Addendum Three.pdf
PDF 1 MB Posted
- Attached to
- RFB-77-25 DMA London Exterior Upgrade
- Solicitation number
- RFB-785-2500000114-4
- Issued by
- Jessamine County, Kentucky
About this file
This document is an addendum for Invitation to Bid No. RFB-77-25 for Exterior Repairs to the London Readiness Center for the Department of Military Affairs, Commonwealth of Kentucky. The addendum clarifies the requirements of the plans, including the addition of four MEP sheets to the contract documents. The official bid date has been moved to September 24, 2024 at 1:30 P.M. Eastern Time. Bidders are required to acknowledge receipt of the addendum in their proposal.
The contract will involve exterior repairs to the London Readiness Center. Contractors are required to temporarily move and protect all equipment and infrastructure as needed to complete the structural modifications, and then reinstall the equipment to its original condition unless noted otherwise. Specific instructions are provided for the handling of the existing HVAC ductwork, water piping, and gas lines during the construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-77-25
FOR: Exterior Repairs London Readiness Center Department of Military Affiars London, Kentucky
DATE: September 17, 2024
RFB-785-2500000114
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Official Bid Date has moved to September 24, 2024 @ 1:30 P.M. Eastern Time
END OF ADDENDUM
Invitation to Bid No. RFB-77-25 For: Exterior Repairs London Readiness Center Department of Military Affiars London, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO.3
9/17/2024
To: All Planholders
From: alt32 Architecture | Design 310 Old Vine Street, Suite 300 Lexington, KY 40507-1534
Re: RFB-77-25 DMA - London Exterior Repairs, 095CAXDLD1700
This addendum is (1) Pages of 8-1/2 x 11
The purpose of this addendum is to clarify further the requirements of the plans. The contractors are governed by the information in the addendum as if included in the plans. The addendum is part of the contract documents. The bidders shall acknowledge receipt of the addendum in their form of proposal.
1) The four (4) attached MEP sheets are to be part of the contract documents.
End of Addendum.
© COPY RIGHT NOTICE: THIS DOCUMENT IS PROPERTY OF N3D GROUP AND SHALL NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT.
M a r
:1 p m
B y:
st a ti o n
DRAWING NO.
AS BUILT DATE
DECA LOG #
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
DMA - LONDON EXTERIOR REPAIRS
ACCOUNT NO.
095-CAXD-LD17-00
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
A & E FILE NO.
04/23/2024
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
PHASE
RTA DATE
04/23/2024
RTA
3150 HWY 2227
Somerset, KY 42503 t: 606.219.6369 www.n3dgroup.com
Newman Nieman Daukas
AFH
SYMBOLS ABBREVIATIONS AND DETAILS
PME001STAFF
ABBREVIATIONS - ELECTRICAL
A AMPS
AFCI (AFI) ARC FAULT CIRCUIT INTERRUPT
AFF ABOVE FINISHED FLOOR
AIC AMPERE INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CP CONTROL PANEL
EA EACH
ELEC ELECTRICAL
EM EMERGENCY
EX / EXIST EXISTING
FA FIRE ALARM
FLA FULL LOAD AMPS
GFCI (GFI) GROUND FAULT CIRCUIT INTERRUPT
GND (G) GROUND
I/O INPUT / OUTPUT
KW KILOWATTS
LCK LOCKABLE
MCB MAIN CIRCUIT BREAKER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MLO MAIN LUGS ONLY
MTS MANUAL TRANSFER SWITCH
N NEUTRAL
PA PUBLIC ADDRESS
PH / Ø PHASE
