionally, the addendum notes that some trees may need to be removed or have their roots cut, potentially killing the trees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-115-25
FOR: Boonesborough Firing Range Upgrade Department of Criminal Justice Training Richmond, Kentucky
DATE: November 13, 2024
RFB-785-2500000213
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-115-25 For: Boonesborough Firing Range Upgrade Department of Criminal Justice Training Richmond, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Addendum Two
RFB-115-25
• Will shoring of the Restroom concrete roof need to be provided during the Men’s ‘wet’ CMU wall removal.
o Do not anticipate that this would need to be required.
• Possibility that rock may be encountered while trenching utilities.
o GCs to provide a Unit Price for trenching.
• Trenching and trees along the way. Some trees may need to be removed and some may have their roots cut potentially killing said trees.
o GCs to provide a Unit Price for vegetation removal.
| Addendum Two |
| Addendum Two |
File details come from the government source that posted it. Updated .