Addendum One .pdf

PDF 11 MB Posted

Attached to
RFB-12-25 KSP KEWS Tower Structural Modifications W2-C1
Solicitation number
RFB 785 2500000008 2
Issued by
Madison County, Kentucky

About this file

This Addendum One document is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for Invitation to Bid No. RFB-12-25 concerning Emergency Radio System Replace Phase 3 KSP-KEWS Tower Structural Modifications W2/C1 at various locations throughout Kentucky. The project involves structural modifications to two guyed towers: an 805-foot tower located in Richmond, Kentucky (WKLE site) and a 947-foot tower located in Science Hill, Kentucky (WKSO site). A pre-bid meeting was held on July 31, 2024, at 10:00 a.m. EST, with attendance from Allstate Tower, Inc. The addendum was distributed on August 6, 2024, and references additional specifications and drawings provided by Lynn Imaging. The project scope includes replacing diagonal and horizontal members at multiple elevations, installing leg reinforcements, replacing guy wires, and performing foundation modifications at each tower location.

The addendum establishes that all costs associated with gaining site access throughout construction shall be the responsibility of the contractor. Detailed structural modification drawings, specifications, and post-modification inspection reports prepared by Neel-Schaffer, Inc. are provided for informational purposes. Post-modification inspections conducted in August 2019 confirmed that modifications at both the WKLE tower passed inspection with no substantial deficiencies, while the WKSO tower passed with noted exceptions regarding neglected diagonal changeouts and field straightening of a bent horizontal member instead of replacement. The contract documents include comprehensive technical drawings, foundation modification details, guy cable hardware specifications, and photographic documentation of completed work at both sites.

View the file

Other files

File Type Posted
Final_RFB_785_2500000008_1_SO_FORM.PDF PDF
Final_RFB_785_2500000008_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-12-25

FOR: Emergency Radio System Replace Phase 3 KSP-KEWS Tower Structural Modifications W2/C1 Various Locations, Kentucky

DATE: August 6, 2024

RFB-785-2500000008

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-12-25 For: Emergency Radio System Replace Phase 3 KSP-KEWS Tower Structural Modifications W2/C1 Various Locations, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

RFB-12-25 KSP-KEWS Tower Structural Modifications - W2/C1

Pre-Bid Meeting – 7/31/2024, 10 am EST Attendees:

Allstate Tower, Inc. – Josh Bridgeman

Addendum No. 1

SPECIFICATIONS

1. Special Conditions

a. Article 14, “Other Special Conditions of Contract”

ADD the following.

All efforts required to gain access to the tower sites throughout construction will be at the contractor’s expense.

2. Technical Specifications

a. Add the following structural modification drawings and post modification inspection reports for informational purposes.

DRAWINGS

None.

UTILITY NOTES:

SCALE: N.T.S.

SITE ADDRESS:

PROJECT DATA:

CIVIL ENGINEER:

DRAWING INDEX:

MODIFICATION DRAWINGS FOR

805' GUYED TOWER

RICHMOND, KY

PREPARED BY

ADA COMPLIANCE:

POWER COMPANY:

PROJECT DESCRIPTION:

COORDINATES: SITE

SITE DIRECTIONS:

SITE NAME:

PROJECT EXCLUSIONS:

12/06/17

GENERAL NOTES & SCHEDULE

T-2

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

PROP. ELEVATION

S-1

TOWER ELEVATIONS &

SPECIFICATIONS

FEEDLINE PLAN

SECTIONS A - B

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

SECTIONS

A - B

RETROFIT DETAILS

S-2

SECTIONS C - D

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

SECTIONS

C-D

S-3

SECTIONS E - F

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

SECTIONS

E - F

S-4

SECTIONS G - H

SOLID ROD CONNECTION DETAIL PIPE CONNECTION DETAIL

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

SECTIONS

G - H

S-5

SECTIONS I - J

SOLID ROD CONNECTION DETAIL TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-6