PNL PANEL
SCCR SHORT CIRCUIT CURRENT RATING
SF SQUARE FOOT
SPD SURGE PROTECTIVE DEVICE
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSER
TYP TYPICAL
UG UNDERGROUND
V VOLTS
VA VOLT AMPERES
W WIRE
WG WIRE GUARD
WP WEATHER PROOF
ABBREVIATIONS - MECHANICAL
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLER UNIT
AV AIR VALVE
B BOILER
BC BLOWER COIL
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
C CHILLER
CH CEILING HEATER
CH CHILLER
CU CONDENSING UNIT
CWP CHILLED WATER PUMP
DB DRY BULB
DN DOWN
E EXHAUST
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
EWH ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
EX OR EXIST EXISTING
EXP EXPANSION
EXT EXTERNAL
FCU FAN COIL UNIT
FT FOOT OR FEET
GPM GALLONS PER MINUTE
GRV GRAVITY ROOF VENTILATOR
HP HORSE POWER
HP HEAT PUMP
HPWR HEAT PUMP WATER RETURN
HPWS HEAT PUMP WATER SUPPLY
HVAC HEATING, VENTILATION AND AIR CONDITIONING
HWP HOT WATER PUMP
IN INCH
KW KILOWATT
L LOUVER
LAT LEAVING AIR TEMPERATURE
LB POUNDS
MAU MAKE-UP AIR UNIT
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
NC NOISE CRITERIA
OA OUTSIDE AIR
PD PRESSURE DROP
PE POLYETHYLENE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R RETURN
RA RETURN AIR
RTU ROOF TOP UNIT
SA SUPPLY AIR
SF SUPPLY FAN
SP STATIC PRESSURE
TOA TEMPERED OUTSIDE AIR
TYP TYPICAL
UH UNIT HEATER
UV UNIT VENTILATOR
VAV VARIABLE AIR VOLUME
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WSHP WATER SOURCE HEAT PUMP
ABBREVIATIONS - PLUMBING
AFF ABOVE FINISHED FLOOR
BCO BI-DIRECTIONAL CLEAN OUT
CO CLEAN OUT
CW COLD WATER - DOMESTIC
FD FLOOR DRAIN
HB HOSE BIBB
HW HOT WATER - DOMESTIC
HWR HOT WATER RETURN - DOMESTIC
OR OPEN RECEPTACLE
R.I. ROUGH-IN
VTR VENT THROUGH ROOF
WH WALL HYDRANT
W.H.A. WATER HAMMER ARRESTER
SYMBOLS - ELECTRICAL
SYMBOL DESCRIPTION
LIGHT SWITCH - 3: 3-WAY, 4: 4-WAY, K: KEYED, OS:
OCCUPANCY SENSOR, D: DIMMING, MS: MOTOR
STARTER, LV: LOW VOLTAGE W/ PRESETS, W:
WIRELESS
EXIT SIGN, SINGLE AND DOUBLE FACE
DUPLEX RECEPTACLE
SURFACE MOUNTED DUPLEX RECEPTACLE
JUNCTION BOX
SAFETY SWITCH
CIRCUIT HOME RUN
CONCEALED CIRCUIT WIRING
COMMUNICATIONS JACK - X: NUMBER OF
TERMINATIONS, -X: TYPE OF TERMINATION - D:
DATA, T: TELEPHONE, C: CABLE, V: VOICE
J
S
X-X
X
SYMBOLS - MECHANICAL
SYMBOL DESCRIPTION
DUCTWORK - SUPPLY
DUCTWORK - RETURN
DIFFUSER - SUPPLY
DIFFUSER - RETURN
THERMOSTAT - X = V - VENTILATION, H - HEAT,
NONE - NORMAL OPERATIONT
X
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text 36704
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
AARON F.
AutoCAD SHX Text
HALL
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text K
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text K
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text O
6 5 6
E102
E102E103
E103
EAST WALL
WEST WALL
SOUTH WALL NORTH WALL
RTU-E 7
CONTRACTOR SHALL TEMPORARILY
MOVE AND PROTECT ALL
EQUIPMENT AND INFRASTRUCTURE
AS REQUIRED SO THAT
STRUCTURAL MODIFICATIONS CAN
BE COMPLETED. EQUIPMENT AND
INFRASTRUCTURE SHALL BE
REINSTALLED TO EXISTING
CONDITION UNLESS NOTED
OTHERWISE.
ROOM
ROOM
D.E.E.R.S.
ROOM
LOBBY/
CORRIDOR
ROOM
ROOM
ROOM
ROOM
17 ROOM
ROOM
KITCHEN
ROOM
ROOM
ROOM
MEN'S R.R.
WOMEN'S R.R.
MECH.
LACTATION
STORAGE
ROOM
ROOM
ASSEMBLY HALL
© COPY RIGHT NOTICE: THIS DOCUMENT IS PROPERTY OF N3D GROUP AND SHALL NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT.
r
:2 p m
B y:
st a ti o n
DRAWING NO.
