Addendum Three.pdf

PDF 21 MB Posted

Attached to
RFB-94-26 24002AMLBAML, Pike County
Solicitation number
RFB-785-2600000152-4
Issued by
Nelson County, Kentucky

About this file

This is an Invitation to Bid (ITB) document for the 24002AMLBAML AML Reclamation Project in Pike County, Kentucky, issued by the Commonwealth of Kentucky's Department for Facilities and Support Services and Division of Abandoned Mine Lands (AML). The project involves reclaiming an area characterized by a small slide, 4 open portals, and seepage, with specific requirements including constructing a 12-foot tall, 75-foot long reinforced concrete wall and a 10-foot tall, 40-foot long reinforced concrete wall. The project will close 4 open portals with wildlife accessible closures, install drainage infrastructure, and revegetate disturbed areas. The bid is scheduled for October 14, 2025, at 9:30 A.M. Eastern Time, with a contract length of 120 calendar days from the contract award date.

The bid includes 36 line items with specific quantities and unit prices, covering activities such as mobilization, utility relocation, site preparation, concrete work, erosion control, revegetation, and portal closure. The total project budget is not explicitly stated, but unit prices are provided for each line item. The project requires compliance with Davis-Bacon wage scales, specific permitting (including KYTC Encroachment, KY DOW Water, and USACE permits), and adherence to erosion and sediment control best management practices. The contractor will be responsible for managing environmental controls, waste materials, and maintaining water quality during the reclamation process. The project area is located along KY 319 in Pike County, with a waste area located approximately 5.4 miles from the project site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-94-26

FOR: 24002 AMLBAML

AML Project Pike County, Kentucky

DATE: October 7, 2025

RFB-785-2600000152

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

Item 2: Official Bid Date has been moved to October 14, 2025, at 9:30 A.M. Eastern Time

Item 3: Bidders must use Revised Bid Schedule in lieu of previously issued.

