This Addendum One document issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration pertains to Request for Bid No. RFB-107-24 for FFA Cabin Renovations Phase 2 at the Department of Education facility in Hardinsburg, Kentucky (Breckinridge County). The project involves renovations to ten cabins located at 111 FFA Camp Road. The addendum clarifies and modifies specifications and drawings related to architectural, structural, and mechanical-electrical-plumbing (MEP) systems. Key clarifications include confirmation that all existing asbestos-containing floor tiles and adhesive will be removed by the state, specifications for epoxy floor color (standard gray without flakes) and mow strip width (18 inches), wood base trim specifications (2x6), and verification that existing fascia board is in good condition. The document provides detailed Cold-Formed Metal Framing specifications (Section 054000) covering exterior non-load-bearing wall furring materials, including 3/4" and 1-1/2" U-channels and 1-1/2" Z-furring channels with specific grades, coatings, and spacing requirements.
The addendum contains extensive electrical clarifications addressing panelboard installations, disconnect switches, and exit lighting fixtures. Notably, no new electrical feed will be installed from the transformer source; instead, the existing underground panelboard feed will be intercepted and transitioned above grade to a new 60-ampere, 2-pole fused disconnect switch connecting to the new panelboard. The electrical contractor is required to provide locking hasps with rivets for the electrical panelboard and padlocks with keys for interior panelboards and exterior disconnects. Additional requirements include connecting exit light fixtures with backup battery and exterior remote heads to an unswitched hot conductor from lighting circuit L1-1, with circuit L1-3 retained for smoke detectors only. The document specifies that spray cellulose insulation is not acceptable for wall and attic insulation and provides detailed fabrication, installation, and quality control requirements for all cold-formed steel framing components, including tolerances, fastening methods, and field inspection procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2400000200_2_SO_FORM.PDF | ||
| Final_RFB_785_2400000200_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-107-24
FOR: FFA Cabin Renovations Phase 2 Department of Education Hardinsburg, Kentucky
DATE: November 7, 2023
RFB-785-2400000200
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-107-24 For: FFA Cabin Renovations Phase 2 Department of Education Hardinsburg, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Addendum 01
F F A – C A B I N R E N O V A T I O N S – P H A S E I I 111 FFA Camp Road, Hardinsburg, Kentucky, Breckinridge County Engineering File #: 540-CAlk-FF18-02 Request For Bid #: RFB-107-24
Addendum 01 Date: 07 November 2023
THE BIDDING AND GENERAL DOCUMENTS, NOTES, AND DRAWINGS ARE CLARIFIED OR CHANGED IN
ACCORDANCE WITH THE FOLLOWING. THE BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS
ADDENDUM ON THE PROPOSAL FORM IN THE SPACE PROVIDED.
ARCHITECTURAL I TEMS:
G E N E R A L A R C H I T E C T U R A L I T E M S :
A1.1 Clarification: All existing floor tiles and adhesive in all ten cabins contain asbestos materials and will be removed by the state per General Conditions Article, 11.3 Hazardous Materials. Please price the documents with the assumption that all asbestos containing material (existing flooring and adhesive) will be removed by others (NIC).
A1.2 Is there any lead paint existing in the cabins? Unknown. The existing ceiling is to be painted.
The painted block gets covered by new materials. All demo items have poly/shellac finish.
See General Conditions Article, 11.3 Hazardous Materials.
A1.3 Clarification: All cabins have attic access panels in the ceiling just inside and above the door. Below are pictures of the attic space that are consistent of all ten cabins. Assume existing roof rafters are at 24” O.C.
A1.4 What is the color on the Epoxy Floors? Standard gray, no flakes.
A1.5 What is the width of the Mow Strip? 18” wide
A1.6 Will wood blocking be required between the block and the metal siding @ the outdoor HVAC unit support angle to carry the unit weight? THE SUPPORTS ARE PER THE
MANUFACTURER’S RECEOMMENDATIONS AND ARE TYPICALLY SECURED TO THE STUCTURE.