1204 Winchester Rd Suite 200
Lexington, KY 40505 t: 859.303.5708 www.n3dgroup.com
Newman Nieman Daukas
AS BUILT DATE
DECA LOG #
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
DMA - LONDON EXTERIOR REPAIRS
ACCOUNT NO.
095-CAXD-LD17-00
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
A & E FILE NO.
04/23/2024
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
PHASE
RTA DATE
04/23/2024
RTA
JAN
PLUMBING AND MECHANICAL FLOOR PLAN
PM101STAFF
PLUMBING AND MECHANICAL FLOOR PLAN
SCALE: 1/8" = 1'-0"
SHEET NOTES:
REMOVE EXISTING DUCTWORK BACK TO WALL
PENETRATION FOR STRUCTURAL MODIFICATIONS.
DUCTWORK IS SUSPENDED FROM STRUCTURE BY
AIRCRAFT CABLE. SALVAGE AND PROTECT
DUCTWORK DURING CONSTRUCTION. REINSTALL IN
THE SAME LOCATION AFTER STRUCTURAL WORK IS
COMPLETE.
PROVIDE TEMPORARY BARRIER FOR SUPPLY AND
RETURN PENETRATIONS DURING CONSTRUCTION.
REMOVE EXISTING SURFACE MOUNTED WATER
PIPING BACK TO POINT INDICATED. REINSTALL IN
THE SAME LOCATION AFTER STRUCTURAL
MODIFICATIONS ARE COMPLETE. PROVIDE NEW
INSULATION ON PIPING THAT IS BEING REINSTALLED.
PROVIDE NEW FROST FREE WALL HYDRANT AND
CONNECT TO PIPING THAT IS BEING REINSTALLED.
EXISTING WATER LINE PENETRATION THROUGH
WALL SHALL BE PROTECTED AND MAINTAINED.
EXISTING GAS LINE PENETRATION THROUGH WALL
SHALL BE PROTECTED AND MAINTAINED.
ROOFTOP UNIT SHALL NOT BE OPERATED DURING
CONSTRUCTION.
PROVIDE TEMPORARY HEATING FOR THIS SPACE
DURING CONSTRUCTION. REFER TO
SPECIFICATIONS FOR REQUIREMENTS.
GENERAL NOTES:
· CONTRACTOR SHALL STORE AND PROTECT
EXISTING DUCTWORK THAT IS BEING REMOVED.
COVER DURING CONSTRUCTION AND WIPE CLEAN
PRIOR TO REINSTALLATION.
· CONTRACTOR SHALL DISCONNECT OR SHUT OFF
SECTIONS OF WATER AND GAS PIPING THAT ARE
IN THE AREA OF STRUCTURAL MODIFICATIONS.
0 4' 8' 16'
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text 16925
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
JOHN A.
AutoCAD SHX Text
NEWMAN
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text K
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text K
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text T
APPROXIMATE LOCATION OF STRUCTURAL IMPROVEMENTS
(TYPICAL OF ALL LINES INDICATED). REFER TO
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
APPROXIMATE LOCATION OF STRUCTURAL IMPROVEMENTS
(TYPICAL OF ALL LINES INDICATED). REFER TO
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
© COPY RIGHT NOTICE: THIS DOCUMENT IS PROPERTY OF N3D GROUP AND SHALL NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT.
r
:2 p m
B y:
st a ti o n
DRAWING NO.
1204 Winchester Rd Suite 200
Lexington, KY 40505 t: 859.303.5708 www.n3dgroup.com
Newman Nieman Daukas
AS BUILT DATE
DECA LOG #
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
DMA - LONDON EXTERIOR REPAIRS
ACCOUNT NO.
095-CAXD-LD17-00
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
A & E FILE NO.
04/23/2024
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
PHASE
RTA DATE
04/23/2024
RTA
JAN
0 2' 4' 8'
PLUMBING AND MECHANICAL ELEVATION PLAN
PM102STAFF
PLUMBING AND MECHANICAL ELEVATION NORTH WALL
SCALE: 1/4" = 1'-0"
PLUMBING AND MECHANICAL ELEVATION EAST WALL
SCALE: 1/4" = 1'-0"
SHEET NOTES:
REMOVE EXISTING DUCTWORK BACK TO WALL
PENETRATION FOR STRUCTURAL MODIFICATIONS.