END OF ADDENDUM

Invitation to Bid No. RFB-94-26 For: 24002 AMLBAML

AML Project Pike County, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL

1 MOBILIZATION L.S. L.S. 1.0 X NA ≤ NA = 30,000.00$

2 UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 25,000.0 X NA ≤ 1.00$ = 25,000.00$

3 LANDSCAPE ALLOWANCE A.C.U. A.C.U. 1,500.0 X NA ≤ 1.00$ = 1,500.00$

4 TRAFFIC CONTROL L.S. L.S. 1.0 X $500.00 ≤ NA = $

5 STRUCTURE REMOVAL/REPLACEMENT A.C.U. A.C.U. 40,000.0 X NA ≤ 1.00$ = 40,000.00$

6 SITE PREPARATION U.P. ACRE 2.5 X $750.00 ≤ $ = $

7 SITE PREPARATION- WASTE AREAS U.P. ACRE 1.5 X $750.00 ≤ $ = $

DOMESTIC, INDUSTRIAL, & MINING DEBRIS

DISPOSAL

L.S. L.S. 1.0 X $0.00 ≤ NA = $

9 60 KSI REINFORCING STEEL U.P. LBS 16,975.0 X $0.75 ≤ $ = $

10 CONCRETE- FORMED & FINISHED U.P. CY 175.0 X $170.00 ≤ $ = $

11 FILTER FABRIC U.P. SY 300.0 X $0.50 ≤ $ = $

12 CLASS II BACKFILL U.P. TON 2,000.0 X $20.00 ≤ $ = $

13 SILT BARRIER - BALES & FENCE U.P. LF 650.0 X $1.00 ≤ $ = $

14 HOE RAM U.P. HOUR 100.0 X $60.00 ≤ $ = $

15 EARTHWORK (PLAN QUANTITY) P.Q. CY 5,000.0 X $1.00 ≤ $ = $

16 EROSION CONTROL BLANKET- ECB U.P. SY 800.0 X $0.75 ≤ $ = $

17 CLASS II / III U.P. TON 550.0 X $20.00 ≤ $ = $

18 SHEET-CHIMNEY DRAIN U.P. SF 1,300.0 X $2.00 ≤ $ = $

19 RETAINING WALL SUBDRAIN U.P. LF 135.0 X $15.00 ≤ $ = $

20 SUBDRAIN U.P. LF 875.0 X $15.00 ≤ $ = $

21 SUBDRAIN CONCRETE COLLARS U.P. EACH 2.0 X $50.00 ≤ $ = $

22 24" DIA. HDPE PIPE- STANDARD U.P. LF 80.0 X $15.00 ≤ $ = $

23 18" DIA. DWPP PIPE U.P. LF 240.0 X $0.00 ≤ $ = $

24 DROP BOX- CONCRETE U.P. EACH 3.0 X $1,250.00 ≤ $ = $

25 PORTAL CLOSURE U.P. EACH 4.0 X $1,000.00 ≤ $ = $

26 SEEDBED PREPARATION U.P. ACRE 1.5 X $75.00 ≤ $ = $

27 AGRICULTURAL LIMESTONE U.P. TON 25.0 X $20.00 ≤ $ = $

28 FERTILIZER U.P. TON 0.5 X $600.00 ≤ $ = $

29 SEED U.P. LBS 120.0 X $4.00 ≤ $ = $

30 MULCH- STRAW & HAY U.P. ACRE 1.5 X $100.00 ≤ $ = $

31 COVER CROP U.P. BUSHEL 10.0 X $10.00 ≤ $ = $

32 RESIDENTIAL SEEDING U.P. ACRE 2.5 X $500.00 ≤ $ = $

24002AMLBAML AML RECLAMATION PROJECT

PIKE COUNTY, KENTUCKY

BID SCHEDULE

REVISED BID SCHEDULE 10-7-2025

RFB-94-26

33 DENSE GRADE AGGREGATE U.P. TON 200.0 X $20.00 ≤ $ = $

34 ROADWAY STONE U.P. TON 400.0 X $20.00 ≤ $ = $

35 FLOWABLE FILL U.P. CY 50.0 X $35.00 ≤ $ = $

36 CHAIN-LINK FENCE U.P. LF 195.0 X $15.00 ≤ $ = $

BID TOTAL = $

NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL BID

AMOUNT TO BE VALID.

* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.

REVISED BID SCHEDULE 10-7-2025

RFB-94-26

Revised 12/11/2024

COR & BID & BMP 1

24002AMLBAML (AML) RECLAMATION PROJECT

PIKE COUNTY, KENTUCKY

Written Location Directions: LATITUDE: 37.5836° N, LONGITUDE: 82.1936° W. The project site is located along KY 319. From the intersection of US 23 and US 119 in Pikeville, turn east on US 119 and travel 22.5 miles to the intersection with KY 319. Turn right on KY 319 and travel 6.0 miles to the project area. The project site is located on the left side of KY 319.

Waste Area Directions: LATITUDE: 37.5603° N, LONGITDE: 82.2324° W. From the project area, travel southeast on KY 319 for 0.9 mile to KY 1056. Turn right on KY 1056 and travel 5.4 miles to the waste area. Turn left on an existing gravel road and the waste area is on the immediate left.

Basic Project Description: The project site is characterized by a small slide, 4 open portals, and seepage from the portals and slide. The slide damaged an existing storage building on the property, which was subsequently replaced following clean-up of the slide by the property owner.

However, there remains a significant amount of seepage from the open portals and throughout the material on the upper bench and below at the elevation of the property owner’s residence.

A 12 foot tall, 75 foot long reinforced concrete wall (AML Standard 30-60-1) will be constructed immediately behind the existing storage building (northwestern side of the project area). From the corner of that wall, a 10 foot tall, 40 foot long reinforced concrete wall will be constructed (northeastern side of the project area). Backfill will be placed behind the walls on a 2:1 slope unless deviation is approved by the Engineer. Subdrains will be placed both in front of and behind the walls. The 4 open portals will be closed with wildlife accessible closures (AML Standard 40-20-1), and a combination rock ditch-drain

(AML Standard 22-30-4) will be placed on both the upper and lower benches to divert water to an existing roadway ditch along KY 319.

It is anticipated that trees in excess of 3 inches diameter at breast height will require removal within the project area. All trees removed as part of the project must be relocated to the waste area for burning unless a suitable area is identified and approved at the project site.

Residential seeding is included to revegetate disturbed areas on the property. Other revegetation bid items are included to revegetate the waste area.