Assume solid 2x wood blocking installed behind the metal panels to secure Mech equipment supports. GC to coordinate with Mech contractor for size and location of blocking.
A1.7 Pages 1, 5, & 6 are missing from the Specification 054000 – Cold-Formed Metal Framing.
See attached full 054000 Specification. Pages 5 & 6 are intentionally blank.
A1.8 Clarification: Wood Base Trim shall be 2x6.
A1.9 Clarification: Assume existing fascia board (NIC) is in good condition.
A1.10 Is there to be any Tyvek Building Wrap behind the ¾” rigid insulation board? Yes, at surface of existing wood sheathing.
A1.11 Does the existing interior wood T&G wall panels have furring behind them in which it will need to be removed to construct the new 2x4 framing for the new plywood wall panels?
There are currently only two horizontal 2x4 behind the T&G panels. One at the top (ceiling) and one at the T.O. the CMU wall. They can likely be used as part of the new wall framing.
A1.12 Would Spray Cellulose Insulation be Acceptable for the wall & attic Insulation? No.
MEP I TEMS:
G E N E R A L E L E C T R I C A L I T E M S :
A1.13 Clarification: There will be no new electrical feed installed routed to the cabin from the transformer source. The existing underground panelboard feed to the cabin from the transformer will be intercepted for transition to above grade. A new feed will be provided and installed from the new exterior 60A/2P fused disconnect switch to the new panelboard.
E L E C T R I C A L D R A W I N G I T E M S :
A1.14 Reference Drawing E-001: Electrical Contractor shall provide locking hasp with rivets for electrical panelboard.
A1.15 Reference Drawing E-001: Electrical Contractor shall provide padlocks with keys for interior electrical panelboard and exterior disconnects.
A1.16 Reference Drawing E-001: (Regarding Transformer Disconnect Switch Detail) – The existing underground panelboard feed to the cabin will be intercepted for transition via new elbow to above grade and reconnected to a new 60A/2P fused disconnect switch for the new panelboard.
A1.17 Reference Drawing E-001: Connect Exit Light Fixture X-1 with backup battery and exterior remote heads RH to an unswitched hot conductor from lighting circuit L1-1 (per General Notes 3 and 4). Circuit L1-3 shall be retained for smoke detector only.
A1.18 Reference Drawing E.1: Revise Keynote #3 to indicate “Electrical Contractor” shall provide locking hasp with rivets on electrical panelboard.
A1.19 Reference Drawing E.1: Revise Keynotes #2, #3, and #4 to indicate “Electrical Contractor” shall provide padlocks with keys for interior electrical panelboard and exterior disconnects.
A1.20 Reference Drawing E.1: Revise Demolition Keynote #3 - Change “Panelboard feed shall remain for reconnection to new recessed panelboard at rear of building” to “Panelboard feed shall remain for reconnection to new 60A/2P fused disconnect switch.
A1.21 Reference Drawing E.1: Revise Demolition Keynote #3 – Add to note, “Pull existing feeder back through existing conduit as needed for reconnection”.
A1.22 Reference Drawing E.1: Revise Transformer Disconnect Switch Detail note from “60A Disconnect Switch” to “60A/2P Fused Disconnect Switch”.
A1.23 Reference Drawing E.1: Revise Transformer Disconnect Switch Detail note “Intercept feed from existing transformer at grade with pullbox” to “Intercept existing underground conduit and add elbow for transition to above grade. Re-pull existing feeder to new disconnect switch through existing and new conduit”.
A1.24 Reference Drawing E.1: Revise drawing to indicate Exit Light fixture X-1 with backup battery and exterior remote heads RH connected to an unswitched hot conductor from Circuit L1-1 in lieu of Circuit L1-3. Circuit L1-3 shall be retained for smoke detector only.
A1.25 Reference Drawing E.1: Delete General Note #5.
E N D O F A D D E N D U M 0 1
FFA – CABIN RENOVATIONS – PHASE II Hardinsburg, Kentucky 540-CALK-FF18-02
COLD-FORMED METAL FRAMING 054000-1
SECTION 054000 - COLD-FORMED METAL FRAMING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Exterior non-load-bearing Z-Furring Channel
2. Exterior non-load-bearing U-Channels (cold-rolled channel).
B. Related Sections:
1. Section 04 81 00 "Unit Masonry".
2. Section 07 42 13 "Formed Metal Wall & Roof Panels".
3. Section 09 22 16 "Non-Structural Metal Framing" for interior non-load-bearing, metal-stud framing and ceiling-suspension assemblies.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of cold-formed steel framing product and accessory.
B. Shop Drawings:
1. Include layout, spacings, sizes, thicknesses, and types of cold-formed steel framing; fabrication; and fastening and anchorage details, including mechanical fasteners.
2. Indicate reinforcing channels, opening framing, supplemental framing, strapping, bracing, bridging, splices, accessories, connection details, and attachment to adjoining work.
C. Delegated-Design Submittal: For cold-formed steel framing.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing agency.
B. Welding certificates.
COLD-FORMED METAL FRAMING 054000-2
C. Product Test Reports: For each listed product, for tests performed by manufacturer and witnessed by a qualified testing agency.
1. Steel sheet.
2. Expansion anchors.
3. Mechanical fasteners.
4. Vertical deflection clips.
5. Horizontal drift deflection clips
6. Miscellaneous structural clips and accessories.
D. Research Reports: For non-standard cold-formed steel framing, from ICC-ES.
1.6 QUALITY ASSURANCE
A. Testing Agency Qualifications: Qualified according to ASTM E 329 for testing indicated.
B. Product Tests: Mill certificates or data from a qualified independent testing agency, or in-house testing with calibrated test equipment indicating steel sheet complies with requirements, including base-metal thickness, yield strength, tensile strength, total elongation, chemical requirements, and metallic-coating thickness.
C. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
2. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel."
D. Comply with AISI S230 "Standard for Cold-Formed Steel Framing - Prescriptive Method for
One and Two Family Dwellings."
1.7 DELIVERY, STORAGE, AND HANDLING
A. Protect cold-formed steel framing from corrosion, moisture staining, deformation, and other damage during delivery, storage, and handling.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. AllSteel & Gypsum Products, Inc.
2. ClarkDietrich Building Systems.
3. Nuconsteel, A Nucor Company.
2.2 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a qualified professional engineer, as defined in Section 01 40 00 "Quality Requirements," to design cold-formed steel framing.
http://www.specagent.com/Lookup?ulid=6242 http://www.specagent.com/Lookup?uid=123457002083 http://www.specagent.com/Lookup?uid=123457002104 http://www.specagent.com/Lookup?uid=123457002091
COLD-FORMED METAL FRAMING 054000-3
B. Structural Performance: Provide cold-formed steel framing capable of withstanding design loads within limits and under conditions indicated.
1. Design Loads: As indicated in the structural General Notes.
2. Deflection Limits: Design framing systems to withstand design loads without deflections greater than the following:
a. Exterior Non-Load-Bearing Framing:
1) Horizontal deflection of L/600 of the wall height where backing up masonry system.
3. Power-actuated anchor.
2) Horizontal deflection of L/360 of the wall height where backing up EIFS system.
4. Design framing systems to provide for movement of framing members located outside the insulated building envelope without damage or overstressing, sheathing failure, connection failure, undue strain on fasteners and anchors, or other detrimental effects when subject to a maximum ambient temperature change of 120 deg F.
5. Design framing system to maintain clearances at openings, to allow for construction tolerances, and to accommodate live load deflection of primary building structure as follows:
a. Upward and downward movement of 1/2 inch.
6. Design exterior non-load-bearing wall framing to accommodate horizontal deflection without regard for contribution of sheathing materials.
C. Cold-Formed Steel Framing Design Standards:
D.
1. Z-Furring Channel: AISI S100-12.
2. U-Channel: AISI S100-12.
E.
AISI Specifications and Standards: Unless more stringent requirements are indicated, comply with AISI S100 and AISI S200.
F. Fire-Resistance Ratings: Comply with ASTM E 119; testing by a qualified testing agency.
Identify products with appropriate markings of applicable testing agency.
1. Indicate design designations from UL's "Fire Resistance Directory" or from the listings of another qualified testing agency.
2.3
EXTERIOR NON-LOAD-BEARING WALL FURRING
A. 3/4" U-Channel / CRC - 16 GA: ASTM A 1003, exceed ASTM C955, Structural Grade, metallic coated, of grade and coating weight as follows:
1. U-Channel: 075U50-54 (50ksi)
2. Coating: G90
3. Use with ¾” rigid insulation at wood sheathing/framing portion of the cabin wall and at the jambs of windows and doors.
B. 1-1/2" U-Channel / CRC - 16 GA: ASTM A 1003, exceed ASTM C955, Structural Grade, metallic coated, of grade and coating weight as follows:
1. U-Channel: 150U50-54 (50ksi)
2. Coating: G90
COLD-FORMED METAL FRAMING 054000-4
3. Use with 1 ½” rigid insulation at CMU portion of the cabin wall at jamb of door.
C. 1-1/2" Z-Furring Channel / CRC - 20 GA: ASTM A 1003, exceed ASTM C955, Structural Grade, metallic coated, of grade and coating weight as follows:
1. Z-Furring Channel: 150DZF-33 (33ksi)
2. Coating: G90
3. Use with 1 ½” rigid insulation at CMU portion of the cabin wall.
3. Provide 1/4" diameter fasteners into existing CMU at 16" O.C. horizontal & staggered top/bottom.
D.
Drift Clips: Manufacturer's standard bypass or head clips, capable of isolating wall stud from upward and downward vertical displacement and lateral drift of primary structure through positive mechanical attachment to stud web and structure.
COLD-FORMED METAL FRAMING 054000-5
COLD-FORMED METAL FRAMING 054000-6
COLD-FORMED METAL FRAMING 054000-7
2.5 FRAMING ACCESSORIES
A. Fabricate steel-framing accessories from steel sheet, ASTM A 1003/A 1003M, Structural
Grade, Type H, metallic coated, of same grade and coating weight used for framing members.
B. Provide accessories of manufacturer's standard thickness and configuration, unless otherwise indicated, as follows:
1. Supplementary framing.
2. Bracing, bridging, and solid blocking.
3. Web stiffeners.
4. Anchor clips.
5. End clips.
6. Foundation clips.
7. Gusset plates.
8. Stud kickers and knee braces.
9. Joist hangers and end closures.
10. Hole reinforcing plates.
11. Backer plates.
2.6 ANCHORS, CLIPS, AND FASTENERS
A. Steel Shapes and Clips: ASTM A 36/A 36M, zinc coated by hot-dip process according to ASTM A 123/A 123M.
B. Anchor Bolts: ASTM F 1554, Grade 36, threaded carbon-steel hex-headed bolts and carbon-steel nuts; and flat, hardened-steel washers; zinc coated by hot-dip process according to ASTM A 153/A 153M, Class C.
C. Expansion Anchors: Fabricated from corrosion-resistant materials, with allowable load or strength design capacities calculated according to ICC-ES AC193 and ACI 318 greater than or equal to the design load, as determined by testing per ASTM E 488 conducted by a qualified testing agency.
D. Power-Actuated Anchors: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with allowable load capacities calculated according to ICC-ES AC70, greater than or equal to the design load, as determined by testing per ASTM E 1190 conducted by a qualified testing agency.
E. Mechanical Fasteners: ASTM C 1513, corrosion-resistant-coated, self-drilling, self-tapping, steel drill screws.
1. Head Type: Low-profile head beneath sheathing, manufacturer's standard elsewhere.
F. Welding Electrodes: Comply with AWS standards.
COLD-FORMED METAL FRAMING 054000-8
2.7 MISCELLANEOUS MATERIALS
A. Galvanizing Repair Paint: ASTM A 780.
B. Cement Grout: Portland cement, ASTM C 150, Type I; and clean, natural sand, ASTM C 404.
Mix at ratio of 1 part cement to 2-1/2 parts sand, by volume, with minimum water required for placement and hydration.
C. Nonmetallic, Nonshrink Grout: Premixed, nonmetallic, noncorrosive, nonstaining grout containing selected silica sands, portland cement, shrinkage-compensating agents, and plasticizing and water- reducing agents, complying with ASTM C 1107/C 1107M, with fluid consistency and 30-minute working time.
D. Shims: Load bearing, high-density multimonomer plastic, and nonleaching; or of cold-formed steel of same grade and coating as framing members supported by shims.
E. Sealer Gaskets: Closed-cell neoprene foam, 1/4 inch thick, selected from manufacturer's standard widths to match width of bottom track or rim track members.
2.8 FABRICATION
A. Fabricate cold-formed steel framing and accessories plumb, square, and true to line, and with connections securely fastened, according to referenced AISI's specifications and standards, manufacturer's written instructions, and requirements in this Section.
1. Fabricate framing assemblies using jigs or templates.
2. Cut framing members by sawing or shearing; do not torch cut.
3. Fasten cold-formed steel framing members by welding, screw fastening, clinch fastening, pneumatic pin fastening, or riveting as standard with fabricator. Wire tying of framing members is not permitted.
a. Comply with AWS D1.3/D1.3M requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work.
b. Locate mechanical fasteners and install according to Shop Drawings, with screw penetrating joined members by no fewer than three exposed screw threads.
4. Fasten other materials to cold-formed steel framing by welding, bolting, pneumatic pin fastening, or screw fastening, according to Shop Drawings.
B. Reinforce, stiffen, and brace framing assemblies to withstand handling, delivery, and erection stresses. Lift fabricated assemblies to prevent damage or permanent distortion.
C. Fabrication Tolerances: Fabricate assemblies level, plumb, and true to line to a maximum allowable tolerance variation of 1/8 inch in 10 feet and as follows:
1. Spacing: Space individual framing members no more than plus or minus 1/8 inch from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials.
2. Squareness: Fabricate each cold-formed steel framing assembly to a maximum out-of-square tolerance of 1/8 inch.
COLD-FORMED METAL FRAMING 054000-9
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine supporting substrates and abutting structural framing for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Before sprayed fire-resistive materials are applied, attach continuous angles, supplementary framing, or tracks to structural members indicated to receive sprayed fire-resistive materials.
B. After applying sprayed fire-resistive materials, remove only as much of these materials as needed to complete installation of cold-formed framing without reducing thickness of fire-resistive materials below that are required to obtain fire-resistance rating indicated. Protect remaining fire-resistive materials from damage.
C. Install load bearing shims or grout between the underside of load-bearing wall bottom track and the top of foundation wall or slab at locations with a gap larger than 1/4 inch to ensure a uniform bearing surface on supporting concrete or masonry construction.
D. Install sealer gaskets at the underside of wall bottom track or rim track and at the top of foundation wall or slab at stud or joist locations.
3.3 INSTALLATION, GENERAL
A. Cold-formed steel framing may be shop or field fabricated for installation, or it may be field assembled.
B. Install cold-formed steel framing according to AISI S200 and to manufacturer's written instructions unless more stringent requirements are indicated.
C. Install shop- or field-fabricated, cold-formed framing and securely anchor to supporting structure.
1. Screw, bolt, or weld wall panels at horizontal and vertical junctures to produce flush, even, true-to-line joints with maximum variation in plane and true position between fabricated panels not exceeding 1/16 inch.
D. Install cold-formed steel framing and accessories plumb, square, and true to line, and with connections securely fastened.
1. Cut framing members by sawing or shearing; do not torch cut.
2. Fasten cold-formed steel framing members by welding, screw fastening, clinch fastening, or riveting. Wire tying of framing members is not permitted.
a. Comply with AWS D1.3/D1.3M requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work.
COLD-FORMED METAL FRAMING 054000-10
b. Locate mechanical fasteners and install according to Shop Drawings, and complying with requirements for spacing, edge distances, and screw penetration.
E. Install framing members in one-piece lengths unless splice connections are indicated for track or tension members.
COLD-FORMED METAL FRAMING 054000-11
F. Install temporary bracing and supports to secure framing and support loads comparable in intensity to those for which structure was designed. Maintain braces and supports in place, undisturbed, until entire integrated supporting structure has been completed and permanent connections to framing are secured.
G. Do not bridge building expansion joints with cold-formed steel framing. Independently frame both sides of joints.
H. Install insulation, specified in Section 07 21 00 "Thermal Insulation," in built-up exterior framing members, such as headers, sills, boxed joists, and multiple studs at openings, that are inaccessible on completion of framing work.
I. Fasten hole reinforcing plate over web penetrations that exceed size of manufacturer's approved or standard punched openings.
J. Erection Tolerances: Install cold-formed steel framing level, plumb, and true to line to a maximum allowable tolerance variation of 1/8 inch in 10 feet and as follows:
1. Space individual framing members no more than plus or minus 1/8 inch from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials.
3.4 EXTERIOR NON-LOAD-BEARING WALL INSTALLATION
A. Install continuous tracks sized to match studs. Align tracks accurately and securely anchor to supporting structure as indicated.
B. Fasten both flanges of channels, top and bottom staggered at 16" O.C. Space furring and framing as follows:
1. Hat Channel Spacing: 48" O.C. vertical. Hat Channels run horizontal
2. U-Channel Spacing: 24" O.C. hoizontal. U-Channels run vertical.
C. Isolate non-load-bearing steel framing from building structure to prevent transfer of vertical loads while providing lateral support.
1. Install slotted deflection tracks and anchor track to building structure.
2. Connect vertical deflection clips to bypassing studs and anchor to building structure.
3. Connect drift clips to cold-formed metal framing and anchor to building structure.
D. Install horizontal bridging in wall studs, spaced vertically in rows indicated on Shop Drawings but not more than 48 inches apart. Fasten at each stud intersection.
1. Top Bridging for Single Deflection Track: Install row of horizontal bridging within 18 inches of single deflection track. Install a combination of bridging and stud or stud-track solid blocking of width and thickness matching studs, secured to stud webs or flanges.
a. Install solid blocking at centers indicated on Shop Drawings.
2. Bridging: Cold-rolled steel channel, welded or mechanically fastened to webs of punched studs.
3. Bridging: Combination of flat, taut, steel sheet straps of width and thickness indicated and stud-track solid blocking of width and thickness to match studs. Fasten flat straps to stud flanges and secure solid blocking to stud webs or flanges.
4. Bridging: Proprietary bridging bars installed according to manufacturer's written
COLD-FORMED METAL FRAMING 054000-12
instructions.
E. Install miscellaneous framing and connections, including stud kickers, web stiffeners, clip angles, continuous angles, anchors, and fasteners, to provide a complete and stable wall-framing system.
COLD-FORMED METAL FRAMING 054000-13
3.5 FIELD QUALITY CONTROL
A. Testing: Engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Field and shop welds will be subject to testing and inspecting.
C. Testing agency will report test results promptly and in writing to Contractor and Architect.
D. Remove and replace work where test results indicate that it does not comply with specified requirements.
E. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
3.6 REPAIRS AND PROTECTION
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold-formed steel framing with galvanized repair paint according to ASTM A 780 and manufacturer's written instructions.
B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensure that cold-formed steel framing is without damage or deterioration at time of Substantial Completion.
END OF SECTION 054000
| Addendum One |
| ADDENDUM_01 - FFA - Cabin Renovations - PII |
| FFA – CABIN RENOVATIONS – PHASE II |
| ARCHITECTURAL ITEMS: |
| GENERAL ARCHITECTURAL ITEMS: |
| MEP ITEMS: |
| GENERAL ELECTRICAL ITEMS: |
| ELECTRICAL DRAWING ITEMS: |
| END OF ADDENDUM 01 |
| 01-054000 - COLD-FORMED METAL FRAMING.pdf |