SECTIONS

I - J

SECTIONS K - L

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-7

SECTIONS

K - L

SECTIONS M - N

SOLID ROD CONNECTION DETAIL PIPE CONNECTION DETAIL TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-8

SECTIONS

M - N

SECTIONS O - P

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-9

SECTIONS

O - P

SECTIONS Q - R

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-10

SECTIONS

Q - R

SECTIONS S - T

PIPE CONNECTION DETAIL

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-11

SECTIONS

S - T

SECTIONS BB - CC

SOLID ROD CONNECTION DETAIL

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

S-12

SECTIONS

BB - CC

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

LEG MODIFICATION

TYPICAL DETAILS

S-13

END CONNECTION BRACKET DETAIL

INTERMEDIATE SUPPORT BRACKET ELEVATION VIEW

INTERMEDIATE SUPPORT BRACKET DETAIL

4' END CONNECTION BRACKET DETAIL

1' END CONNECTION BRACKET DETAIL

TOWER AND

FOUNDATION

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

LEG MODIFICATION

TYPICAL DETAILS

S-14

MODIFICATION

WKLE

TOWER AND

FOUNDATION

MODIFICATION

WKLE

ANCHOR

CONNECTION DETAILS

S-15

GUY CABLE HARDWARE

EXISTING INNER ANCHOR

RADIUS VARIES

EXISTING OUTER ANCHOR

RADIUS VARIES

MODIFICATION

WKLE

PLAN

TOWER FND DETAIL

SECTION "A-A"

SECTION "B-B"

BB

AA

MATERIAL LIST

FOUNDATION

MODIFICATION DETAILS

S-16

MODIFICATION

WKLE

EXISTING SITE PLAN PROPOSED FOUNDATION PLAN

SITE PLAN

S-17

POST MODIFICATION INSPECTION

WKLE

4060 Igo Road Richmond, Kentucky

Prepared on behalf of:

Kentucky Authority for Educational Television

Submitted by:

Neel-Schaffer, Inc.

200 Whittington Parkway, Suite 205 Louisville, KY 40222

502-429-9902

August 2019 eng ineers p lanners su rveyors env i ronmenta l sc ien t is ts landscape a rch itects

2 0 0 W h i t t i n g t o n P a r k w a y , S u i t e 2 0 5 , L o u i s v i l l e , K Y 4 0 2 2 2 • 5 0 2 . 4 2 9 . 9 9 0 2 • F a x 5 0 2 . 7 4 9 . 3 4 3 4

August 19, 2019

Mr. Curtis Harper CBT Director, Transmission Systems Division Kentucky Educational Television 600 Cooper Drive Lexington, KY 40502

REFERENCE: MODIFICATION INSPECTION REPORT – KET

KET SITE NAME: WKLE

805' GUYED TOWER

NEEL-SCHAFFER, INC. PROJECT NO. 13803

Dear Mr. Harper, Neel-Schaffer, Inc. (NSI) has completed a Modification Inspection Report (MI) of the subject WKLE 805’ guyed tower located in Madison County, KY. The purpose of this MI is to verify that the installed modifications are in general conformance with the contract documents. A full review of the on-site materials and the drone photography was performed by NSI. The process used to inspect and label modification members was developed by NSI and presented to all parties involved in this project during the pre-construction meeting at KET June 20, 2018. This MI is not a review of the adequacy or effectiveness of the modification analysis.

Table 1 – General Information

Company Contact

Report Prepared by Neel Schaffer, Inc Matt Iburg

MI Inspector Neel Schaffer, Inc Matt Iburg, James Lawson

Modification Design EOR Neel Schaffer, Inc. Brad Bivens, P.E.

General Contractor Allstate Tower, Inc. Nick Riley

Table 2 – Documents

Document Remarks Source

WKLE Modification Drawings for 805’ Tower Date signed: 12/6/2017 Neel Schaffer Inc.

WKLE Post Mod Inspection

Inspected Work:

1. Replaced diagonal members from ±EL. 143’ – 185’, 217’ – 277’, 300’ – 317’, 410’ – 435’ &

660’ – 685’

2. Replaced horizontal members from ±EL. 151’ – 185’, 235’ – 260’, 292’ – 317’, 418 – 435’ &

444’

3. Install leg reinforcements from ±EL. 0’ – 435’

4. Replaced guyed wires at ±EL. 135’ & 285’

5. Foundation Modifications

Based upon the review of the documents and photos provided (see attachments), NSI determines that the installed tower modifications:

_ X_PASS*

The configuration and materials of the modifications are installed in general accordance with the Contract Documents and no substantial deficiencies were found.

* The inspection of the installed modifications does not include verification of installation workmanship (e.g. snug tightness of bolted connections, and the quality and/or size of welded connections in accordance with accepted industry standards).

__ PASS AS NOTED

The configuration and materials of the modifications are accepted as noted (see comments below).

___ FAIL

The configuration, materials and/or workmanship of the modifications are NOT installed in accordance with the Contract Documents. The rejection is based on non-conformance in the following area(s):

__ Materials (see detail below) __ Workmanship (see detail below) __ Configuration (see detail below)

Any conditions discovered which deviate from the information contained in this letter should be presented to Neel-Schaffer, Inc. for further review.

This report has been prepared for the sole purpose of providing KET an inspection of this tower for the modifications indicated in the construction documents. It is intended for the exclusive use of KET and its authorized agents. The information, assumptions and conclusions contained in this report should not be used by others for any purpose without the express written authorization from NSI. If conditions differ from those contained in this report, NSI should be contacted to evaluate this information.

We appreciate the opportunity to work with KET and look forward to contributing to the success of this project. If we can be of any further assistance, please do not hesitate to contact us.

WKLE Post Mod Inspection

Sincerely, NEEL-SCHAFFER, INC.

Brad Bivens, P.E.

Senior Structural Engineer

Attachments:

1) As-Built documentation provided by Allstate Tower, Inc. dated 8/16/19

2) Modification Labeling Database

3) Inspection Photos

Tower Name: WKLE

Elevation

(Bottom)

Elevation

(Top)

Page in

Drawing Set Member Type Prop. Member Size Letter

Label

Color

Tape

Color Section #1 Label

Label Quantity

Required Ex. Member Size

0' 35' S‐2 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

35' 85' S‐3 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

85' 135' S‐4 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

135' 185' S‐5 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

185' 235' S‐6 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

235' 285' S‐7 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

285' 335' S‐8 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

335' 385' S‐9 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

385' 435' S‐10 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

143' 160' S‐5 Diagonal 1" SR D Green Green 3 D‐3 12 3/4" SR

160' 185' S‐5 Diagonal 1" SR D Green Green 3 D‐3 18 5/8" SR

217' 235' S‐6 Diagonal 7/8" SR D Green Green 2 D‐2 12 5/8" SR

235' 260' S‐7 Diagonal 7/8" SR D Green Green 2 D‐2 18 5/8" SR

260' 269' S‐7 Diagonal 1" SR D Green Green 3 D‐3 6 3/4" SR

269' 277' S‐7 Diagonal 7/8" SR D Green Green 2 D‐2 6 3/4" SR

300' 317' S‐8 Diagonal 1" SR D Green Green 3 D‐3 12 5/8" SR

410' 418' S‐10 Diagonal 1" SR D Green Green 3 D‐3 6 5/8" SR

418' 427' S‐10 Diagonal 7/8" SR D Green Green 2 D‐2 6 5/8" SR

427' 435' S‐10 Diagonal 3/4" SR D Green Green 1 D‐1 6 5/8" SR

660' 685' S‐12 Diagonal 3/4" SR D Green Green 1 D‐1 18 5/8" SR

151' 185' S‐5 Horizontal 2.5" x 0.2" Pipe H Green Green 1 H‐1 15 2" x 0.125" Pipe

235' 260' S‐7 Horizontal 2.5" x 0.2" Pipe H Green Green 1 H‐1 9 2" x 0.125" Pipe

292' 317' S‐8 Horizontal 2.5" x 0.2" Pipe H Green Green 1 H‐1 12 2" x 0.125" Pipe

410' 435' S‐10 Horizontal 2.5" x 0.2" Pipe H Green Green 1 H‐1 9 2" x 0.125" Pipe

444' 444' S‐11 Horizontal 2.5" x 0.2" Pipe H Green Green 1 H‐1 9 2" x 0.125" Pipe

135' 135' S‐4 Guy Wire 1" GW White 1 GW‐1 3 3/4"

285' 285' S‐4 Guy Wire 1" GW White 1 GW‐1 6 3/4"

‐ 237 Total Labels

Inspection Photos

10' Leg Mod Ends

135' New Guyed Wires

Tower Inspection Date: 6/4/2019;

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 2

miburg Text Box Leg Mod End Connection Brackets miburg Line miburg Line miburg Text Box 10'

143' ‐ 160' Diagonals and Horizontals 160' ‐ 185' Diagonals and Horizontals

Tower Inspection Date: 6/4/2019;

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 3

miburg Text Box 160' miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Line miburg Text Box 135' miburg Text Box 185' miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Text Box 3 Green Bands confirming install miburg Line miburg Oval miburg Line miburg Oval miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Text Box 160' miburg Line

217' ‐ 235' Diagonals 235' ‐ 260' Diagonals and Horizontals

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 4

miburg Text Box 235' miburg Line miburg Oval miburg Line miburg Text Box 2 Green Bands confirming install miburg Text Box 2 Green Bands confirming install miburg Line miburg Oval miburg Text Box 260' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Text Box 235' miburg Line miburg Line miburg Oval miburg Oval miburg Oval miburg Oval miburg Oval miburg Text Box 2 Green Bands confirming install miburg Line miburg Line miburg Text Box 2 Green Bands confirming install miburg Line miburg

2 Green Bands confirming install

260' ‐ 277' Diagonals and new guyed wires 292' ‐ 317' Diagonals and Horizontals

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 5

miburg Oval miburg Line miburg Text Box 2 Green Bands confirming install miburg Text Box 3 Green Bands confirming install miburg Line miburg Oval miburg Text Box 260' miburg Line miburg Text Box 317' miburg Text Box 1 Green Band confirming install miburg Text Box 3 Green Bands confirming install miburg Text Box 292' miburg Text Box 285' miburg Line miburg Line miburg Oval miburg Line miburg Oval miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Line miburg Text Box 1 Green Band confirming install

410' ‐ 435' Diagonals and Horizontals and 345' Leg Mod End 444' Horizontals

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 6

miburg Text Box Leg Mod End Connection Bracket miburg Line miburg Line miburg Text Box 435' miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 410' miburg Line miburg Oval miburg Line miburg Text Box 3 Green Bands confirming install miburg Oval miburg Line miburg Text Box 2 Green Bands confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 460' Torque Arm miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Line miburg

444'

660' ‐ 685' Diagonals start of excavation 1

Tower Inspection Date: 6/4/2019;

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 7

miburg Text Box 685' miburg Line miburg Text Box 660' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg

1 Green Band confirming install start of excavation 2

Vertical Dowels

Tower Inspection Date: 6/4/2019;

Foundation Inspection Dates: 7/12 ‐ 7/18/2018

WKLE 8

Horizontal Dowels Rebar installation 1

Foundation Inspection Dates: 7/12 ‐

WKLE 9

Rebar installation 2 Rebar installation 3

Foundation Inspection Dates: 7/12 ‐

WKLE 10

Rebar installation 4 Formwork 1

Foundation Inspection Dates: 7/12 ‐

WKLE 11

Formwork 2

Formwork 3

Tower Inspection Date: 6/4/2019;

Foundation Inspection Dates: 7/12 ‐

WKLE 12

Formwork 4 Conrete placement 1

Foundation Inspection Dates: 7/12 ‐

WKLE 13

Conrete placement 2 Conrete placement 3

Foundation Inspection Dates: 7/12 ‐

WKLE 14

Forms removed 1 Forms removed 2

Foundation Inspection Dates: 7/12 ‐

WKLE 15

Backfill 1 Backfill 2

Foundation Inspection Dates: 7/12 ‐

WKLE 16

grounding repaired 1 grounding repaired 2

Foundation Inspection Dates: 7/12 ‐

WKLE 17

ground leveled

Foundation Inspection Dates: 7/12 ‐

WKLE 18

UTILITY NOTES:

SCALE: N.T.S.

SITE ADDRESS:

PROJECT DATA:

CIVIL ENGINEER:

MODIFICATION DRAWINGS FOR

947' GUYED TOWER

SCIENCE HILL, KY

PREPARED BY

ADA COMPLIANCE:

POWER COMPANY:

PROJECT DESCRIPTION:

COORDINATES:

SITE

SITE DIRECTIONS:

SITE NAME:

PROJECT EXCLUSIONS:

DRAWING INDEX:

TOWER

WKSO

GENERAL NOTES & SCHEDULE

T-2

WKSO

PROP. ELEVATION

S-1

TOWER ELEVATIONS &

SPECIFICATIONS

FEEDLINE PLAN

SECTIONS A - B

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

SECTIONS

A - B

S-2

SECTIONS C - D

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

SECTIONS

C-D

S-3

SECTIONS E - F

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

SECTIONS

E - F

S-4

SECTIONS G - J

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

SECTIONS

G - J

S-5

SECTIONS K - L

SOLID ROD CONNECTION DETAIL PIPE CONNECTION DETAIL TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-6

SECTIONS

K - L

SECTIONS M - N

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-7

SECTIONS

M - N

SECTIONS P - Q

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-8

SECTIONS

P - Q

SECTIONS R - S

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-9

SECTIONS

R - S

SECTIONS T - U

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-10

SECTIONS

T - U

SECTIONS V - W

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-11

SECTIONS

V - W

SECTIONS X - Y

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

S-12

SECTIONS

X - Y

WKSO

TOWER

MODIFICATION

WKSO

TYPICAL

DETAILS

S-13

END CONNECTION BRACKET DETAIL

INTERMEDIATE SUPPORT BRACKET ELEVATION VIEW

INTERMEDIATE SUPPORT BRACKET DETAIL

4' END CONNECTION BRACKET DETAIL

1' END CONNECTION BRACKET DETAIL

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

LEG MODIFICATION

TYPICAL DETAILS

S-14

WKSO

TOWER

MODIFICATION

WKSO

PROPOSED ANCHOR

CONNECTION DETAILS

S-15

GUY CABLE HARDWARE

EXISTING INNER ANCHOR

RADIUS VARIES

SECTION L SECTION LL

PIPE CONNECTION DETAILANGLE CONNECTION DETAIL

TOWER

MODIFICATION

WKSO

TOWER

MODIFICATION

WKSO

SECTIONS

L, LL

S-16

POST MODIFICATION INSPECTION

WKSO

3684-3800 State Highway 837 Science Hill, Kentucky

Prepared on behalf of:

Kentucky Authority for Educational Television

Submitted by:

Neel-Schaffer, Inc.

200 Whittington Parkway, Suite 205 Louisville, KY 40222

502-429-9902

August 2019 eng ineer s pl anners sur veyors env i r onm ent al sci ent is ts lands cape ar chi t ects

2 0 0 W h i t t i n g t o n P a r k w a y , S u i t e 2 0 5 , L o u i s v i l l e , K Y 4 0 2 2 2 • 5 0 2 . 4 2 9 . 9 9 0 2 • F a x 5 0 2 . 7 4 9 . 3 4 3 4

Mr. Curtis Harper CBT Director, Transmission Systems Division Kentucky Educational Television 600 Cooper Drive Lexington, KY 40502

REFERENCE: MODIFICATION INSPECTION REPORT – KET

KET SITE NAME: WKSO

599' GUYED TOWER

NEEL-SCHAFFER, INC. PROJECT NO. 13803

Dear Mr. Harper, Neel-Schaffer, Inc. (NSI) has completed a Modification Inspection Report (MI) of the subject WKSO 947’ guyed tower located in Casey County, KY. The purpose of this MI is to verify that the installed modifications are in general conformance with the contract documents. A full review of the on-site materials and the drone photography was performed by NSI. The process used to inspect and label modification members was developed by NSI and presented to all parties involved in this project during the pre-construction meeting at KET June 20, 2018. This MI is not a review of the adequacy or effectiveness of the modification analysis.

Table 1 – General Information

Company Contact

Report Prepared by Neel Schaffer, Inc Matt Iburg

MI Inspector Neel Schaffer, Inc Matt Iburg, James Lawson

Modification Design EOR Neel Schaffer, Inc. Brad Bivens, P.E.

General Contractor Allstate Tower, Inc. Nick Riley

Table 2 – Documents

Document Remarks Source

WKSO Modification Drawings for 947’ Tower Date signed: 12/7/2017 Neel Schaffer Inc.

WKSO Post Mod Inspection

Inspected Work:

1. Replaced diagonal members from ±EL. 235’ – 260’, 310’ – 335’, 410’ – 435’, 460’ – 510’ &

560’ – 610’

2. Replaced horizontal members from ±EL. 260’ – 285’, 435’ – 485’, & 585’ – 610’

3. Install leg reinforcements from ±EL. 0’ – 335’ & 360’ – 585’

4. Replaced guyed wires at ±EL. 135’, 285’, & 435’

5. Replaced bent horizontals at ±EL. 285’ & 935’

Based upon the review of the documents and photos provided (see attachments), NSI determines that the installed tower modifications:

_ _PASS*

The configuration and materials of the modifications are installed in general accordance with the Contract Documents and no substantial deficiencies were found.

_X PASS AS NOTED

The configuration and materials of the modifications are accepted as noted (see comments below).

1. Neglected diagonal changeouts shown on pages S-2 and S-6 of the attached As-Builts dated 12/7/2018 were discussed and agreed upon by the engineer of record.

2. Bent horizontal at ±EL. 285’ was straightened in the field instead of being replaced. Bent horizontal at ±EL. 933’ was replaced with an existing tower member of equal size that was removed from another section of the tower.

* The inspection of the installed modifications does not include verification of installation workmanship (e.g. snug tightness of bolted connections, and the quality and/or size of welded connections in accordance with accepted industry standards).

___ FAIL

The configuration, materials and/or workmanship of the modifications are NOT installed in accordance with the Contract Documents. The rejection is based on non-conformance in the following area(s):

__ Materials (see detail below) __ Workmanship (see detail below)

__ Configuration (see detail below)

Any conditions discovered which deviate from the information contained in this letter should be presented to Neel-Schaffer, Inc. for further review.

This report has been prepared for the sole purpose of providing KET an inspection of this tower for the modifications indicated in the construction documents. It is intended for the exclusive use of

WKSO Post Mod Inspection

KET and its authorized agents. The information, assumptions and conclusions contained in this report should not be used by others for any purpose without the express written authorization from NSI. If conditions differ from those contained in this report, NSI should be contacted to evaluate this information.

We appreciate the opportunity to work with KET and look forward to contributing to the success of this project. If we can be of any further assistance, please do not hesitate to contact us.

Sincerely, NEEL-SCHAFFER, INC.

Brad Bivens, P.E.

Senior Structural Engineer

Attachments:

1) As-Built documentation provided by Allstate Tower, Inc. dated 8/16/19

2) Modification Labeling Database

3) Inspection Photos

Tower Name: WKSO

Elevation

(Bottom)

Elevation

(Top)

Page in

Drawing Set Member Type Prop. Member Size Letter

Label

Color

Tape

Color Section #1 Label

Label Quantity

Required Ex. Member Size

0' 35' S‐2 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

35' 85' S‐3 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

85' 135' S‐4 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

135' 235' S‐5 Leg 2" SR L Blue Blue 1 L‐1 12 N/A

235' 285' S‐6 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

285' 335' S‐7 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

360' 410' S‐8 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

410' 460' S‐9 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

460' 510' S‐10 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

510' 560' S‐11 Leg 2" SR L Blue Blue 1 L‐1 6 N/A

560' 585' S‐12 Leg 2" SR L Blue Blue 1 L‐1 3 N/A

235' 260' S‐6 Diagonal 7/8" SR D Green Green 1 D‐1 18 5/8"

310' 335' S‐7 Diagonal 7/8" SR D Green Green 1 D‐1 18 5/8"

410' 435' S‐9 Diagonal 7/8" SR D Green Green 1 D‐1 18 5/8"

460' 510' S‐10 Diagonal 7/8" SR D Green Green 1 D‐1 36 5/8"

560' 610' S‐12 Diagonal 7/8" SR D Green Green 1 D‐1 36 5/8"

260' 276' S‐6 Horizontal 2.5" x 0.2" Pipe H Black Black 1 H‐1 6 2" x 0.125" Pipe

285' 285' S‐6 Horizontal L2.5 x 2.5 x 3/16" H Black Black 2 1 L2.5 x 2.5 x 3/16"

435' 460' S‐9 Horizontal 2.5" x 0.2" Pipe H Black Black 1 H‐1 9 2" x 0.125" Pipe

585' 602' S‐12 Horizontal 2.5" x 0.2" Pipe H Black Black 1 H‐1 6 2" x 0.125" Pipe

935' 935' S‐16 Horizontal 2" x 0.125" Pipe H Black Black 3 H‐3 1 2" x 0.125" Pipe

135' 135' S‐4 Guy Wire 1" GW 1 0 7/8"

285' 285' S‐6 Guy Wire 1" GW 1 0 7/8"

435' 435' S‐9 Guy Wire 1‐1/8" GW 2 0 15/16"

‐ 218 Total Labels

Inspection Photos

10' Leg Mod Ends

135' New Guyed Wires

Tower Inspection Date: 6/6/2019 WKSO 2

235' ‐ 260' Diagonals 260' ‐ 285' Horizontals

Tower Inspection Date: 6/6/2019 WKSO 3 miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Text Box 1 Green Band confirming install miburg Text Box 235' miburg Line miburg Line miburg Text Box 260' miburg Text Box 276' miburg Line miburg Text Box 260' miburg Line miburg Text Box 1 Black Band confirming install miburg Line miburg Oval miburg Line miburg Text Box 1 Black Band confirming install

Oval

285' Bent Horizontal 285' Horizontal straightened

Tower Inspection Date: 6/6/2019 WKSO 4

285' New Guyed Wires 310' ‐ 335' Diagonals and Leg Mod End

Tower Inspection Date: 6/6/2019 WKSO 5 miburg Text Box 335' miburg Line miburg Text Box 310' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Text Box 1 Green Band confirming install miburg Line miburg Text Box 1 Green Band confirming install miburg Oval

Oval

360' Leg mod end 410' ‐ 435' Diagonals 435' New Guyed Wires

Tower Inspection Date: 6/6/2019 WKSO 6 miburg Text Box Leg Mod End Connection Bracket miburg Line miburg Text Box 435' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Line miburg

410'

435' ‐ 460' Horizontals 460' ‐ 485' Diagonals

Tower Inspection Date: 6/6/2019 WKSO 7 miburg Text Box 1 Black Band confirming install miburg Line miburg Text Box 1 Black Band confirming install miburg Line miburg Oval miburg Oval miburg Line miburg Text Box 460' miburg Line miburg Text Box 435' miburg Oval miburg Text Box 1 Black Band confirming install miburg Line miburg Text Box 485' miburg Line miburg Text Box 460' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg

1 Green Band confirming install

485' ‐ 510' Diagonals 560' ‐ 585' Diagonals and Leg Mod End

Tower Inspection Date: 6/6/2019 WKSO 8 miburg Text Box 510' miburg Line miburg Text Box 485' miburg Line miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box Leg Mod End Connection Bracket miburg Line miburg Line miburg Text Box 585' miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Text Box 560'

585' ‐ 610' Diagonals and Horizontals

933' Bent Horizontal removed Tower Inspection Date: 6/6/2019 WKSO 9 miburg Line miburg Text Box 610' miburg Oval miburg Line miburg Text Box 1 Green Band confirming install miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Text Box 1 Green Band confirming install miburg Line miburg Oval miburg Text Box 585'

933' Horizontal

Tower Inspection Date: 6/6/2019 WKSO 10 miburg Text Box Bent horizontal replaced

Addendum One
RFB-12-25 Addendum 1
WKLE Post Modification Inspection 8.19.19 (prelim).pdg
WKLE As-Builts (8.16.19)
Post Mod Label Database (WKLE)
WKSO Post Modification Inspection 8.19.19 (prelim).pdg
WKSO formal cover sheet
WKSO As-builts (8.16.19)
Post Mod Label Database (WKSO)
Inspection Photos

File details come from the government source that posted it. Updated .