Access to the project site and waste area is via state roads and residential driveways. Repairs to the driveways are included in the bid items.

Construction disturbances will be kept to a minimum with a stringently formulated sediment and erosion control program. Prior to beginning any major earth disturbance, all silt control measures will be installed. This includes silt barriers (bales & silt fence) at the project site and the waste area.

A. STANDARD DOCUMENTS

The AML Standard Details and Technical Specifications are posted on the Division’s website at https://eec.ky.gov/aml

Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.

https://eec.ky.gov/aml

COR & BID & BMP 2

B. ALLOWABLE PRICE LIMIT

The lowest Allowable Price Limit (APL) is listed on the Bid Schedule as part of the bid documents. Unit

Price, Plan Quantity, and Lump Sum are all methods of payment. Significantly low or high values entered by the CONTRACTOR on the Bid Schedule may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.

An example would be if a CONTRACTOR assumes there may not be a need for the entire design quantity for Roadway Stone and entered a $10 value for Roadway Stone when the cost at the quarry is significantly higher. Another example would be if the CONTRACTOR enters a value of $30 per linear foot for “SILT BARRIER - BALES & FENCE” to front load payments for work items used near the beginning of the project. The CONTRACTOR is also cautioned that other considerations for rejection may be enforced such as the low bid being higher than the budgeted dollar amount for this project.

C. CONTRACT LENGTH

All work shall be completed within one hundred twenty (120) calendar days from the effective date of the

Award of Contract. Within the bounds of prudent project performance, it shall be the responsibility of the

CONTRACTOR to plan and implement construction sequences which follow the intent of these

CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special Conditions and to protect any portion of the contract which may be completed before others.

D. CONTRACTOR’S INFORMATION SHEET

The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/Subcontractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive.”

E. SPECIAL CONDITIONS & PROJECT NOTES

- When applicable, AML is responsible for payment to the Imperiled Bat Conservation Fund

(ICBF). The CONTRACTOR will be responsible for adhering to the boundary for which payment was made and confirming with AML the acreage of trees removed.

- On occasion, a property owner may require a CONTRACTOR to add them on their General

Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the

CONTRACTOR when this requirement is being made by the property owner. In these cases, the

CONTRACTOR must submit to AML copies of their certificate of insurance documenting the

“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.

F. DAVIS BACON SCALE WAGES

The CONTRACTOR and all SUBCONTRACTORS are required to pay scale wages as defined in the contract documents. If all employment categories that may be used have not been listed and specified in

COR & BID & BMP 3

the contract document, then the contractor must make his best determination of what the missing wage rate will be. Subsequently after the bid is awarded, the contractor must request the specific rate from the

Department of Labor. AML will not issue change orders for additional compensation if the wage rate determined by DOL is higher than the rate the contractor used to develop his bid. If wage rates are not included for a specific category, AML suggests that the contractor assume the highest operator or laborer wages that are listed when developing his bid.

G. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.

(Check all that apply)

☒KYTC Encroachment Permit

☒KY DOW Water Permits

☒USACE Permit

The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project. The

CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the CONTRACTOR. Please refer to

“General Provisions” in the AML Technical Specifications.

8/21/2023

COR & BID & BMP 4

BID ITEM DESCRIPTION

24002AMLBAML AML RECLAMATION PROJECT

PIKE COUNTY, KENTUCKY

NO ITEM DESCRIPTION

1 MOBILIZATION This item consists of the mobilization and demobilization of the CONTRACTOR’S forces and equipment in accordance with the “Mobilization/Demobilization” AML

Standard Technical Specification. The amount of this bid item is AS STATED ON

THE BID SCHEDULE.

Measurement: Not Applicable.

Payment: Payment shall be made at increments set in the AML Technical

Specifications totaling the Lump Sum price.

2 UTILITY

RELOCATION /

REPLACEMENT

This consists of furnishing all materials, equipment, and labor necessary to replace utilities damaged by construction or relocate any utilities that are in the construction area in accordance with the “Utility Relocation” AML Standard Technical

Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.

Special Considerations: None

Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.

Measurement: Not Applicable.

Payment: Payment shall be made for Actual Documented Costs for “UTILITY

RELOCATION/REPLACEMENT” approved by the ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General Provisions” AML Standard Technical Specification.

Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.

COR & BID & BMP 5

3 LANDSCAPE

ALLOWANCE

This item of work shall consist of furnishing all materials, equipment, and labor necessary to replace damaged landscape structures, plants and trees as depicted on

Drawings and as directed by ENGINEER in accordance with the “Revegetation” AML

Standard Technical Specification. The CONTRACTOR is required to supply the

ENGINEER with all documentation to support cost incurred to qualify for reimbursement.

Special Considerations: None

Inspector Notes: Conduct a picture inventory of landscape items that may be affected before construction starts and keep an item list of those landscape items that are affected.

Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.

Measurement: Not Applicable

Payment: Payment for Actual Documented Costs “LANDSCAPE ALLOWANCE” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for the removal/replacement of landscape features as approved/directed by the ENGINEER in accordance with the “General Provisions” AML Standard

Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.

4 TRAFFIC CONTROL This item consists of maintaining and controlling traffic on existing roads (public and private) affected by this project as depicted on the Drawings and as directed by the

ENGINEER in accordance with the “Traffic Control” AML Standard Technical

Specification. Appropriate signs shall be erected at the project limits and flag persons shall be used as needed.

Special Considerations: None

Major Incidentals: Signs, flaggers, steel plates, immediately clearing debris from roadway.

Measurement: Not Applicable.

Payment: Payment shall be made at the Lump Sum price bid for “TRAFFIC

CONTROL” in accordance with the “General Provisions” AML Standard Technical

Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.

COR & BID & BMP 6

5 STRUCTURE

REMOVAL/

REPLACEMENT

This item represents the ENGINEER'S best estimate of removal/replacement cost of designated qualifying structural features “in kind” to facilitate normal construction activities as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Structure Removal / Replacement” AML Standard Technical

Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.

Special Considerations: None

Inspector Notes: Inventory of structures, pictures, and dimensions, before construction starts. Any structures that are removed shall be accompanied by pictures.

Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.

Measurement: None

Payment: Payment shall be made for Actual Documented Costs for “STRUCTURE

REMOVAL/REPLACEMENT” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the

CONTRACTOR in accordance with the “General Provisions” AML Standard

Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.

6 SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the

“Site Preparation” AML Standard Technical Specification.

Special Considerations: None

Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.

Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “SITE PREPARATION” in accordance with the “General

Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.

COR & BID & BMP 7

7 SITE PREPARATION-

WASTE AREAS

This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the

“Site Preparation” AML Standard Technical Specification.

Special Considerations: None

Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, access improvement/construction, in-kind fence repair/replacement.

Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “SITE PREPARATION- WASTE AREAS” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.

8 DOMESTIC,

INDUSTRIAL, &

MINING DEBRIS

DISPOSAL

This item of work shall consist of furnishing all material, equipment, and labor necessary to remove industrial and mining debris within the project limits as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Industrial

Mining Debris Removal” and “Site Preparation” AML Standard Technical

Specifications.

Special Considerations: None

Inspector Notes: Take pictures of debris removed.

Measurement: None

Payment: Payment shall be made at the Lump Sum price bid for “DOMESTIC, INDUSTRIAL, & MINING DEBRIS DISPOSAL” in accordance with the “General

Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, haulage, disposal fees, and incidentals necessary to complete this item of work.

COR & BID & BMP 8

9 60-KSI REINFORCING

STEEL

This item consists of furnishing all materials, equipment, and labor necessary to properly installing 60 KSI reinforcing steel of various diameters and lengths as depicted on the Drawings and as directed by the ENGINEER in accordance with the

“Concrete” and “Steel” AML Standard Technical Specifications.

This bid item covers steel used for: reinforcement in concrete ditches (all types), footers, retaining walls, concrete piles & cap reinforcement, anchors, Special Considerations: See AML Technical Specification for overlap Steel Item

2.2.6.

No splicing shall be permitted for length of steel less than 10 feet in length.

Splicing of lengths between 10 feet and 20 feet is allowed. No lengths less than 4 feet is allowed including the overlap.

For lengths greater than 20 feet splicing is allowed. Minimum length of steel shall be

10 foot including overlap.

Maximum of 10 % payment for overlap steel.

Major Incidentals: Coatings, excess steel, connections, cut-offs, testing, and waste materials

Measurement: Actual Quantities shall be measured as pounds of reinforcing steel placed and accepted by the ENGINEER. Actual Quantities may be obtained by using a

CRSI chart that shows lbs/lf for each size bar and multiplying the length of each bar used.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “60-KSI REINFORCING STEEL” in accordance with the

“General Provisions” AML Standard Technical Specification. Such payment as specified shall constitute full compensation for all labor, materials, equipment, and incidentals.

10 CONCRETE- FORMED

& FINISHED

This item consists of furnishing all materials, equipment, and labor necessary to construct concrete field cast items as depicted on the Drawings and as directed by the

ENGINEER in accordance with the “Concrete” AML Standard Technical

Specification. This bid item covers concrete used for: concrete ditches (all types), retaining walls (all types), footers, caps, and any other purpose that requires formwork and/or finishing. All formwork, no matter the size/scale or changes are incidental, including increases in heights of walls.

Special Considerations: None

Inspector Notes: Collect manufacturer certificates for each unit.

Major Incidentals: Formwork (including height/width increases), admixtures, finishing, materials testing.

Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price for “CONCRETE- FORMED & FINISHED” in accordance with the

“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.

COR & BID & BMP 9

11 FILTER FABRIC This item consist of furnishing all materials, equipment, and labor, necessary to install filter fabric utilized in ditch construction as depicted on the Drawings and as directed by the ENGINEER in accordance with “Filter Fabric” AML Standard Technical

Specification. This includes all types of filter fabric used on a jobsite. The standard details list the type and quantity of fabric for each purpose.

Special Considerations: None

Inspector Notes: Collect manufacturer certificates for each unit.

Major Incidentals: Staples

Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “FILTER FABRIC” in accordance with the “General Provisions”

AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.

12 CLASS II BACKFILL This item consists of furnishing all materials, equipment, and labor necessary to place

Class II aggregate as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining” AML Standard

Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of aggregate installed and accepted by the

ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “CLASS II BACKFILL" in accordance with the “General

Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.

13 SILT BARRIER–

BALES & FENCE

This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML Standard

Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.

Special Considerations: None

Major Incidentals: Maintenance, silt fence trenching and removal

Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the constitute full compensation for materials, equipment, labor, and incidentals.

COR & BID & BMP 10

14 HOE RAM This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of rock utilizing a hoe ram as depicted on the

Drawings and as directed by the ENGINEER in accordance with the “Equipment”

AML Standard Technical Specification.

Special Considerations: None

Major Incidentals: Equipment, operator, fuel, maintenance items

Measurement: Actual Quantities shall be measured as the next whole equipment hour when required to construct ditches and other features approved by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “HOE RAM” in accordance with the “General Provisions” AML

Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor and incidentals.

15 EARTHWORK This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork”

AML Standard Technical Specification.

Special Considerations: None

Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.

Measurement: No measurements will be made unless the ENGINEER significantly revises the dimensions of the work area(s).

Payment: Payment shall be the product of the Plan Quantity Volume and the Unit

Price bid for “EARTHWORK” in accordance with the “General Provisions” AML

Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and gradework efforts associated with designated waste areas.

16 EROSION CONTROL

BLANKET-ECB

(BENCHES, DITCHES,

& SLOPES)

This item consist of furnishing all materials, equipment, and labor necessary to install all types of erosion control blanket (ECB) as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Erosion Control

Blanket” AML Standard Technical Specification. Subgrade preparation shall be incidental. Placement of ECB for slope protection will also be covered by this bid item.

Special Considerations: None

Major Incidentals: Excavation, subgrade preparation

Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “EROSION CONTROL BLANKET-ECB” in accordance with the

“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.

COR & BID & BMP 11

17 CLASS II / III –

(DITCHES, ANCHORS,

DRAINS, &

BUTTRESSES)

This item consist of furnishing all materials, equipment, and labor necessary to install

Class II and Class III rock as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with “Crushed Aggregate and Channel

Lining” and “Ditches” AML Standard Technical Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current

Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.

Special Considerations: None

Inspector Notes: Collect supplier tickets.

Major Incidentals: Excavation, subgrade preparation

Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report % CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton. Material exceeding the 85% minimum is not adjusted.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “CLASS II/III” in accordance with the “General Provisions” AML all labor, materials, equipment, and incidentals.

