This addendum to an Invitation to Bid (RFB-33-25) is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in conjunction with the Department for Natural Resources, Division of Abandoned Mine Lands (DAML), for the 23119 AMLBAL AML Project in Clay County, Kentucky. The project involves extinguishing and remediating a burning refuse fire affecting approximately one acre, with total construction limits of 1.5 acres including a borrow area. Work includes site preparation, silt control, earthwork for burning refuse extinguishment, erosion control blanket installation, crushed aggregate placement, and revegetation activities including seedbed preparation, agricultural limestone application, fertilizer, seed, and mulch application. The official bid date was moved to August 14, 2024, at 9:30 a.m. Eastern Time, and all work must be completed within forty-five (45) calendar days from the contract award date. Contractors are required to submit a revised bid schedule and an AML Contractor/Subcontractor Information Form with their bids.
Addendum One revised multiple bid items and documents, including increases to roadway stone quantities, addition of Erosion Control Blanket (ECB) and Class II/III aggregate bid items, and clarification that a minimum of two feet of cover material must be placed over cooled refuse prior to revegetation. The bid schedule lists 14 items with lump sum and unit pricing, with an Allowable Price Limit (APL) for each item to prevent unbalanced bids. Key materials required include a minimum 4-inch pump capable of producing 400 gallons per minute for water application, with soil temperatures requiring reduction to 100 degrees Fahrenheit or less. DAML will be responsible for obtaining KYTC Encroachment Permits, Kentucky Department of Water permits, and U.S. Army Corps of Engineers permits, while contractors are responsible for all other necessary permits and fees. All contractors and subcontractors must comply with Davis-Bacon prevailing wage requirements, and AML will monitor soil temperatures and air quality for hydrogen sulfide, carbon monoxide, oxygen, and methane during extinguishment activities, with operators and laborers required to wear self-contained breathing apparatus when exposed to smoke or noxious fumes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2500000022_2_SO_FORM.PDF | ||
| Final_RFB_785_2500000022_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-33-25
FOR: 23119 AMLBAL
AML Project Clay County, Kentucky
DATE: August 6, 2024
RFB-785-2500000022
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Official Bid Date has been moved to August 14, 2024 @ 9:30 A.M. Eastern Time
Item 3: Bidders must use Revised Bid Schedule in lieu of previously issued.
END OF ADDENDUM
Invitation to Bid No. RFB-33-25 For: 23119 AMLBAL
AML Project Clay County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
23119AMLBAML
Addendum Outline Notes
Addendum Revisions Outline
• Bid item No. 4, EARTHWORK-BURNING REFUSE (LUMP SUM). Verbiage was amended within the COR document and Project description to state that “A minimum of two foot of cover material shall be placed over top of cooled refuse prior to revegetation efforts.”
• Bid item No. 5, EROSION CONTROL BLANKET- ECB, was added to the contract. It will be used on the outer slope, where needed, to minimize erosion.
• Bid item No. 6, CLASS II / III, was added to the contract. It will be used in wet areas to gain access to the work area, as well as armoring any eroded ditches.
• Bid item No. 13, ROADWAY STONE, increased to ensure the access road has ample coverage to minimize tracking along the county road.
These revisions are now reflected in the newly revised following documents:
1. PLANSET
2. COR BID
3. Project Description
4. IIJA-BIL
5. Engineers Estimate
6. Bid Schedule
7. BABAA
SLM 7-29-24
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1.0 X NA NA = 12,500.00$
2 SITE PREPARATION U.P. ACRE 1.5 X $750.00 $ = $
3 SILT BARRIER - BALES & FENCE U.P. LF 400.0 X $1.00 $ = $
4 EARTHWORK-BURNING REFUSE (LUMP SUM) L.S. L.S. 1.0 X $15,000.00 NA = $
5 EROSION CONTROL BLANKET- ECB U.P. SY 500.0 X $0.75 $ = $
6 CLASS II / III U.P. TON 150.0 X $20.00 $ = $
7 SEEDBED PREPARATION U.P. ACRE 1.5 X $75.00 $ = $
8 AGRICULTURAL LIMESTONE U.P. TON 25.0 X $20.00 $ = $
9 FERTILIZER U.P. TON 1.0 X $600.00 $ = $
10 SEED U.P. LBS 120.0 X $3.00 $ = $
11 MULCH- STRAW & HAY U.P. ACRE 1.5 X $100.00 $ = $
12 COVER CROP U.P. BUSHEL 5.0 X $10.00 $ = $
13 ROADWAY STONE U.P. TON 200.0 X $20.00 $ = $
14 WATER PUMP U.P. HOUR 200.0 X $20.00 $ = $
BID TOTAL = $
23119AMLBAML
CLAY COUNTY, KENTUCKY
BID SCHEDULE
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL
BID AMOUNT TO BE VALID.