DUCTWORK IS SUSPENDED FROM STRUCTURE BY
AIRCRAFT CABLE. SALVAGE AND PROTECT
DUCTWORK DURING CONSTRUCTION. REINSTALL IN
THE SAME LOCATION AFTER STRUCTURAL WORK IS
COMPLETE.
EXISTING GAS LINE PENETRATION THROUGH WALL
SHALL BE PROTECTED AND MAINTAINED.
REMOVE EXISTING SURFACE MOUNTED WATER
PIPING BACK TO POINT INDICATED. REINSTALL IN
THE SAME LOCATION AFTER STRUCTURAL
MODIFICATIONS ARE COMPLETE. PROVIDE NEW
INSULATION ON PIPING THAT IS BEING REINSTALLED.
PROVIDE NEW FROST FREE WALL HYDRANT AND
CONNECT TO PIPING THAT IS BEING REINSTALLED.
EXISTING WATER LINE PENETRATION THROUGH
WALL SHALL BE PROTECTED AND MAINTAINED.
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text 16925
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
JOHN A.
AutoCAD SHX Text
NEWMAN
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text K
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text K
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text T
APPROXIMATE LOCATION OF STRUCTURAL IMPROVEMENTS
(TYPICAL OF ALL LINES INDICATED). REFER TO
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
44 3
APPROXIMATE LOCATION OF STRUCTURAL IMPROVEMENTS
(TYPICAL OF ALL LINES INDICATED). REFER TO
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
© COPY RIGHT NOTICE: THIS DOCUMENT IS PROPERTY OF N3D GROUP AND SHALL NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT.
r
:2 p m
B y:
st a ti o n
DRAWING NO.
1204 Winchester Rd Suite 200
Lexington, KY 40505 t: 859.303.5708 www.n3dgroup.com
Newman Nieman Daukas
AS BUILT DATE
DECA LOG #
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
DMA - LONDON EXTERIOR REPAIRS
ACCOUNT NO.
095-CAXD-LD17-00
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
A & E FILE NO.
04/23/2024
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
PHASE
RTA DATE
04/23/2024
RTA
JAN
0 2' 4' 8'
PLUMBING AND MECHANICAL ELEVATION FLOOR PLAN
PM103STAFF
PLUMBING AND MECHANICAL ELEVATION SOUTH WALL
SCALE: 1/4" = 1'-0"
PLUMBING AND MECHANICAL ELEVATION WEST WALL
SCALE: 1/4" = 1'-0"
SHEET NOTES:
REMOVE EXISTING DUCTWORK BACK TO WALL
PENETRATION FOR STRUCTURAL MODIFICATIONS.
DUCTWORK IS SUSPENDED FROM STRUCTURE BY
AIRCRAFT CABLE. SALVAGE AND PROTECT
DUCTWORK DURING CONSTRUCTION. REINSTALL IN
THE SAME LOCATION AFTER STRUCTURAL WORK IS
COMPLETE.
PROVIDE TEMPORARY BARRIER FOR SUPPLY AND
RETURN PENETRATIONS DURING CONSTRUCTION.
EXISTING WATER LINE PENETRATION THROUGH
WALL SHALL BE PROTECTED AND MAINTAINED.
EXISTING GAS LINE PENETRATION THROUGH WALL
SHALL BE PROTECTED AND MAINTAINED.
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text 16925
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
JOHN A.
AutoCAD SHX Text
NEWMAN
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text K
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text K
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text T
| Addendum Three |
| ADDENDUM NO 3 (1) |
| ADDENDUM NO 3.pdf |
| MEP |
| PME001 - SYMBOLS, ABBREVIATIONS, AND DETAILS |
| PM101 - PLUMBING AND MECHANICAL FLOOR PLAN |
| PM102 - PLUMBING AND MECHANICAL ELEVATION PLAN |
| PM103 - PLUMBING AND MECHANICAL ELEVATION FLOOR PLAN |
File details come from the government source that posted it. Updated .