18 SHEET – CHIMNEY

DRAIN

This item consist of furnishing all materials, equipment, and labor necessary to install sheet drains as depicted on the Drawings and as directed by the ENGINEER in accordance with “Sheet – Chimney Drains” AML Standard Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “SHEET – CHIMNEY DRAIN” in accordance with the “General full compensation full compensation for all labor, materials, equipment, and incidentals

19 RETAINING WALL

SUBDRAIN

This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface Drains” AML Standard

Technical Specifications.

Special Considerations: None

Major Incidentals: Pipe, filter fabric, aggregate backfill

Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “RETAINING WALL SUBDRAIN” in accordance with the constitute full compensation for all labor, equipment, materials, and incidentals.

COR & BID & BMP 12

20 SUBDRAIN This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface Drains” AML Standard

Technical Specifications.

Special Considerations: None

Major Incidentals: Excavation to depth of 3’, pipe, filter fabric, aggregate backfill to depth of 3’.

Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER. Subdrains requiring more than the incidental quantity of rock will be paid from the No. 2 Stone bid item or Roadway

Stone if a No. 2 Stone bid item is not listed. All excavation is incidental to the earthwork.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “SUBDRAIN” in accordance with the “General Provisions” AML all labor, equipment, materials, and incidentals.

21 SUBDRAIN

CONCRETE COLLARS

This item of work shall consist of furnishing all labor, materials, and equipment necessary to construct subdrain concrete collars as depicted on the Drawings, AML

Standard Details, and as directed by the ENGINEER in accordance with the

“Concrete” and “Subsurface Drains” AML Standard Technical Specifications.

Special Considerations: None

Major Incidentals: Concrete, forming, steel

Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “SUBDRAIN CONCRETE COLLARS” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.

HDPE PIPE-

STANDARD – 24 INCH

DIAMETER

This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout Products”, and “Pipe” AML Standard Technical

Specifications.

Special Considerations: None

Inspector Notes: Collect manufacturer certificates for each unit.

Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.

Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the “General full compensation for all labor, equipment, materials, and incidentals.

COR & BID & BMP 13

DWPP PIPE – 18 INCH This item consists of furnishing all materials, equipment, and labor, necessary to install the dual wall polypropylene pipe as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and

Channel Lining”, “Grout Products”, and “Pipe” AML Standard Technical

Specifications.

Special Considerations: None

Inspector Notes: Collect manufacturer certificates for each unit.

Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.

Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “DWPP PIPE” in accordance with the “General Provisions” AML all labor, equipment, materials, and incidentals.

24 DROP BOX-

CONCRETE

This item consists of furnishing all materials, equipment, and labor, necessary to construct concrete drop boxes as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Drop /

Junction Boxes” AML Standard Technical Specifications up to a depth of 8’.

Special Considerations: None

Major Incidentals: Concrete, steel reinforcement, grout, formwork, aggregate backfill

Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “DROP BOX-CONCRETE” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, 25 PORTAL CLOSURE This item consists of furnishing all materials, equipment, and labor necessary to close mine portals as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Portal Closure” AML Standard Technical

Specification.

Special Considerations: None

Major Incidentals: Earthwork, excavation, cement, block, pipe, steel, concrete

Measurement: Actual Quantities shall be measured as “EACH” closure completed and accepted by ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “PORTAL CLOSURE” in accordance with the “General

Provisions” AML Standard Technical Specification. Such payments shall constitute

COR & BID & BMP 14

26 SEEDBED

PREPARATION

This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML Standard Technical

Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.

Payment: Payment for revegetation shall the product of the Actual Accepted

Quantities and the respective Unit Price bid for "SEEDBED PREPARATION” in accordance with the “General Provisions” AML Standard Technical Specification.

Such payment shall constitute full compensation for all materials, labor, equipment, 27 AGRICULTURAL

LIMESTONE

These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML Standard

Technical Specification. DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine a Relative Neutralizing

Value (RNV) for weight adjustment.

Special Considerations: None

Inspector Notes: Collect supplier tickets.

Major Incidentals: Application and incorporation

Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.)

aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.

Payment: Payment for revegetation shall the product of the Actual Accepted

Quantities and the respective Unit Price bid for "AGRICULTURAL LIMESTONE” in accordance with the “General Provisions” AML Standard Technical Specification.

28 FERTILIZER

directed by the ENGINEER in accordance with the “Revegetation” AML Standard

Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.

Payment: Payment for revegetation shall the product of the Actual Accepted

Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with constitute full compensation for all materials, labor, equipment, and incidentals.

COR & BID & BMP 15

29 SEED

directed by the ENGINEER in accordance with the “Revegetation” AML Standard

Technical Specification. Seed mixture will be listed on the Drawings, Project

Description, and/or Special Conditions.

Special Considerations: None

Inspector Notes: Collect manufacturer certificates for each unit.

Major Incidentals:

Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.

Payment: Payment for revegetation shall be the product of the Actual Accepted

Quantities and the respective Unit Price bid for "SEED” in accordance with the

30 MULCH- STRAW &

HAY

directed by the ENGINEER in accordance with the “Revegetation” AML Standard

Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.

Payment: Payment for revegetation shall be the product of the Actual Accepted

Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical Specification.

31 COVER CROP

directed by the ENGINEER in accordance with the “Revegetation” AML Standard

Technical Specification. Cover crop will be winter wheat in the fall and winter and

German Foxtail Millet in the spring and summer months.

Special Considerations: None

Measurement: Actual Quantities shall be measured to the next whole bushel approved by and accepted by the ENGINEER.

Payment: Payment for revegetation shall the product of the Actual Accepted

Quantities and the respective Unit Price bid for “COVER CROP” in accordance with

COR & BID & BMP 16

32 RESIDENTIAL

SEEDING

This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML Standard Technical

Specification.

Special Considerations: None

Major Incidentals: Seedbed preparation, agriculture limestone, fertilizer, seed, and mulch

Measurement: Actual Quantities shall be measurement as the next tenth of an acre seeded as approved by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “RESIDENTIAL SEEDING” in accordance with the “General full compensation for all labor, materials, equipment, and incidentals.

33 DENSE GRADE

AGGREGATE

This item shall consist of furnishing all materials, equipment, and labor necessary to place, and compact dense grade aggregate (DGA) as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed Aggregate and Channel

Lining” AML Standard Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of aggregate installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and Unit

Price bid for "DENSE GRADE AGGREGATE FOR ROADWAYS” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.

34 ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Crushed Aggregate and

Channel Lining” AML Standard Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and the

Unit Price bid for “ROADWAY STONE” in accordance with the “General

COR & BID & BMP 17

35 FLOWABLE FILL This item shall consist of furnishing all materials, equipment, and labor for the purpose of backfilling culverts across roadways and at headwalls as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Grout Products” AML

Standard Technical Specification.

Special Considerations: None

Major Incidentals: Steel plates for traffic.

Measurement: Actual quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.

Payment: Payment shall be the product of the Actual Accepted Quantities and Unit

Price bid for “FLOWABLE FILL” in accordance with the “General Provisions”

36 CHAIN LINK FENCE This item shall consist of furnishing all materials, equipment, and labor necessary to construct a chain-link safety fence as depicted on the Drawings, AML Standard

Details, and as directed by the ENGINEER in accordance with the “Fence” AML

Standard Technical Specification.

Special Considerations: None

Measurement: Actual Quantities shall be measured to the next whole linear feet of fence installed and accepted by the ENGINEER.

Payment: Payment shall be the product of Actual Accepted Quantities and the Unit

Price bid for “CHAIN LINK FENCE” in accordance with the “General Provisions”

COR & BID & BMP 18

Erosion and Sediment Control

Best Management Practices (BMP) Plan

January 2017

COR & BID & BMP 19

OVERVIEW

This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned Mine Lands

(DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML) Reclamation and Acid Mine Drainage

(AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical

Specifications and Standard Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.

This general BMP document is to outline the various pollution prevention measures used on AML

Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.

EROSION PREVENTION AND SEDIMENT CONTROL MEASURES

Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas (DDAs) and related information. The construction notes and project description may describe other control measures. The

Contractor and Engineer may select an additional BMP for the project as the project changes and construction progresses. Projects that do not have DDAs annotated in the plans will employ the same concepts selecting and implementing this general BMP plan.

Address disturbed areas or sources of sediments by the most effective means in the specific work area.

Direct non-storm water discharges to sediment basins/traps or to a filter fence enclosure in a flat vegetated infiltration area or filtered via another approved commercial product. All deep mine and surface impoundment water will be tested and treated, when as necessary, to meet the DAML Water-Treatment and Disposal Technical Specification unless stricter limitations are listed in an existing Total Daily

Maximum Load (TMDL) limit.

PERMITS

The DAML shall review each project during project development to determine whether any permits are required to implement the project work. When a permit is required, DAML will make every effort to obtain the permit prior to letting the project for bidding. Permit specific conditions shall trump any standard conditions and/or practices. All permits must be maintained onsite and produced when requested by regulatory authorizes inducing representative of the permitting authority.

Common permits types for DAML projects:

• 401 Water Quality Certification (WQC) o Issued by the KY Division of Water

• 402 KY Pollution Discharge Elimination System (KPDES) o DAML activities are covered under the AML KPDES General Permit

• 404 US Army Corps of Engineers (USACE) o Issued by the US Army Corps of Engineers- Nashville District, Louisville District, or

Huntington District (Depending upon major drainage basin)

COR & BID & BMP 20

• KY Stream Construction (Floodplain) o Issued by the KY Division of Water

• Local Floodplain Permit o Issued by the County/Municipality

• Local Storm Water Construction o Issued by the County/Municipality

A) Field Review Walk-Thru:

The DAML will conduct a project review between the Project Engineer, Construction Branch Personnel, Project Design Technician, and Field Office Staff, to review the construction plans and identify any changes needed prior to letting the project for bidding. The group will evaluate the locations and types of site specific BMP and any other erosion prevention and sediment control measures chosen for incorporation into the final design plans.

B) Site Visit Meeting

DAML will present the project specific BMP and permit requirements/conditions to the potential contractors during the site visit meeting.

C) Pre-Construction Conference

Prior to the actual beginning of the project, DAML will hold a pre-construction conference between representatives of the DAML, the Contractor, including any Subcontractors, as well as other interested agencies and parties. Items discussed will include the time and sequence for construction, planned methods of operation, payment, and other relevant questions including any permit requirements and the erosion and sediment control plan.

D) Construction Access

This is the first land-disturbing activity. Construction entrances shall be a minimum of twenty (20) feet wide by fifty (50) feet long, measured from the shoulder of the public road, and consist of No. 2 aggregate over a heavy weight non-woven filter fabric base. As soon as construction begins, stabilize bare areas with gravel and temporary mulch and/or vegetation.

E) Clearing and Grubbing

Use the following techniques for clearing and grubbing activities:

1) Leave areas undisturbed when possible.

2) Construct silt basins to provide silt volume for large areas.

3) Construct Silt Trap(s) Type A for small areas.

4) Construct Type B silt traps for areas with rapid runoff and sediment-laden runoff.

5) All silt traps should have a 3:1 flow length to width ratio. Add spreader bars, baffles, or turbidity curtains to maintain the flow path ratio when site conditions require traps sizes smaller than the standard detail dimensions.

6) Install geotextile bags and/or rock checks in front of existing drop inlets.

7) Construct diversion ditches to catch sheet runoff and carry it to basins or traps or to divert it around areas to be disturbed.

8) Maintain brush and/or other barriers to slow and/or divert runoff.

COR & BID & BMP 21

9) Construct silt fences/hay bales to catch sheet runoff on short slopes. For longer slopes, multiple rows of silt fence/hay bales may be considered.

10) Apply temporarily mulch to area not actively being disturbed or for any area left undisturbed for fourteen (14) days.

11) Employ non-standard or innovative methods.

F) Stream Crossings / Work Along Streams

1) Temporary low-water stream crossings follow the guidelines included in the DAML Technical

Specifications and those established by the KY Division of Water Floodplain Management

Section. Removal of a temporary crossing may be required to accommodate large storm events.

2) Do not completely block stream flow (even temporary). Instead, utilize some form of pass thru mechanism during all AML projects.

3) Work within a stream channel shall not cause flooding of properties upstream, downstream or within the project area or cause downstream water quality degradation. Minimize equipment contact time with the stream water by diverting water around equipment working in or along streams.

4) No flowing water will interact with any uncured concrete placed in the stream channel.

5) Divert all stream water around the work…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .