This is an Invitation to Bid (RFB-90-26) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for Security Upgrade-Door Modifications at the Adair Regional Detention Center, Department of Juvenile Justice in Columbia, Kentucky. The project involves modifying doors across multiple wings (West, East, and Intake) of the detention center, including installing new lockable pass-through slots, integrating trays, and replacing or modifying existing doors and hardware. The bid opening was originally scheduled and then moved to October 21, 2025, at 1:30 P.M. Eastern Time. The project has a substantial completion timeline of 310 calendar days (10 months) from the contract execution date, with additional days allocated for shop drawing submittals and material ordering.

The project scope includes specific door modifications across cell blocks, with most existing doors remaining in place and receiving upgrades like new food pass slots. Work hours are restricted to Monday-Friday, 8am to 5pm, with entire dormitory units being made available to the contractor and no residents present during work hours. Painting of food passes, doors, and other elements will be performed by the owner and is not part of the contractor's scope. The project includes detailed specifications for door elevations, hardware sets, and installation requirements, with careful attention to maintaining existing frames, glazing, and other architectural elements. Contractors are required to verify existing door dimensions in the field and ensure new doors are compatible with existing frames and hardware.

View the file

Other files

File Type Posted
Final_RFB_785_2600000154_1_SO_FORM.PDF PDF
Final_RFB_785_2600000154_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-90-26

FOR: Security Upgrade-Door Modifications Adair Regional Detention Center Department of Juvenile Justice Columbia, Kentucky

DATE: October 10, 2025

RFB-785-2600000154

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

Item 2: Official Bid Opening has been moved to October 21, 2025, at 1:30 P.M. Eastern Time

END OF ADDENDUM

Invitation to Bid No. RFB-90-26 For: Security Upgrade-Door Modifications Adair Regional Detention Center Department of Juvenile Justice Columbia, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

ADDENDUM #01 Date: 09 October 2025

KENTUCKY DEPARTMENT OF JUVENILE JUSTICE

Security Upgrades- Door Modifications Adair Regional Detention Center 401 Appleby Drive, Columbia KY

Architect’s Project No: 2553

TO: ALL BIDDERS AND PROSPECTIVE BIDDERS

The following changes in, additions to, or deletions from the Drawings and Specifications of the above-named project shall be a part of the Contract. Each bidder shall govern himself or herself accordingly in the preparation of his or her proposal.

RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED ON YOUR BID FORM

1. GENERAL INFORMATION:

a. “Phase” in drawing title block shall be updated to read “RTA”.

b. Attached is the sign-in sheet from the on-site meeting on 07 October 2025.

c. All existing doors to remain that are receiving new food pass slots may remain in place on their hinges for installation.

2. WORK SCHEDULE:

a. Work hours shall be Monday-Friday 8am to 5pm.

b. An entire dormitory unit shall be available at a time to the contractor- no residents will be present during work hours in a unit where work is taking place. Contractor shall ensure work in progress on all doors in a work area is completed by end of day for resident cell occupancy from 5pm-8am weekdays and on weekends.

c. All painting of food passes, doors, etc. is by owner and not in contract. Painting will not be performed during the contractor’s project schedule.

3. PROJECT SCHEDULE:

a. Revise as follows:

i. Substantial completion shall be 310 calendar days or 10 months from date of execution of contract. Additional days have been added for shop drawing submittals and ordering of materials prior to the start of construction.

4. DRAWING CLARIFICATIONS:

a. Drawing D101: Delete drawing D101 “Dormitory Plans- Demolition” dated 08-15-2025, replace with revised drawing D101 “Dormitory Plans- Demolition” dated 10-09-2025, Addendum 1 (attached).

b. Drawing A001: Delete drawing A001 “Site Plan- Staging” dated 08-15-2025, replace with revised drawing A001 “Site Plan- Staging” dated 10-09-2025, Addendum 1 (attached).

c. Drawing A102: Delete drawing A102 “Intake Plans- Demo/ New Work” dated 08-15-2025, replace with revised drawing A102 “Intake Plans- Demo/ New Work” dated 10-09-2025, Addendum 1 (attached).

d. Drawing A800: Delete drawing A800 “Door Schedules/ Details” dated 08-15-2025, replace with revised drawing A800 “Door Schedules/ Details” dated 10-09-2025, Addendum 1 (attached).

5. SPECIFICATION CLARIFICATIONS:

a. Specification Section 024116:

i. “Selective Demolition”, section 024116.1.4.8.2: Delete the requirement for contractor to employ a certified exterminator for the project. This work is not required.

b. Specification Section 111930:

i. “Security Glass and Glazing”, section 111930.2.03: Delete references to glazing type SG-2; SG-1 is the only glazing type in this project. Refer to revised drawing A800 “Door Schedules/ Details” dated 10-09-2025, Addendum 1 (attached).

c. Specification Section 111920: “Security Hardware”

i. Section 111920.1.06 - Maintenance: Delete this section in its entirety and replace with the following:

1.06 MAINTENANCE

A. Provide spares in the quantities listed below for each hardware type:

1. Locks: Two (2) of each type used (one (1) left hand, one (1) right hand.

2. Hinges: Six (6) of each type used.

3. Pulls:

a. Door Pull: Four (4) of each type used.

b. Flush Pull: Four (4) of each type used.

4. Food Pass Hardware: Three (3) food pass door sets complete with all hardware:

a. 1 ea - Lock

b. 2 ea - Hinges

c. 1 ea - Pass door with integral pull

d. 1 ea - Rubber bumper

5. Fasteners and Accessories:

a. Furnish five percent (5%) extra fasteners and other miscellaneous accessories required for installation.

ii. Section 11920.2.10 - Door and Hardware Schedule:

1. Hardware set DHW-2 (Shower Doors): Delete lockset “SS 1010AMD-N-K1”, replace with lockset “SS 1010-M-K1”.

6. RESPONSES TO SPECIFIC QUESTIONS:

a. There is only one door type on this project (for both dorm units and showers) as shown “Typ.

Door Elevations” on drawing A800. Refer to revised drawing A800 “Door Schedules/ Details” dated 10-09-2025, Addendum 1 (attached).

b. Intake holding room doors 244, 245 and 246 shall be new doors with new hardware installed into existing frames.

c. Doors W207, W208, W209 and W210 shall be new doors with new hardware installed into existing frames.

d. Doors W201, W202, and W204 are existing to remain.

e. Door hardware set DHW-3 is not used.

f. Door dimensions provided on drawing A800 are existing dimensions per original drawings;

Contractor shall verify existing door dimensions in field, and verify that new doors are fabricated for use in existing frames with regards to hardware, dimension, etc.- refer to drawings, specifications.

END OF ADDENDUM 1- ATTACHMENTS FOLLOW:

MISCELLANEOUS:

Sign-in sheet from on-site meeting dated 07 October 2025

DRAWINGS:

A001 SITE PLAN- STAGING 10-09-25 (Addendum 01) D101 DORMITORY PLANS- DEMOLITION 10-09-25 (Addendum 01) A102 INTAKE PLANS- DEMO/ NEW WORK 10-09-25 (Addendum 01) A800 DOOR SCHEDULES/ DETAILS 10-09-25 (Addendum 01)

Project Name: DJJ Adair Regional Detention Center Project Number: 2553 Meeting Date: 07 Oct 2025

Name Company Phone Email Address

Cheryl Kersey Kersey and Kersey Architects 502-583-0094

Cell: 502-767-4844 CKersey@KerseyandKersey.com

Jim Mayfield Cornerstone Inc. Cell: 256-501-0648 JMayfield@CornerstoneInc.com

Roberta McCann DJJ 502-229-2220 robertaa.mccann@ky.gov

Tony Yates DECA 502-229-9759 Tony.Yates@ky.gov

W312

W310

W309B

W309

W301

W302

W301B

W308 W303

W307B W303B

W307 W304

W306 W305

W306B W305B

W300

W412

W401

W401B

W402

W410

W409

W409B

W403W408

W403BW407B

W404W407

W405W406

W405BW406B

W400

W212

W210

W209

W201

W202

W208W203

W207W204

W206W205

W200

W209BW201B

W207BW203B

W206BW205B

W112

W101

W102

W110

W109

W103 W108

W104 W107

W105 W106

W100

W101B W109B

W103B W107B

W105B W106B

1 2

W105

CELL

W105B

P CHASE

W104

CELL

W103

CELL

W102

CELL

W101

CELL

W103B

P CHASE

W101B

P CHASE

W112

SHOWER

W112B

P CHASE

W106B

P CHASE

W107B

P CHASE

W109B

P CHASE

W106

CELL

W107

CELL

W108

CELL

W109

CELL

W110

CELL

W111

YOUTH WORKERS

W206

CELL

W206B

P CHASE

W207

CELL

W208

CELL

W209

CELL

W210

CELL

W207B

P CHASE

W209B

P CHASE

W212

SHOWER

W205B

P CHASE

W203B

P CHASE

W201B

P CHASE

W205

CELL

W204

CELL

W203

CELL

W202

CELL

W201

CELL

W211

YOUTH WORKERS

W312

SHOWER

W312B

P CHASE

W310

CELL

W309

CELL

W308

CELL

W307

CELL

W306

CELL

W309B

P CHASE

W307B

P CHASE

W306B

P CHASE

W301

CELL

W302

CELL

W303

CELL

W304

CELL

W305

CELL

W301B

P CHASE

W303B

P CHASE

W305B

P CHASE

W311

YOUTH WORKERS

W412

SHOWER

W401

CELL

W402

CELL

W403

CELL

W404

CELL

W405

CELL

W401B

P CHASE

W403B

P CHASE

W405B

P CHASE

W410

CELL

W409

CELL

W408

CELL

W407

CELL

W406

CELL

W409B

P CHASE

W407B

P CHASE

W406B

P CHASE

W411

YOUTH WORKERS

W100

DAYROOM 100

WEST

W200

DAYROOM 200

WEST

W300

DAYROOM 300

WEST

W400

DAYROOM 400

WEST

W500

CORRIDOR WEST

W212B

P CHASE

W412B

P CHASE11

W500A

W500B

1 1

E105

CELL

E104

CELL

E103

CELL

E102

CELL

E101

CELL

E112

SHOWER

E106

CELL

E107

CELL

E108

CELL

E109

CELL

E110

CELL

E111

YOUTH WORKERS

E206

CELL

E207

CELL

E208

CELL

E209

CELL

E210

CELL

E205

CELL

E204

CELL

E203

CELL

E202

CELL

E201

CELL

E211

YOUTH WORKERS

E312

SHOWER

E310

CELL

E309

CELL

E308

CELL

E307

CELL

E306

CELL

E301

CELL

E302

CELL

E303

CELL

E304

CELL

E305

CELL

E311

YOUTH WORKERS

E401

CELL

E402

CELL

E403

CELL

E404

CELL

E405

CELL

E410

CELL

E409

CELL

E408

CELL

E407

CELL

E406

CELL

E411

YOUTH WORKERS

E500

CORRIDOR EAST

E412

E401

E401B

E402

E410

E409

E409B

E403E408

E403BE407B

E404E407

E405E406

E405BE406B

E400

E312

E310

E309B

E309

E301

E302

E301B

E308 E303

E307B E303B

E307 E304

E306 E305

E306B E305B

E300

E112

E101

E102

E110

E109

E103 E108

E104 E107

E105 E106

E100

E101B E109B

E103B E107B

E105B E106B

E212

E210

E209

E201

E202

E208E203

E207E204

E206E205

E200

E209BE201B

E207BE203B

E206BE205B

E206B

P CHASE

E207B

P CHASE

E209B

P CHASE

E205B

P CHASE

E203B

P CHASE

E201B

P CHASE

E105B

P CHASE

E103B

P CHASE

E101B

P CHASE

E106B

P CHASE

E107B

P CHASE

E109B

P CHASE

E401B

P CHASE

E403B

P CHASE

E405B

P CHASE

E409B

P CHASE

E407B

P CHASE

E406B

P CHASE

E309B

P CHASE

E307B

P CHASE

E306B

P CHASE

E301B

P CHASE

E303B

P CHASE

E305B

P CHASE

E200

DAYROOM 200

EAST

E100

DAYROOM 100

EAST

E400

DAYROOM 400

EAST

E300

DAYROOM 300

EAST

E212

SHOWER

E212B

P CHASE

E412

SHOWER

E412B

P CHASE

E112B

P CHASE

E312B

P CHASE 11

1 1

E500A

E500B

ARCHITECTSK E R S E Y A N D K E R S E Y

RTA DATE

DECA LOG #

A&E FILE NO.

CHECKED BY

DRAWN BY

DRAWING DATE

DRAWING INFORMATION

DRAWING NO.

AS BUILT DATE

PHASE

DATEDESCRIPTION OF REVISIONS

REVISION HISTORY OF THIS DRAWING

DATEDESCRIPTION OF REVISIONS

FRANKFORT, KENTUCKY

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

COMMONWEALTH OF KENTUCKY

ACCOUNT NO.

kerseyandkersey.com

Tel 502 583 0094 Tel 812 873 1287Tel 859 303 8439

LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA

SECURITY UPGRADES - DOOR MODIFICATIONS

ADAIR REGIONAL DETENTION CENTER

/8 /2

:1 :0

P

M

D101

DORMITORY PLANS - DEMOLITION

08-15-2025

RTA

08-15-2025

MM/DD/YR

523-CB07-SW14-00

AMS

CCK

DEMOLITION KEYNOTES

1. PREPARE EXISTING DOOR FOR INSTALLATION OF NEW

LOCKABLE PASS-THRU SLOT W/ INTEGRATED TRAY PER MANUF.

RECOMMENDATIONS, TYP. DOOR MAY REMAIN IN PLACE DURING

INSTALLATION. EXISTING DOOR, FRAME, HARDWARE, VISION

LITES, SIDELIGHT(S), TRANSOM(S), ETC. ARE EXISTING TO

REMAIN- PROTECT, TYP. REFER TO DOOR SCHEDULE RE:

COMPLETE SCOPE OF WORK.

2. REMOVE EXISTING DOOR AND HARDWARE COMPLETE. EXISTING

FRAME TO REMAIN- PROTECT, TYP. PREP EXST. FRAME TO

RECIEVE NEW DOOR AND HARDWARE. REFER TO DOOR

SCHEDULE RE: COMPLETE SCOPE OF WORK.

PROJECT

NORTH

POLAR

NORTH

1/8" = 1'-0" D101

1DEMOLITION PLAN WEST WING

1/8" = 1'-0" D101

2DEMOLITION PLAN EAST WING

ADDENDUM 01 10-09-25

STAGING FOR

WEST WING/

INTAKE WORK

BUILDING

ENTRANCE FOR

W

EST W

ING/

INTAKE W

ORK

STAGING FOR

EAST WING WORK

BUILDING

ENTRANCE FO

R

EAST W

ING W

ORK

STAGING/ ACCESS NOTES:

1. POTENTIAL STAGING LOCATIONS SHOWN ARE FOR REFERENCE

ONLY; ALL FINAL ON-SITE STAGING SHALL BE COORDINATED

WITH THE OWNER, TYP.

2. COORD. FACILITY ACCESS PROCEDURE(S) WITH OWNER AND

ARCHITECT- REFER TO SPECS, TYP.

ARCHITECTSK E R S E Y A N D K E R S E Y

RTA DATE

DECA LOG #

A&E FILE NO.

CHECKED BY

DRAWN BY

DRAWING DATE

DRAWING INFORMATION

DRAWING NO.

AS BUILT DATE

PHASE

DATEDESCRIPTION OF REVISIONS

REVISION HISTORY OF THIS DRAWING

DATEDESCRIPTION OF REVISIONS

FRANKFORT, KENTUCKY

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

COMMONWEALTH OF KENTUCKY

ACCOUNT NO.

kerseyandkersey.com

Tel 502 583 0094 Tel 812 873 1287Tel 859 303 8439

LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA

SECURITY UPGRADES - DOOR MODIFICATIONS

ADAIR REGIONAL DETENTION CENTER

/8 /2

:1 :0

P

M

A001

SITE PLAN - STAGING

08-15-2025

RTA

08-15-2025

MM/DD/YR

523-CB07-SW14-00

AMS

CCK

1" = 40'-0" A001

1STAGING/ ACCESS PLAN (REFERENCE ONLY)

JANITOR

LAUNDRY

EXAM

EXAM

INTAKE

DENTAL EXAM

PROG. DIR.

SUPR.

STORAGE

244 245 246

253A

CONTROL

SHOWERS

SHOWERS

SHAKEDOWN

OFFICE

OFFICE

STOR

CONF ROOM

JAN

TLT

TLT

TOILET

INTERVIEW

VESTIBULE

MED OFFICE

CELL

CELL

CELL

STORAGE

SHOWER

OFFICE

DRY STORAGE

233A

OFFICE

LOCKER ROOM

MED RECORDS

VEST

CORRIDOR

100A

CORR

100B

N1

N1

N1

CONTROL

VESTIBULE

SHAKEDOWN

OFFICE 216

OFFICE

STORAGE

COPY

TOILET

TOILET

JANITORIAL

SHOWER

SHOWER

OFFICE

233A

DRY STOR.

OFFICE

STORAGE

JANITOR

INTERVIEW

LAUNDRY

SHOWER

TOILET

STOR.

CELL

CELL

CELL

EXAM

EXAM

INTAKE

MED RECORDS

DENTAL EXAM

PROG. DIR.

VESTIBULE

STORAGE

MED OFFICE

100B

CORRIDOR

100C

CORRIDOR

D2

D2

D2

244 245 246

ARCHITECTSK E R S E Y A N D K E R S E Y

RTA DATE

DECA LOG #

A&E FILE NO.

CHECKED BY

DRAWN BY

DRAWING DATE

DRAWING INFORMATION

DRAWING NO.

AS BUILT DATE

PHASE

DATEDESCRIPTION OF REVISIONS

REVISION HISTORY OF THIS DRAWING

DATEDESCRIPTION OF REVISIONS

FRANKFORT, KENTUCKY

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

COMMONWEALTH OF KENTUCKY

ACCOUNT NO.

kerseyandkersey.com

Tel 502 583 0094 Tel 812 873 1287Tel 859 303 8439

LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA

SECURITY UPGRADES - DOOR MODIFICATIONS

ADAIR REGIONAL DETENTION CENTER

/8 /2

:1 :1

P

M

A102

INTAKE PLANS - DEMO/ NEW WORK

08-15-2025

RTA

08-15-2025

MM/DD/YR

523-CB07-SW14-00

AMS

CCK

1/8" = 1'-0" A102

2INTAKE FLOOR PLAN - NEW WORK

1/8" = 1'-0" A102

1INTAKE FLOOR PLAN - DEMOLITION

KEYNOTES - NEW WORK

1. THIS DOOR IS IN SCOPE OF WORK- REFER TO DOOR

SCHEDULE FOR FULL SCOPE OF WORK FOR EACH INDIVIDUAL

DOOR, TYP.

N#

DEMOLITION KEYNOTES

1. PREPARE EXISTING DOOR FOR INSTALLATION OF NEW

LOCKABLE PASS-THRU SLOT W/ INTEGRATED TRAY PER MANUF.

RECOMMENDATIONS, TYP. DOOR MAY REMAIN IN PLACE DURING

INSTALLATION. EXISTING DOOR, FRAME, HARDWARE, VISION

LITES, SIDELIGHT(S), TRANSOM(S), ETC. ARE EXISTING TO

REMAIN- PROTECT, TYP. REFER TO DOOR SCHEDULE RE:

COMPLETE SCOPE OF WORK.

2. REMOVE EXISTING DOOR AND HARDWARE COMPLETE. EXISTING

FRAME TO REMAIN- PROTECT, TYP. PREP EXST. FRAME TO

RECIEVE NEW DOOR AND HARDWARE. REFER TO DOOR

SCHEDULE RE: COMPLETE SCOPE OF WORK.

D#

PROJECT

NORTH

POLAR

NORTH

1 1

DETENTION HOLLOW

METAL DOOR- NEW

DOORS, MATCH EXST.

DHM TO REMAIN, TYP.

INTEGRATED SECURITY-GRADE

VIEW WINDOW- NEW DOORS,

MATCH EXST. GLAZING

DIMENSIONS, REFER TO

SCHEDULE RE: GLAZING TYPE.

COORD. W/ DOOR MANUF. TYP.

DETAILS

NEW LOCKABLE PASS-THRU

SLOT W/ INTEGRATED TRAY-

INSTALL NEW TRAY SLOT

INTO EXST. DHM PER

MANUFACTURER'S

RECOMMENDATIONS, TYP.

M A

T C

H E

X S

T D

O O

R D

IM

E

N S

IO

N

S

V .I .F

T

Y P

MATCH EXST. DOOR

WIDTH- V.I.F. TYP.

A

TYP. DOOR ELEVATIONS

A1: EXISTING TYPE A DOOR IN EXST. FRAME

A2: NEW TYPE A DOOR IN EXST. FRAME

P E

R D

O O

R S

C H

E D

PER DOOR SCHED.

PER DOOR SCHED.

P E

R D

O O

R S

C H

E D

EXISTING HM

FRAME W/

INTEGRATED

TRANSOM

TO REMAIN-

PROTECT,

TYP.

GLAZING IN

EXST.

TRANSOM

TO REMAIN-

PROTECT,

TYP.

V .I .F

T

Y P

CBA

EXISTING FRAME TO

REMAIN- PROTECT, TYP.

2" 2"

2" HINGE JAMB

TYP. FRAME ELEVATIONS

V.I.F.

1' - 0"

EXISTING FRAME TO

REMAIN- PROTECT, TYP.

EXISTING FRAME TO

REMAIN- PROTECT, TYP.

V.I.F.

1' - 0"

P E

R D

O O

R S

C H

E D

PER DOOR SCHED.

2" HINGE JAMB

DOOR NO. NAME

DOOR SCHEDULE - DORMITORY WEST (SCOPE OF WORK)

FINISH NOTES

W101

HARDWAREROOM NO.

W101

DIMENSIONS

3'-0"W x 7'-0"H x 2"D

DOOR

ELEV

FRAME

ELEV

GLAZING

TYPE

A1 A EXST. TO REMAINCELL EXST. TO REMAIN 1

W102 W102 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W103 W103 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W104 W104 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W105 W105 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W106 W106 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W107 W107 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W108 W108 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W109 W109 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W110 W110 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W112 W112 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

W201 W201 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W202 W202 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W203 W203 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W204 W204 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W205 W205 3'-0"W x 7'-0"H x 2"DCELL

W206 W206 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W207 W207 3'-0"W x 7'-0"H x 2"D SG-1CELL DWH-1 2

W208 W208 3'-0"W x 7'-0"H x 2"DCELL

W209 W209 3'-0"W x 7'-0"H x 2"D SG-1CELL DWH-1 2

W210 W210 3'-0"W x 7'-0"H x 2"D SG-1CELL DWH-1 2

W212 W212 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

W301 W301 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W302 W302 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W303 W303 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W304 W304 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W305 W305 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W306 W306 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W307 W307 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W308 W308 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W309 W309 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W310 W310 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W312 W312 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

W401 W401 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W402 W402 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W403 W403 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W404 W404 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W405 W405 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W406 W406 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W407 W407 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W408 W408 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W409 W409 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W410 W410 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

W412 W412 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

A

A

B

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A2

A2

A2

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A2

A2

A2

A2

EXST. TO REMAIN EXST. TO REMAIN 1AA1

SG-1 DWH-1 2AA2

W100 W100 DAYROOM 3'-0"W x 7'-0"H x 2"D C PAINT (N.I.C.)

W200 W200 DAYROOM 3'-0"W x 7'-0"H x 2"D C

W300 W300 DAYROOM 3'-0"W x 7'-0"H x 2"D C

W400 W400 DAYROOM 3'-0"W x 7'-0"H x 2"D C

W500A W500 CORRIDOR 3'-0"W x 7'-0"H x 2"D A (SIM.)A1

W500B W500 CORRIDOR 3'-0"W x 7'-0"H x 2"D A (SIM.)A1

EXST. TO REMAIN

EXST. TO REMAIN

EXST. TO REMAIN 1

EXST. TO REMAIN 1

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

DOOR NO. NAME

DOOR SCHEDULE - DORMITORY EAST (SCOPE OF WORK)

FINISH NOTES

E101

HARDWAREROOM NO.

E101

DIMENSIONS

3'-0"W x 7'-0"H x 2"D

DOOR

ELEV

FRAME

ELEV

GLAZING

TYPE

A1 A EXST. TO REMAINCELL EXST. TO REMAIN 1

E102 E102 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E103 E103 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E104 E104 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E105 E105 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E106 E106 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E107 E107 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E108 E108 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E109 E109 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E110 E110 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E112 E112 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

E201 E201 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E202 E202 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E203 E203 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E204 E204 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E205 E205 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E206 E206 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E207 E207 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E208 E208 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E209 E209 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E210 E210 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E212 E212 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

E301 E301 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E302 E302 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E303 E303 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E304 E304 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E305 E305 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E306 E306 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E307 E307 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E308 E308 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E309 E309 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E310 E310 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E312 E312 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

E401 E401 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E402 E402 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E403 E403 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E404 E404 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E405 E405 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E406 E406 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E407 E407 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E408 E408 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E409 E409 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E410 E410 3'-0"W x 7'-0"H x 2"D EXST. TO REMAINCELL EXST. TO REMAIN 1

E412 E412 3'-0"W x 7'-0"H x 1-3/4"D SG-1SHOWER DHW-2 2

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A

A

A

A

B

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A2

A2

A2

A2

E100 E100 DAYROOM 3'-0"W x 7'-0"H x 2"D C PAINT (N.I.C.)

E200 E200 DAYROOM 3'-0"W x 7'-0"H x 2"D C

E300 E300 DAYROOM 3'-0"W x 7'-0"H x 2"D C

E400 E400 DAYROOM 3'-0"W x 7'-0"H x 2"D C

E500A

E500B

E500 CORRIDOR 3'-0"W x 7'-0"H x 2"D EXST. TO REMAIN EXST. TO REMAIN 1A (SIM.)A1

EXST. TO REMAIN EXST. TO REMAIN 1A1 A (SIM.)E500 CORRIDOR 3'-0"W x 7'-0"H x 2"D

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

PAINT (N.I.C.)

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

A1 EXST. TO REMAIN EXST. TO REMAIN 1

DOOR NO. NAME

DOOR SCHEDULE - INTAKE (SCOPE OF WORK)

FINISH NOTES

PAINT (N.I.C.)240

HARDWAREROOM NO.

DIMENSIONS

3'-0"W x 7'-0"H x 1-3/4"D

DOOR

ELEV

FRAME

ELEV

GLAZING

TYPE

A2 B SG-1SHOWER DHW-2 2

244 244 3'-0"W x 7'-0"H x 2"DCELL DHW-1 2

245 245 3'-0"W x 7'-0"H x 2"DCELL

246 246 3'-0"W x 7'-0"H x 2"DCELL

A2 C

C

C

PAINT (N.I.C.)

2A2 PAINT (N.I.C.)

2A2 PAINT (N.I.C.)

SG-1

SG-1

SG-1

DHW-1

DHW-1

DOOR SCHEDULE NOTES GENERAL NOTES

1. WHERE EXISTING DOORS ARE TO REMAIN, ALL EXISTING HARDWARE, GLAZING,

FRAMES, TRANSOMS, ETC. ARE ALSO EXISTING TO REMAIN- PROTECT, TYP.

2. WHERE EXISTING DOORS/ FRAMES TO REMAIN REQUIRE REPAIR, GRIND

RUSTED/ DAMAGED AREAS; PATCH/ REPAIR DAMAGE TO EXISTING DOORS WITH

NEW LIKE MATERIALS. GRIND ANY BURRS, WELDS, ETC. SMOOTH, TYP.

3. WHERE NEW DOORS ARE INSTALLED IN EXISTING FRAMES, ENSURE

COMPATIBILITY OF NEW DOORS WITH EXISTING FRAMES, HARDWARE,

OPERATORS, CONTROLLERS, ETC.- COORD. W/ ARCHITECT AND OWNER.

4. ALL PAINTING OF DOORS AND FRAMES SHALL BE BY OWNER; PAINTING IS NOT

IN SCOPE OF WORK, TYP. ALL.

5. WHERE DOORS REQUIRE INSTALLATION OF PADDING, PADDING INSTALLATION

SHALL BE BY OWNER AND IS NOT IN SCOPE.

6. DIMENSIONS SHOWN HERE ARE EXISTING DOOR AND FRAME DIMENSIONS PER

ORIGINAL DRAWINGS- CONTRACTOR SHALL VERIFY EXISTING DOOR

DIMENSIONS IN FIELD, AND VERIFY THAT NEW DOORS ARE FABRICATED FOR

USE IN EXISTING FRAMES WITH REGARDS TO HARDWARE, DIMENSION, ETC.-

REFER TO DRAWINGS, SPECIFICATIONS.

1. INSTALL NEW LOCKABLE PASS-THRU SLOT W/ INTEGRATED

TRAY INTO EXST. DHM PER MANUF. RECOMMENDATIONS, TYP.

DOOR MAY REMAIN IN PLACE DURING INSTALLATION. EXISTING

DOOR, FRAME, HARDWARE, VISION LITES, SIDELIGHT(S),

TRANSOM(S), ETC. ARE EXISTING TO REMAIN- PROTECT, TYP.

COORD. PHASING W/ OWNER AND ARCHITECT, TYP.

2. REMOVE EXISTING DOOR- EXISTING FRAME, SIDELIGHT(S),

TRANSOM(S), ETC. ARE EXISTING TO REMAIN- PROTECT, TYP.

INSTALL NEW DOOR AND HARDWARE IN EXISTING FRAME.

CONTRACTOR SHALL COORD. COMPATIBILITY OF NEW DOOR

HARDWARE W/ EXST. FRAME PRIOR TO DOOR PURCHASE.

REFER TO SPECS, DOOR TYPE(S), GENERAL NOTES THIS SHEET.

ARCHITECTSK E R S E Y A N D K E R S E Y

RTA DATE

DECA LOG #

A&E FILE NO.

CHECKED BY

DRAWN BY

DRAWING DATE

DRAWING INFORMATION

DRAWING NO.

AS BUILT DATE

PHASE

DATEDESCRIPTION OF REVISIONS

REVISION HISTORY OF THIS DRAWING

DATEDESCRIPTION OF REVISIONS

FRANKFORT, KENTUCKY

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

COMMONWEALTH OF KENTUCKY

ACCOUNT NO.

kerseyandkersey.com

Tel 502 583 0094 Tel 812 873 1287Tel 859 303 8439

LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA

SECURITY UPGRADES - DOOR MODIFICATIONS

ADAIR REGIONAL DETENTION CENTER

/8 /2

:1 :1

P

M

A800

DOOR SCHEDULES/ DETAILS

08-15-2025

RTA

08-15-2025

MM/DD/YR

523-CB07-SW14-00

AMS

CCK

Addenum One
2553_Addendum-01_w-attachments_2025-10-09