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
REVISED BID SCHEDULE 8/6/2024 RFB-33-25
CLAY COUNTY, KY
PROJECT DESCRIPTION:
The project consists of two areas totaling approximately 1 acre in size, which are composed of coarse and fine refuse mixed with soil. Recently, the refuse ignited causing the surrounding area to burn. U.S. Forestry Services was dispatched and extinguished the surrounding fire, but the refuse is still smoldering and causing issues for the community of Manchester.
The project is located in Clay County, within the Manchester Quad and PU #244. Directions to the site are as follows: From KY-80 E/Hal Roger’s Pkwy, take the KY-80 ramp to US-
421/Manchester. Turn left onto KY-80 E/US-421 and continue for 1.1 miles. Turn right onto
2nd Street and travel 0.5 miles to Pioneer Village on right. Once at the gated entrance located at coordinates: 37.145917”, -83.760119", travel another 0.5 miles to the smoldering refuse area.
Mr. Clifford Sams operates the house coal load out just below the project area. He can be reached at (606) 813-0198 on his cell if there are any issues.
In total, the construction limits will consist of approximately one and a half (1.5) acres. One (1) acre within the burning refuse piles, and one half (0.5) acre within the borrow area. All seeding will utilize the AML General Reclamation Mixture found in the Standard Specifications on page
A-6. Revegetation activities shall be completed within the recommended seeding window found on page A-5. Any seeding activities outside of this window must be approved by the Branch
Manager.
Mobilization is setup to provide for construction equipment to be delivered to the site.
Site preparation will be utilized on one and a half (1.5) acres, which will include removing trees along the access road, removing trees within the burning refuse areas and removing the thick vegetation within the borrow area. Trees and thick vegetation will be windrowed off to the side of the bench and borrow area in locations that are not currently smoldering.
Silt bales & fence shall be installed below all disturbed areas or at the direction of the onsite
Engineer.
Earthwork (Lump Sum) shall include all soil disturbance. The awarded contractor should start from the bottom of the smoldering area and begin by turning the soil while cooling it with water and incorporating additional soil from the borrow area nearby to achieve the ideal temperature.
In order for AML to approve the contractor to be complete, no soil should be hotter than 100° F.
The onsite Scientist will monitor soil temperatures throughout the project to ensure compliance.
A minimum of two foot of cover material shall be placed over top of cooled refuse prior to revegetation efforts. If the contractor has displayed great effort in extinguishing the burning refuse but the contract time frame is set to expire, a formal request to the Branch Manager can be made to ask for additional days to complete the work. If the contractor believes they will exceed
1 acre of surface disturbance to properly extinguish the fire, a formal request to the Branch
Manager must be made. An existing swale ditch within the borrow area may need to be reestablished after borrow material is utilized. The borrow area will be graded to create positive drainage towards the swale ditch.
Roadway stone will be applied to the permit entrance during and upon completion to reduce mud from being tracked onto Railroad Avenue.
A water pump will be used to pump water to cool the smoldering refuse down to 100° F or less.
Minimum requirement is 4” pump able to produce a flow rate of 400 gallons per minute.
AML will test the air for hydrogen sulfide directly, along with CO, O2 & CH4 while extinguishment efforts are taking place. We will base limits & guidance on OHSA guidelines as discussed in the link below. This is included in our COR document that’s a part of the contract.
Operators and labors shall be equipped with a self-contained breathing apparatus or oxygen tanks when exposed to direct contact with smoke or noxious fumes. See the Burning Refuse
Specification for more detail. AML will have the onsite Scientist monitor activities while sensitive extinguishment work is being conducted. Safety is our highest priority.
https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.55
No work will be performed in the flood plain or in a stream. Therefore, no permits are needed.
https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.55
Revised 5/10/2023
COR & BID & BMP 1
CLAY COUNTY, KENTUCKY
Written Location Directions:
Take the KY-80 ramp to US-421/Manchester and turn left onto KY-80 E (signs for US-
421/Manchester/EKU Campus). Travel 1.4 miles on US-421 N. Turn right onto bridge on 2nd St. At the end of the bridge, turn right onto Railroad Avenue and travel 0.5 miles to the Salt Works Festival Pioneer
Village. Permit access road is located at the gravel parking area for Pioneer Village at coordinates:
37.145917°, -83.760119°. Once through the permit gate, the area of concern is another 0.5 miles.
Basic Project Description:
The project consists of two areas totaling approximately 1 acre in size, which are composed of coarse and fine refuse mixed with soil. Recently, the refuse ignited causing the surrounding area to burn. U.S.
Forestry Services was dispatched and extinguished the surrounding fire, but the refuse is still smoldering and causing issues for the community of Manchester.
A. STANDARD DOCUMENTS
The AML Standard Details, Technical Specifications, and Bid Item Descriptions are posted on the
Division’s website at https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-
Lands/Pages/default.aspx
Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.
B. ALLOWABLE PRICE LIMIT
Allowable Price Limit (APL) is part of the contract documents and is stated on the Bid Schedule. The
Unit Price (UP) / Lump Sum Price (LS) has a low value defined for each item on the Bid Schedule. Any
Unit Price / Lump Sum Price outside this value may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid. The CONTRACTOR is also cautioned that other considerations for rejection, notwithstanding the APL, may be enforced (e.g.
total bid price being excessively over the ENGINEER’S ESTIMATE).
C. CONTRACT LENGTH
All work shall be completed within forty-five (45) calendar days from the effective date of the Award of
Contract. Within the bounds of prudent project performance, it shall be the responsibility of the
CONTRACTOR to plan and implement construction sequences which follow the intent of these
CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special Conditions and to protect any portion of the contract which may be completed before others.
D. CONTRACTOR’S INFORMATION SHEET
The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/SubContractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive” https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-Lands/Pages/default.aspx https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-Lands/Pages/default.aspx
COR & BID & BMP 2
E. SPECIAL CONDITIONS & PROJECT NOTES
- On occasion, a property owner may require a CONTRACTOR to add them on their General
Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the
CONTRACTOR when this requirement is being made by the property owner. In these cases, the
CONTRACTOR must submit to AML copies of their certificate of insurance documenting the
“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.
F. DAVIS BACON SCALE WAGES
The CONTRACTOR and all SUBCONTRACTORS are required to pay scale wages as defined in the contract documents. If all employment categories that may be used have not been listed and specified in the contract document, then the contractor must make his best determination of what the missing wage rate will be. Subsequently after the bid is awarded, the contractor must request the specific rate from the
Department of Labor. AML will not issue change orders for additional compensation if the wage rate determined by DOL is higher than the rate the contractor used to develop his bid. If wage rates are not included for a specific category, AML suggests that the contractor assume the highest operator or laborer wages that are listed when developing his bid.
G. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.
(Check all that apply)
☐KYTC Encroachment Permit
☐KY DOW Water Permits
☐USACE Permit
The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project. The
CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the CONTRACTOR. Please refer to
“General Provisions” in the AML Technical Specifications.
COR & BID & BMP 3
BID ITEM DESCRIPTION
CLAY COUNTY, KENTUCKY
NO ITEM DESCRIPTION
1 MOBILIZATION This item consists of the mobilization and demobilization of the
CONTRACTOR’S forces and equipment in accordance with the
“Mobilization/Demobilization” AML Standard Technical Specification. The amount of this bid item is AS STATED ON THE BID SCHEDULE.
Measurement: Not Applicable.
Payment: Payment shall be made at increments set in the AML Technical
Specifications totaling the Lump Sum price.
2 SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 4
SILT CONTROL
3 SILT BARRIER–
BALES & FENCE
This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML
Standard Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.
Special Considerations: None
Major Incidentals: Maintenance, silt fence trenching and removal
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.
EARTHWORK
4. EARTHWORK-
BURNING REFUSE
This item of work shall consist of furnishing all materials, equipment, and labor necessary to excavate and extinguish burning refuse in a safe manor as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Burning Refuse” AML Standard Technical Specification.
Special Considerations: Depth of Burning refuse is unknown.
Major Incidentals: Mixing with soil (~2 refuse to 1 soil ratio) from designated area(s) or other materials to extinguish burning refuse. This in conjunction with
Water Pump will serve as the means of extinguishment. (Material at 100 degrees Fahrenheit or less is considered extinguished). A minimum of two foot of cover material shall be placed over top of cooled refuse prior to revegetation efforts.
Measurement: No measurements will be made unless the ENGINEER significantly revises the dimensions of the work area(s).
Payment: Payment shall be based on LUMP SUM PRICE BID and the Unit
Price bid for “EARTHWORK- BURNING REFUSE” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and final gradework efforts associated with designated waste areas.
COR & BID & BMP 5
5. EROSION
CONTROL
BLANKET-ECB
(BENCHES,
DITCHES, &
SLOPES)
This item consist of furnishing all materials, equipment, and labor necessary to install all types of erosion control blanket (ECB) as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Erosion Control Blanket” AML Standard Technical Specification.
Subgrade preparation shall be incidental. Placement of ECB for slope protection will also be covered by this bid item.
Special Considerations: None
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EROSION CONTROL BLANKET-ECB” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.
6. CLASS II / III –
(Ditches, Access)
This item consist of furnishing all materials, equipment, and labor necessary to install Class II and Class III rock as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” and “Ditches” AML Standard Technical
Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report %
CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton.
Material exceeding the 85% minimum is not adjusted.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II/III” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 6
REVEGETATION
7. SEEDBED
PREPARATION
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEEDBED
PREPARATION” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
8. AGRICULTURAL
LIMESTONE
These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. DAML will use the current Limestone
Sample Results published by the KY Department of Agriculture to determine a
Relative Neutralizing Value (RNV) for weight adjustment.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Application and incorporation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.) aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "AGRICULTURAL
LIMESTONE” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 7
9. FERTILIZER
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
10. SEED
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Seed mixture will be listed on the
Drawings, Project Description, and/or Special Conditions.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals:
Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEED” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
11. MULCH- STRAW &
HAY
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 8
12. COVER CROP
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
13. ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining” AML Standard Technical
Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROADWAY STONE” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
14. WATER PUMP This item consists of furnishing all materials, equipment, and labor necessary to accomplish the required soil temperature (100 degrees Fahrenheit or less) as depicted on the Drawings and as directed by the ENGINEER. Minimum requirement is 4” pump able to produce a flow rate of 400 gallons per minute.
Special Considerations: None
Major Incidentals: Equipment, operator, fuel, maintenance items
Measurement: Actual Quantities shall be measured as the next whole equipment hour as required to quench fire as approved by the ENGINEER. To qualify for “actual quantities” the pump must be in use, with an operator applying water and extinguishing burning material.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “WATER PUMP” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor and incidentals.
COR & BID & BMP 9
Erosion and Sediment Control
Best Management Practices (BMP) Plan
January 2017
COR & BID & BMP 10
OVERVIEW
This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned
Mine Lands (DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML)
Reclamation and Acid Mine Drainage (AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical Specifications and Standard
Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.
This general BMP document is to outline the various pollution prevention measures used on
AML Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES
Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas
(DDAs) and related information. The construction notes and project description may describe other control measures. The Contractor and Engineer may select an additional BMP for the project as the project changes and construction progresses. Projects that do not have DDAs annotated in the plans will employ the same concepts selecting and implementing this general
BMP plan.
Address disturbed areas or sources of sediments by the most effective means in the specific work area. Direct non-storm water discharges to sediment basins/traps or to a filter fence enclosure in a flat vegetated infiltration area or filtered via another approved commercial product. All deep mine and surface impoundment water will be tested and treated, when as necessary, to meet the
DAML Water-Treatment and Disposal Technical Specification unless stricter limitations are listed in an existing Total Daily Maximum Load (TMDL) limit.
PERMITS
The DAML shall review each project during project development to determine whether any permits are required to implement the project work. When a permit is required, DAML will make every effort to obtain the permit prior to letting the project for bidding. Permit specific conditions shall trump any standard conditions and/or practices. All permits must be maintained onsite and produced when requested by regulatory authorizes inducing representative of the permitting authority.
Common permits types for DAML projects:
COR & BID & BMP 11
• 401 Water Quality Certification (WQC) o Issued by the KY Division of Water
• 402 KY Pollution Discharge Elimination System (KPDES) o DAML activities are covered under the AML KPDES General Permit
• 404 US Army Corps of Engineers (USACE) o Issued by the US Army Corps of Engineers- Nashville District, Louisville District, or Huntington District (Depending upon major drainage basin)
• KY Stream Construction (Floodplain) o Issued by the KY Division of Water
• Local Floodplain Permit o Issued by the County/Municipality
• Local Storm Water Construction o Issued by the County/Municipality
A) Field Review Walk-Thru:
The DAML will conduct a project review between the Project Engineer, Construction Branch
Personnel, Project Design Technician, and Field Office Staff, to review the construction plans and identify any changes needed prior to letting the project for bidding. The group will evaluate the locations and types of site specific BMP and any other erosion prevention and sediment control measures chosen for incorporation into the final design plans.
B) Site Visit Meeting
DAML will present the project specific BMP and permit requirements/conditions to the potential contractors during the site visit meeting.
C) Pre-Construction Conference
Prior to the actual beginning of the project, DAML will hold a pre-construction conference between representatives of the DAML, the Contractor, including any Subcontractors, as well as other interested agencies and parties. Items discussed will include the time and sequence for construction, planned methods of operation, payment, and other relevant questions including any permit requirements and the erosion and sediment control plan.
D) Construction Access
This is the first land-disturbing activity. Construction entrances shall be a minimum of twenty
(20) feet wide by fifty (50) feet long, measured from the shoulder of the public road, and consist of No. 2 aggregate over a heavy weight non-woven filter fabric base. As soon as construction begins, stabilize bare areas with gravel and temporary mulch and/or vegetation.
E) Clearing and Grubbing
Use the following techniques for clearing and grubbing activities:
COR & BID & BMP 12
1) Leave areas undisturbed when possible.
2) Construct silt basins to provide silt volume for large areas.
3) Construct Silt Trap(s) Type A for small areas.
4) Construct Type B silt traps for areas with rapid runoff and sediment-laden runoff.
5) All silt traps should have a 3:1 flow length to width ratio. Add spreader bars, baffles, or turbidity curtains to maintain the flow path ratio when site conditions require traps sizes smaller than the standard detail dimensions.
6) Install geotextile bags and/or rock checks in front of existing drop inlets.
7) Construct diversion ditches to catch sheet runoff and carry it to basins or traps or to divert it around areas to be disturbed.
8) Maintain brush and/or other barriers to slow and/or divert runoff.
9) Construct silt fences/hay bales to catch sheet runoff on short slopes. For longer slopes, multiple rows of silt fence/hay bales may be considered.
10) Apply temporarily mulch to area not actively being disturbed or for any area left undisturbed for fourteen (14) days.
11) Employ non-standard or innovative methods.
F) Stream Crossings / Work Along Streams
1) Temporary low-water stream crossings follow the guidelines included in the DAML
Technical Specifications and those established by the KY Division of Water Floodplain
Management Section. Removal of a temporary crossing may be required to accommodate large storm events.
2) Do not completely block stream flow (even temporary). Instead, utilize some form of pass thru mechanism during all AML projects.
3) Work within a stream channel shall not cause flooding of properties upstream, downstream or within the project area or cause downstream water quality degradation. Minimize equipment contact time with the stream water by diverting water around equipment working in or along streams.
4) No flowing water will interact with any uncured concrete placed in the stream channel.
5) Divert all stream water around the work areas in accordance to methods listed in the DAML
Stream Protection & Relocation technical specification, AML Standard Details Section 60, and as by the appropriate permit guidelines.
6) Temporary out of channel stream diversion must use one of the three approved methods:
pipe diversion, sandbag/stone channel diversion, and/or fabric-based channel diversion.
Do not construct any temporarily diverted channel on bare, erodible soil. No temporary diversion shall be permanent without a 401, 404, and other appropriate permits.
COR & BID & BMP 13
G) Deep Mine and Surface Water Impoundments
The DAML Resident Inspector will test the mine water from deep mines and surface impoundments on the project area to determine the pH and total iron content. Treat the water until it meets the DAML Water-Treatment and Disposal Technical Specification or an existing TMDL, whichever is stricter, before release through a silt control structure(s).
Monitoring & Recording
The DAML Inspector will maintain a log of the pH and total iron content results prior to releasing and during each release day. Perform a minimum of two (2) tests downstream each day to ensure the maintenance of water quality during release and is not degrading the receiving stream.
Types of structures/facilities include:
1) Silt Traps Type A (20’L x 5’W x 2’D min dugout)
2) Silt Traps Type B (20’L x 5’W x 2’D min dugout with rock berm)
3) Silt Check - Rock checks with filter fabric core lining installed in channels and in front of pipes
4) Temporary silt control fence with Class II filter berm
5) Sediment collection bags
H) Cut and Fill and Placement of Drainage Structures
Areas at final grade will be seeded and mulched within five (5) days. Soil stock piles and areas that are not at final grade but where construction will cease for a period of fourteen (14) days or longer, shall receive temporary mulch no later than fourteen (14) days from the last construction activity in that area.
Types of structures/facilities include:
1) Silt Traps Type B (20’L x 5’W x 2’D min dugout with rock berm)
2) Silt Checks - Bags in front of pipes after they are placed
3) Channel lining
4) Erosion control blanket
5) Temporary mulch and/or seeding for areas where construction activities will be ceased for
14 days or more
6) Non-standard or innovative methods
I) Temporary Shutdown
Items to be completed prior to shutdown include:
1) Clean out behind, repair or replace silt fence and/or hay bales
2) Clean out all silt traps
COR & BID & BMP 14
3) Apply temporary mulch and track into the soil
4) Sow cover crop (weather permitting)
J) Finish Work
1) Establish permanent seeding and protection
2) Remove non-permanent silt checks from ditches and drains if protected with other BMPs sufficient to control erosion and vegetation is established.
3) Remove non-permanent silt traps and basins.
4) Remove geotextile silt fence.
5) Planting trees and/or shrubs where they are included in the project.
6) Clean out behind, repair, and/or replace bale silt barriers
7) Clean out all permanent silt traps and basins
K) Post-Construction
The Contractor shall assume responsibility for all workmanship and materials for a period of one year from the date of final payment, as directed by the Contract Documents. Any work found to be defective due to failure to comply with the provisions and intent of the Contract Documents shall be corrected at the Contractor's expense. Problems determined not to be created by the landowner or due to the Contractor will be addressed by the DAML for a period of up to three years, pending available funding.
OTHER CONTROL MEASURES
L) Solid Materials
No solid materials, including rock and building materials, shall be discharged into waters of the
U.S. except as authorized by the Clean Water Act (CWA) Section 401 and Section 404 permits.
M) Waste Materials
Collect and store waste materials that may leach pollutants (paint and paint containers, caulk tubes, oil/grease containers, liquids of any kind, soluble materials, etc.) in appropriate covered waste containers. Remove waste containers from the project site frequently as to not allow wastes to become a source of pollution. Instruct all personnel regarding the correct procedure for waste disposal and dispose of wastes in accordance with appropriate regulations.
N) Hazardous Waste
Manage and dispose of hazardous waste materials in the manner specified by local or state regulation. Notify the Resident Inspector if there are any hazardous wastes generated, and provide a plan for the management and disposal of such materials. Instruct site personnel with regard to proper storage and handling of hazardous wastes when required and use the practices to reduce the risks associated with all hazardous materials. Keep products in original containers
COR & BID & BMP 15
unless they are not re-sealable with the original labels and material safety data sheets (MSDS) will be reviewed and retained.
O) Spill Prevention
Use good housekeeping and material management practices to reduce the risk of spills or other exposure of materials and substances to the weather and/or runoff. Manufacturers' recommended methods for spill cleanup will be maintained on site and readily available upon request. Make personnel aware of procedures and the location of the information and cleanup supplies.
Equipment and materials will include as appropriate, brooms, dust pans, mops, rags, gloves, oil absorbents, sand, sawdust, and plastic and metal trash containers.
Clean up all spills immediately after discovery. Keep the spill area well ventilated. Personnel will wear appropriate protective clothing to prevent injury from contract with a hazardous substance. Report spills of toxic or hazardous material to the appropriate state/local agency as required by KRS 224 and applicable federal law. Wastes from spill cleanup will be disposed of in accordance with appropriate regulations. The spill prevention plan will be adjusted, as needed, to prevent spills from reoccurring and improve spill response and cleanup.
P) Petroleum Products
Monitor vehicles and equipment fueled and maintained on site for leaks, and receive regular preventative maintenance to reduce the chance of leakage. Protect petroleum products onsite will be stored in tightly sealed, clearly labeled containers from exposure to weather. The
CONTRACTOR shall not have a total of over 1,300 gallons of petroleum products on site at any given time.
Q) Fertilizers
Store fertilizers in a covered area away from water. Transfer the contents of any partially used bag of fertilizer to a sealable plastic bin to avoid spills. Once applied, work into the soil and apply mulch to limit exposure to storm water.
R) Concrete Truck Washout
Concrete truck mixers and chutes will not be washed on pavement, near storm drain inlets, or within seventy (75) feet of any ditch, stream, wetland, lake, or sinkhole. Where possible, discharge excess concrete and wash water to areas prepared for pouring new concrete, flat areas to be paved that are away from ditches or drainage system features, or other locations that will not drain off site. Where this approach is not possible, excavate a shallow earthen washbasin away from ditches to receive the wash water.
INSPECTIONS
Use inspection and maintenance practices to maintain erosion and sediment controls:
COR & BID & BMP 16
1) The Contractor and DAML Resident Inspector will inspect all erosion prevention and sediment control measures at least once each week and following any rain of 0.1 inch or more.
2) The DAML Resident Inspector will record the silt control inspections by in their daily report.
3) Silt fences/hay bales will be inspected for bypassing, overtopping, undercutting, depth of sediment, tears, and to ensure attachment to secure posts.
4) Inspect silt traps and basins for depth of sediment, and built-up sediment and clean out when it reaches 50% of the design capacity and at the end of the job.
5) Inspect diversion dikes and berms and promptly repaired any breaches. Repair areas that are eroding or scouring and re-seeded / mulched as needed.
6) Inspect temporary and permanent seeding and mulching for bare spots, washouts, and healthy growth. Repair bare or eroded areas as needed.
7) Inspect all material storage and equipment servicing areas that involve the management of bulk liquids fuels and bulk solids weekly for conditions that represent a release or possible release of pollutants to the environment.
MAINTENANCE
Maintain all measures in good working order; initiate corrective actions within twenty-four (24) hours of being reported and completed with five (5) days, address critical failures immediately unless site conditions are too dangerous. Remove Built-up sediment from behind the silt fence/hay bales before it has reached halfway up the height of the fence.
ENFORCEMENT
At all times, representatives from DAML and enforcement agencies will have access to the project site. The ENGINEER reserves right to stop work until erosion prevention and sediment control problems are addressed to his/her satisfaction.
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text Index of Sheets
AutoCAD SHX Text F:\Projects\AML\23119AMLBAML (Gray Fork Enterprises - Refuse Fire)\1 Design Phase\1 Drawings\23119AMLBAML (Gray Fork Enterprises - Refuse Fire)-6-26-24.dwg
AutoCAD SHX Text
LAYOUT PLANVIEW W/ PHOTO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
23119AMLBAML
AutoCAD SHX Text
CLAY COUNTY, KENTUCKY
AutoCAD SHX Text
23119AMLBAML CLAY COUNTY
AutoCAD SHX Text 7/8/2024 9:51:23 AM stefanie.mills stefanie.millsstefanie.mills
AutoCAD SHX Text DRIVING DIRECTIONS: TAKE THE KY-80 RAMP TO US-421/MANCHESTER AND TURN LEFT ONTO KY-80 E (SIGNS FOR US-421/MANCHESTER/EKU CAMPUS/VISITOR CTR). TRAVEL 1.4 MILES ON US-421 N. TURN RIGHT ONTO BRIDGE ON 2ND ST. AT THE END OF THE BRIDGE, TURN RIGHT ONTO RAILROAD AVE AND TRAVEL 0.5 MILES TO THE SALT WORKS FESTIVAL PIONEER VILLAGE. PERMIT ACCESS ROAD IS LOCATED AT THE GRAVEL PARKING AREA FOR PIONEER VILLAGE AT COORDINATES: 37.145917°, -83.760119°. ONCE THROUGH THE PERMIT GATE, THE AREA OF CONCERN IS ANOTHER 0.5 MILES. LATITUDE: 37.140022° LONGITUDE:-83.758761°37.140022° LONGITUDE:-83.758761° LONGITUDE:-83.758761°
AutoCAD SHX Text FINANCE AND ADMINISTRATION CABINET DEPARTMENT FOR FACILITIES & SUPPORT SERVICES DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION FRANKFORT, KENTUCKY
AutoCAD SHX Text ENERGY AND ENVIRONMENT CABINET DEPARTMENT FOR NATURAL RESOURCES DIVISION OF ABANDONED MINE LANDS
AutoCAD SHX Text THE AML STANDARD DETAILS AND TECHNICAL SPECIFICATIONS ARE AVAILABLE ON OUR WEBSITE AT: WWW.AML.KY.GOV UNDER "STANDARD DETAILS AND SPECIFICATIONS". BY BIDDING ON THIS PROJECT THE UNDER "STANDARD DETAILS AND SPECIFICATIONS". BY BIDDING ON THIS PROJECT THE CONTRACTOR ACKNOWLEDGES THEY HAVE REVIEWED AND UNDERSTAND THE STANDARD DETAILS AND TECHNICAL SPECIFICATIONS AS THEY APPLY TO THIS PROJECT. UTILITY NOTE PRIOR TO ANY EXCAVATION OR THE PLACEMENT OF FILL, THE CONTRACTOR IS REQUIRED TO CALL “KENTUCKY KENTUCKY 811” TWO (2) BUSINESS DAYS PRIOR TO ANY EXCAVATION / EXCAVATION ACTIVITIES. IF THERE ARE UTILITIES TWO (2) BUSINESS DAYS PRIOR TO ANY EXCAVATION / EXCAVATION ACTIVITIES. IF THERE ARE UTILITIES IN THE WORK AREAS THAT ARE NOT MEMBERS OF “KENTUCKY 811”, EACH UTILITY HAS TO BE CONTACTED KENTUCKY 811”, EACH UTILITY HAS TO BE CONTACTED , EACH UTILITY HAS TO BE CONTACTED DIRECTLY TO HAVE THEIR FACILITIES MARKED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ABIDE BY THE "UTILITY RELOCATION" TECHNICAL SPECIFICATION AND SECTION 22.3 OF THE "GENERAL PROVISIONS" TECHNICAL SPECIFICATION. DEPICTION OF THE UTILITIES ON THE PLANS ARE APPROXIMATE AND MAY NOT INCLUDE ALL EXISTING UTILITIES.
AutoCAD SHX Text Project location
AutoCAD SHX Text
PLANVIEW W/O PHOTO
AutoCAD SHX Text
AutoCAD SHX Text
PLANVIEW W/ THERMAL
ð
AutoCAD SHX Text
LAT:37°08'18.3015"
AutoCAD SHX Text
LON:83°45'29.6827"
AutoCAD SHX Text
LAT:37°08'19.5281"
AutoCAD SHX Text
LON:83°45'26.0691"
AutoCAD SHX Text
LAT:37°08'21.9274"
AutoCAD SHX Text
LON:83°45'23.5820"
AutoCAD SHX Text
LAT:37°08'19.6743"
AutoCAD SHX Text
LON:83°45'29.3767"
AutoCAD SHX Text
LAT:37°08'24.3989"
AutoCAD SHX Text
LON:83°45'31.3349"
AutoCAD SHX Text
LAT:37°08'28.0735"
AutoCAD SHX Text
LON:83°45'32.3684"
AutoCAD SHX Text
LAT:37°08'30.3078"
AutoCAD SHX Text
LON:83°45'31.2803"
AutoCAD SHX Text
LAT:37°08'23.2585"
AutoCAD SHX Text
LON:83°45'33.0967"
AutoCAD SHX Text
LAT:37°08'29.0242"
AutoCAD SHX Text
LON:83°45'33.6071"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .