This document is Addendum No. One for an Underground Electric project at the Wendell H. Ford Regional Training Center for the Kentucky Department of Military Affairs, issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration. The addendum provides critical updates and clarifications for the RFB-07-26 invitation to bid, including changes to specifications, drawings, and project requirements. Key modifications include obtaining highway crossing permits through Kentucky Utilities (KU), adding specifications for conduit installation, updating utility water availability, and addressing various technical details about underground electrical work, transformer installations, and site conditions.
The addendum includes responses to 24 Request for Information (RFI) items that provide detailed clarifications on project scope, such as conduit specifications, excavation requirements, equipment provisions, and inspection processes. Notable points include that Kentucky Utilities will provide primary electric pullboxes and a pad-mounted recloser, water can be obtained from the owner, and the contractor is responsible for coordinating permits and inspections through the Kentucky Department of Fire Prevention. The project involves underground electrical infrastructure at a military training facility, with specific technical requirements for conduit routing, backfilling, compaction, and electrical system installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000001_2_SO_FORM.PDF | ||
| Final_RFB_785_2600000001_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-07-26
FOR: Underground Electric Wendell H. Ford Regional Training Center Department of Military Affairs Greenville, Kentucky
DATE: July 17, 2025
RFB-785-2600000001
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-07-26 For: Underground Electric Wendell H. Ford Regional Training Center Department of Military Affairs Greenville, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
DMA WHFRTC Underground Electric
095-CB4E-WH27-00
Addendum #1 7/17/25
This addendum amends Drawings and/or Specifications and/or Addenda for the above title project, as indicated below, and is hereby incorporated into the Contract Documents as part thereof.
Bidders are required to acknowledge receipt of this Addendum in the space provided on the Proposal/Bid form.
General Items and Clarifications:
1. Add the bidding RFI list and responses included in this addendum to the contract documents.
2. Permits for routing underground electric across highway 181 will be obtained by Kentucky Utilities (KU). Contractor shall provide all required coordination to KU for obtaining the permits.
3. Add the following to the two unit price descriptions. “Include 10 feet of conduit on both sides of pullbox and elbows for stubbing up conduits within pullbox.
Specifications:
1. Special Conditions 10000 Paragraph 6 Contractor Provided Temporary Facilities and Controls: Under Utilities, “Water: N/A” shall be replaced with the following.
“Water: Can be obtain from the Owner.”
2. Add specification 260500 Common Work Results for Electrical included in this addendum to the contract documents.
3. Specifications 260519, 260526, 260529, 260533, 260553, 262813, 262816, 265613, 265619, 267753, 312000, 315000, and 329300 have been duplicated. Delete pages 120 of 263 through 195 of 263 as listed at the bottom of the page.
4. Section 267753:
a. Delete paragraph 1.2 (B) (1)
b. Change paragraph 2.2 (A) to read as follows. “Automatic, outdoor, triple single phase, vacuum-interrupter unit designed for pad mount application.”
5. Section 260533:
a. Paragraph 2.2 (B): Change to read as follows. “RNC: NEMA TC2, Type EPC-
40-PVC and EPC-80-PVC, comply with NEMA TC2 and UL 651.”
b. Paragraph 3.1 (A) (1): Add the following at the end. “Exposed conduit for
Kentucky Utilities site lighting circuits shall be EPC-80-PVC.”
c. Paragraph 3.1 (A) (2)” Change to read as follows. “Underground Conduit:
RNC, type EPC-40-PVC direct buried, unless noted otherwise. Conduit routed below roads shall be EPC-80-PVC. Turnups shall be EPC-80-PVC.”
6. Section 312000:
a. Paragraph 1.3 (F) (1) is intended to indicate the specification/power of the machine to be used to define rock.
b. Paragraph 3.6 (B) (1) shall read as follows. “Clearance: 6 inches each side of pipe.”
7. Section 329300:
a. Paragraph 2.5 (A) – Add the following to end of sentence. “Fescues shall be non-clumping
b. Paragraph 2.5 (A) - Replace “Kentucky Blue Grass” with “Rebel”.
Drawings:
1. Add sheet SE001 to the contract documents.
2. Sheet SE207: Add single phase transformer and pad just north of northernmost pullbox junction shown along W. River Queen Road for KU site lighting power supply. Provide 4” primary conduit from pullbox junction to transformer. Provide 1- 1/2” conduit for site lighting from transformer to northernmost pole with type U KU site lighting.
3. Sheet SE211:
a. Breakout sheet reference around the Wash Rack equipment from E502 to
E503.
b. Add cut-and-patch pavement reference note to site lighting circuit at Wash
Rack / Bldg. WH176 area.
4. Add the following note to Sheets E103, E105, E111, E115, E123, E127, E129, and E141. “Work on this sheet is associated with add alternate no. 1.”
5. Sheet E103: B. Patch for roof shall be in accordance with roof manufacturer’s specifications.
6. Sheet E201A: B. Patch for roof shall be in accordance with roof manufacturer’s specifications.
Attachments:
Drawing SE001 Specification Section 260500 Bidding RFI List
End of Addendum #1
PROJECT: DMA - WHFRTC Underground Electric System Name 095-CB4E-WH27-00
RFI No. QUESTION RESPONSE 1 I need to better understand the Alternate NO 1 note that "work on this sheet is asscociated with add
Alternate NO 1". Sheet SE102 shows the demo(Alt#1), Sheet E123 shows new underground (Base Bid? Or Alt#1?), This note is on several sheets.
Will be clarified in the addendum.
2 The spec section 260533.2.2B calls for Type EPC-80PVC (Schedule 80), the plan Trenchh Detail on Sheet E600 calls for Schedule 40. Please clarify.
Schedule 40 PVC can be used for conduit routed underground. All conduits beneath roads and all turnups shall be schedule 80 PVC. All outdoor exposed conduits for KU site lighting shall be schedule 80 PVC.
3 Clarify F(1) and unit prices A(1) in earthwork section. Are you specifying type of equipment required?
Also, on the drawings it shows 6” clearance on both sides of 4” conduit, total of 16”. Is this correct?
Paragraph 1.3 (F) (1) is intended to indicate the specification/power of the machine to be used to define rock. Unit Price paragraph A (1) will be deleted.
4 Clarify paragraph 3.6 (B) (1) of section 312000. Clearance will be changes to 6 inches in the addendum.
5 Pull box's provided by KU? Primary electric pullboxes are furnished by KU and installed by contractor.
6 KU installing re-closure? Pad Mounted recloser is furnished and installed by contractor.
7 Sheet E001 called out in notes on sheet E701? Don't see it. The sheet E001 call out on sheet E701 and sheets E700 and E702 should be for sheet SE001.
8 Sheet SE001 in Drawing list don't see it. Sheet was inadvertantly left out of set and will be included in the addendum.
9 Due to the complexity of the scope of work, material needs and utility/site related questions to be answered, will there be any additional time for RFI’s & Extension of bid date?
There is no extension of the bid date.
10 For poles with type “U” (KU to furnish and install) will KU also be providing a New Pole or utilize existing? Type U lights are shown on existing KU wood poles.
11 For LEDs with type “D” will these be mounted on existing wood pole as drawings call for “wood pole mount”.
Type D lighting fixture will be mounted to an existing customer owned wood pole.
12 Who is to provide NEW pad mount Generator Recloser R2 w/ SCADA controls? Pad mounted recloser will be furnished and installed by the contractor. Recloser shall be provided with SCADA controls compatible with the existing Caterpillar SCADA control from the generator building.
13 Who is responsible for moving connex containers next to building 205? It is not anticipated that any containers near building 205 will need to be relocated. Route ducts around the existing buildings.
14 At each transformer concrete pad location where the ground / terrain isn’t level does this require a poured concrete wall or rip rap or install # 2 stone on slanted edge of earth to get the bank to hold.
Three phase transformers will require a concrete pad.
Yes.
15 Is Potable water available onsite? Not drinking water but clean water for a VacTruck? Water can be obtained from the Owner.
16 Is there a location on site to dump spoils dirt, rock, etc? Yes. Location on site will be determined at preconstruction meeting.
17 Is there a location on site for VacTruck spoils? ATS is willing to build a berm with silt fence and or dirt / #
2 stone and clean up liquid dirt after it dries out?
Yes. Location on site will be determined at preconstruction meeting.
18 Who is responsible for private utility locates? How are we to address unlocatable utilities? It was mentioned in the site visit that the Owner will mark their private utilities to the best of their ability.
19 How will unforeseen rock removal be handled? Rock clause? Soils are considered unclassified. If rock is encountered, the intent is to route ducts around rock.
20 Can ATS be provided a detailed list of what is being provided by KU for this project? Please reference the Special Conditions specification and Sheet SE001 that will be included in addendum that shows the scope of work for KU.
21 In the event of mass rock when is conduit encased in concrete an acceptable means of application? How will this additional cost be handled?
If rock is encounter and duct cannot be routed around it, alternate means of installation will be considered.
22 Clarity on how each building will be metered? Most buildings already have a separate KU meter. New KU meters shown will require meter base. Meter bases are furnished and installed by the contractor. Meter will be provided by KU.
23 Who is responsible for providing underground pull boxes/vaults? Underground pullboxes for KU primary electric will be furnished by KU and installed by the contractor.
24 Building WK201 calls for new exterior disconnect to be mounted near AC Mini Splits. Currently there is a disconnect near the corner. There is not allowable space to meet NEC requirements for clearances on that wall. Please provide clarity how to address this?
Drawings show that the secondary electric from the pad mounted transformer to building WK201 shall be connected to the existing service disconnect switch within the building electrical room. New disconnect switch is not shown nor required.
BID RFI's
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 1
SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This section applies to all work specified in Divisions 26.
B. Provide all required materials, labor, equipment, installation, fabrication and testing required for a complete, safe, and fully operational system. System shall include all required materials and features whether specified or shown on drawings or not to comply with applicable codes and authorities having jurisdiction.
C. The electrical installation shall be made in strict conformance with the latest edition and supplements in force at the time of bid opening of the National Electrical Code, the Rules and Regulations of the Kentucky Building Code, the applicable Standards of the National Fire Protection Association, and applicable requirements of the Occupational Safety and Health Act of the United States Department of Labor. All materials and equipment employed shall be approved by and bear the label of Underwriters' Laboratories, Inc., where such labeling is made available by any manufacturer for said materials or equipment. All codes and regulations applicable shall be considered as jointly governing and the requirements of either and all will prevail. If it occurs that Drawings conflict with any applicable code, then this Contractor shall immediately bring same to attention of Engineer or his representative for resolution.
1.3 DESCRIPTION OF DOCUMENTS
A. The Drawings are generally diagrammatic and indicate the general design and arrangement of the proposed work. Do not scale drawings for the exact location of equipment and work. The exact routing of circuits and final location of all the electrical equipment, unless specifically dimensioned on the Drawings, shall be subject to site, building and structural conditions and work of other trades involved in the construction, and subject to the approval of the Engineer.
The Contractor shall familiarize himself with the Contract Documents and shall be responsible for the final location of his particular equipment to suit field conditions encountered and to avoid interferences with other trades' work, without extra cost to the Owner or the Engineer.
The Contractor shall visit the job site to determine the job conditions. The Engineer reserves the right to make minor changes in equipment locations at any time prior to rough-in of the electrical work without incurring any additional costs.
B. Where sizes are not provided for material and equipment, the material and equipment shall be sized in accordance with the latest addition of the National Electrical Code and in accordance with the manufacturer’s recommendations.
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 2
1.4 DEFINITIONS
A. The term “concealed space” shall mean all crawl spaces, and other areas not generally accessible to the occupants.
B. The term “electrical space” as used in this division of the specifications shall mean any space designated primarily for the installation of electrical equipment.
C. “Provide” - Furnish and install the specific item, equipment, and/or system.
D. “Furnish” - Supply the specific item, equipment, and/or system.
E. “Install” - Set in position and adjust for use the specific item, equipment, and/or system unless otherwise specifically noted to be installed by others.
F. “Concealed” - Hidden from sight underground, in concrete, etc.
G. “Exposed” - Not hidden from sight.
H. “Work” - Labor and installation, including materials, equipment, and systems required for completion of all portions of the project.
1.5 CODES AND STANDARDS
A. Following is a list of abbreviations for codes and standards which are referred to in the Specifications. Where such reference is made, the code or standard becomes a part of these Specifications as if the code or standard were included herein. Reference is always to the latest edition of the code or standard unless otherwise specifically noted.
ANSI - American National Standards Institute, Inc.
NFPA - National Fire Protection Association ASTM - American Society for Testing and Materials NBS - National Bureau of Standards NEMA - National Electrical Manufacturers Association UL - Underwriters' Laboratories, Inc.
NEC - National Electrical Code NESC - National Electrical Safety Code IPCEA - Insulated Power Cable Engineers Assn.
IEEE - Institute of Electrical and Electronics Engineers OSHA - Occupational Safety and Health Act IES - Illuminating Engineering Society JIC - Joint Industrial Council
1.6 GUARANTEES AND WARRANTIES
A. This Contractor shall guarantee all equipment, apparatus, materials, and workmanship entering into the Contract to be the best of its respective kind, and shall replace all parts at his expense which are defective within one year from final acceptance of the work by the Engineer. Items of equipment which may have longer guarantees shall have warranties and guarantees completed, in order, and in effect at the time of final acceptance of the work by the Engineer.
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 3
This Contractor shall furnish all such warranties and guarantees at the time of final acceptance of the work.
B. All work that is not installed in accordance with the Contract Documents shall be repaired or replaced at the direction of the Engineer.
1.7 SUBMITTAL
A. Submittals shall be made in accordance with Submittals paragraph in Division 1.
B. Submittal data shall include specification data, such as metal gauges, finishes, optional accessories; even though such equipment and materials may be as specified. In addition, the submittal data shall include performance (certification) data, wiring diagrams where applicable, accurate dimensional data, and a recommended spare parts list. Outline or dimensional drawings alone are not acceptable.
C. No roughing-in or connections shall be done until accepted equipment submittals are in the hands of the Contractor. It shall be this Contractor's responsibility to obtain accepted drawings and to make all connections in the neatest and most workmanlike manner possible. This Contractor shall coordinate with all other Contractors having any connections or roughing-in to the equipment.
D. In general, normal catalog information (with the particular items underlined or otherwise denoted as being the submitted item) will be accepted as submittal data. Installation, operating and maintenance instructions must be that information specifically applicable to the items furnished, which is ordinarily supplied with the equipment to the Owner, for any modifications indicated. Wiring diagrams must be correct for the application. Generalized wiring diagrams, showing alternate methods of connection, will not be acceptable unless all unrelated sections are marked out. Submittal data sheets which indicate several different model numbers, figure numbers, optional accessories, or installation arrangements shall be clearly marked to indicate the specific items of equipment being furnished. Certificates shall be furnished as requested.
Submittal data must be complete for each piece of equipment; piecemeal data will not be processed.
E. It shall be noted that acceptance of shop drawings by the Engineer applies only to general design, arrangement, type, capacity, and quality. Such acceptance does not relieve the Contractor of the responsibility for furnishing the proper equipment.
F. Corrections or comments made on the submittals during the Engineer's review do not relieve the Contractor from compliance with the Drawings and Specifications. The Engineer's review of submittals is only for general conformance with design concept and general compliance with the information given in the Contract Documents. The Contractor's responsibility includes, but is not limited to, conforming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner.
1.8 SUBSTITUTIONS
A. When this Contractor requests approval of substitute materials and/or equipment, except where under formal alternate proposal, it shall be understood that such substitution, if approved, will be made without cost to the Owner and Engineer, regardless of changes. In all cases where
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 4
substitutions affect other trades, the Contractor offering such substitutions shall reimburse all affected contractors for all necessary changes in their work.
1.9 OPERATION AND MAINTENANCE MANUALS
A. Operation and maintenance data shall be submitted in accordance with the requirements of Division “GENERAL REQUIREMENTS”.
1.10 RECORD DRAWINGS
A. This Contractor shall submit to the Owner Record Drawings. Drawings shall be identified with the Contractor’s name, the date, and title “RECORD DRAWINGS” on the paper copies.
1.11 PROJECT CONDITIONS
A. Interruption of Existing Electrical Services: Comply with the requirements of the Special Conditions.
1.12 COORDINATION
A. Coordinate arrangement, mounting, and support of electrical equipment:
1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.
2. To provide for ease of disconnecting the equipment with minimum interference to other installations.
3. To allow right of way for piping and conduit installed at required slope.
4. So connecting raceways, and cables will be clear of obstructions and of the working and access space of other equipment.
B. Coordinate installation of required supporting devices.
C. The Contractor shall coordinate with all other contractors in locating conduit and equipment in order to avoid conflict with all other trades' work. No extra compensation will be allowed to cover the cost of relocating conduit, boxes, or other electrical equipment found encroaching on space required by others.
1.13 ABBREVIATIONS
A. Abbreviations may be used and indicated throughout the Specifications and Drawings, and will conform to the following list:
A or AMP AMPERES, OR AMPACITY
AFF ABOVE FINISHED FLOOR
C CONDUIT
CB CIRCUIT BREAKER
CKT CIRCUIT
CU COPPER
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 5
EC ELECTRICAL CONTRACTOR
EM ON EMERGENCY CIRCUIT
EMT ELECTRICAL METALLIC TUBING
FDS FUSIBLE DISCONNECT SWITCH
G GREEN GROUNDING CONDUCTOR
GND GROUND
JB JUNCTION BOX
KVA KILOVOLT AMPERES
KW KILOWATTS
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NIC NOT IN THIS CONTRACT
Ø PHASE
PART 2 - PRODUCTS
2.1 GENERAL
A. Material and equipment shall be furnished as specified in this section and each individual electrical section of these Specifications and shall be in strict accordance with applicable ANSI, NBS, ASTM, NESC, NEMA, IEEE, IPCEA, UL, NEC, OSHA and NFPA standards, codes, and specifications. Applicable codes, standards, and manufacturers' products referred to in these Specifications shall establish minimum requirements for materials and equipment furnished for this installation.
B. When two or more articles of the same material or equipment are required, they shall be of the same manufacturer.
C. New material and equipment shall be provided for the entire project, unless noted otherwise.
2.2 Bolting shall be carbon steel conforming to ASTM A-307 with heavy hexagonal nuts.
2.3 Angles, Channels, Beams, Bars and Rods shall be steel conforming to ASTM A-36 as applicable.
PART 3 - EXECUTION
3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION
A. Comply with NECA 1.
B. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 6
3.2 EQUIPMENT CONNECTION AND WIRING
A. Unless specifically noted otherwise on the Drawings or elsewhere in the Specifications, all wiring and all equipment connections shall be provided by the Electrical Contractor.
B. The Electrical Contractor shall furnish and install all disconnect switches, NEC circuit protection, relays, and devices as required for all equipment to provide complete and operable electrical systems, unless the items are specifically noted elsewhere as being provided with, or as part of, the equipment.
C. Electrical Contractor shall verify horsepower, voltage, phase, starting requirements, quantity of wires, and wattage of all equipment which requires electrical connections before equipment pur-chase or rough-in, and shall install feeders and branch circuits which are suitable in all respects for connection to, and operation with, the equipment furnished. Exact location of all equipment which requires electrical connection shall be verified before rough-in.
3.3 EQUIPMENT INSTALLATION
A. All equipment shall be installed at locations indicated and oriented so as to be easily accessible.
B. Assembly and installation of equipment shall be in strict accordance with manufacturer's installation instructions. Equipment shall be securely anchored in place. Care shall be exercised to correctly orient equipment before securing in place.
3.4 TRENCHING AND BACKFILL
A. Underground Electrical Secondary Services shall be installed in trenching dug specifically for such services.
B. The trench shall be dug so that the service shall be laid to the alignment and depth required, and it shall be excavated only so far in advance of installation as can be completed in one day. The width of the trench shall be ample to permit the service to be laid and the backfill to be placed and compacted as specified. The minimum trench width shall be six inches. The minimum trench depth shall be twenty-four inches.
C. Materials to be excavated shall include earth, rock, or any other material encountered within the limits of trench excavation. No adjustment in the contract price will be made on account of the presence or absence of shale, sandstone, masonry, rock, or other material. The Contractor shall familiarize himself with existing site conditions by examination of the actual site and Contract Documents.
D. All excavated material shall be piled in a manner which will not endanger the work, and which will avoid obstructing sidewalks and driveways. In general, excavated material shall be piled on the high side of the trench to form a dam to prevent surface water from entering the trench.
E. The Contractor may use trench digging machinery or employ hand methods but shall employ hand methods in locating underground utilities.
F. All excavated materials not required or not suitable for backfill shall be disposed of by the Contractor.
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 7
G. Sheeting and shoring shall be placed as necessary for the protection of the work and for the safety of personnel.
H. The trench bottom shall be accurately graded to provide a uniform surface for the type of bedding specified. Stones shall be removed as necessary to avoid point bearing.
I. Whenever wet or otherwise unstable material that is incapable of properly supporting the conduit, duct or structure is encountered in the bottom of the excavation, such material shall be over excavated to a depth to allow for construction of a stable bedding.
J. Any over depth excavation shall be backfilled with materials specified for backfilling the lower portions of trenches.
K. The first six inches of trench depth above the utility shall be backfilled by hand with sand. One hundred present of this sand shall pass a ¾ inch screen. Ninety-five percent shall pass a No. 4 screen, and not oversight percent shall pass a No. 100 screen. Stamp this backfill thoroughly, taking care not to disturb the conduit or injure the conduit coating. For the remaining trench depth, the backfill shall be earth or granular material, except that the material may contain stones, rock, concrete or masonry materials (but no cinders), with a maximum dimension off 4 inches, providing the voids in such coarse material are completely filled with earth or granular material. In the event that sufficient material for trench backfill is not available from trenching or tother excavation, the Contractor shall supply and place the requisite additional material.
L. Backfill shall be thoroughly compacted with an approved mechanical tamper, or if the soil is of a granular nature, by puddling with hose and long pipe nozzle after the trench is backfilled, provided that under pavements and other surfacing, the backfill shall be compacted solidly in layers not more than 6 inches thick, measured loose, with mechanical tampers.
M. Compaction Requirements – All fill and backfill shall be compacted to the following percent of the maximum density obtained in accordance with ASTM D-1557, Method D (Modified Proctor). Moisture contents shall range from 1% below to 4% above optimum.
1. Beneath sidewalks and pavement – 95%
3.6 PERMITS, CERTIFICATES, LAWS AND ORDINANCES
A. The Electrical Contractor shall, at his own expense, procure all permits, certificates, and licenses required of him by law for the execution of his work. He shall comply with all Federal, State, and local laws, ordinances, rules and regulations relating to the performance of the work.
B. Following completion, a certificate of approval shall be secured from the local code enforcement authority and delivered to the Engineer.
3.7 PAINTING
A. Refinish surfaces marred or damaged by electrical work to original or specified condition.
B. Replace marred or discolored factory, multiple coat, baked on finish surfaces. Minor inconspicuous scratches may be “touched-up”.
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 8
3.8 INSPECTION
A. The Contractor shall notify the Electrical Inspector in writing upon the start of the job and a copy of the notice shall be sent to the Engineer.
B. Upon project completion, and when wiring and equipment have been installed, inspected and found to be in compliance with the National Electric Code, the inspector shall issue a Certificate of Compliance to the Owner.
C. The Contractor is expected to have (all electrical systems) installed in code compliance and to provide same at no additional cost to the Owner.
D. Inspections shall be scheduled by the Contractor with the State Fire Marshall Electrical Inspector at (1) rough-in, (2) 50% of project, (3) 90% of project, (4) final completion, as a minimum.
E. The Contractor shall furnish certificates of final approval by the Electrical Inspection Bureau and final payment shall be withheld until he has presented the Engineer with the aforementioned certificates of approval.
F. Electrical Inspections: The Contractor shall not use private inspectors. All electrical inspections will be performed by inspectors from the Kentucky Department of Fire Prevention, Office of Electrical Inspections (502-573-0364). The Contractor shall be responsible for requesting, scheduling and coordinating all electrical inspections through the Office of Electrical Inspections.
END OF SECTION 260500
ST
AT
E OF KENTUCKY
PROFESS IONAL EN
G IN
EE
R
E
EADOS
L
I C E N S E D
AES
WORK PERFORMED BY KENTUCKY UTILITIES (KU):
SITE PLAN
ELECTRICAL LEGEND
ONE LINE DIAGRAM
ELECTRICAL REMOVAL NOTES:GENERAL ELECTRICAL NOTES:
AutoCAD SHX Text
ELECTRICAL LEGEND & GENERAL INFORMATION
AutoCAD SHX Text
SE001
AutoCAD SHX Text
KA
AutoCAD SHX Text
JEM
AutoCAD SHX Text
COPYRIGHT 2016
AutoCAD SHX Text
ALL RIGHTS RESERVED
AutoCAD SHX Text
B.C.C.L.T. INC
AutoCAD SHX Text c
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AS BUILT DATE
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text
FINANCE AND ADMINISTRATION CABINET
AutoCAD SHX Text
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
AutoCAD SHX Text
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
AutoCAD SHX Text
FRANKFORT, KENTUCKY
AutoCAD SHX Text
DMA - WHFRTC UNDERGROUND ELECTRIC
AutoCAD SHX Text 23107
AutoCAD SHX Text
DRAWING INFORMATION
AutoCAD SHX Text
DRAWING DATE
AutoCAD SHX Text 05/21/2025
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
A&E FILE NO.
AutoCAD SHX Text
DECA LOG #
AutoCAD SHX Text
095-CB4E-WH27-00
AutoCAD SHX Text
ACCOUNT NO.
AutoCAD SHX Text 05/21/2025
AutoCAD SHX Text
RTA DATE
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION HISTORY OF THIS DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text Suite 200
AutoCAD SHX Text Louisville, KY 40222
AutoCAD SHX Text ph:(502)708-1860
AutoCAD SHX Text 9100 Marksfield Rd
AutoCAD SHX Text 05/21/2025
AutoCAD SHX Text
RTA
AutoCAD SHX Text
ACSR
AutoCAD SHX Text
AAC
AutoCAD SHX Text
OVERHEAD CONDUCTOR
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
ALL ALUMINUM CONDUCTOR
AutoCAD SHX Text
ALUMINUM CONDUCTOR STEEL REINFORCED
AutoCAD SHX Text
POLE MOUNTED TRANSFORMER
AutoCAD SHX Text
PAD MOUNTED TRANSFORMER
AutoCAD SHX Text
UNDERGROUND CONDUCTOR
AutoCAD SHX Text
NON-FUSED DISCONNECT SAFETY SWITCH.
AutoCAD SHX Text
FUSE.
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CURRENT TRANSFORMER.
AutoCAD SHX Text
UG
AutoCAD SHX Text
OH
AutoCAD SHX Text
VOLTAGE TRANSFORMER.
AutoCAD SHX Text THE REMOVAL NOTES AND DRAWINGS SHALL SERVE TO AID THE CONTRACTOR IN HIS EVALUATION OF THE EXTENT OF
AutoCAD SHX Text
REMOVALS, BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.
AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE BUILDINGS AND SITE TO BECOME FAMILIAR WITH
AutoCAD SHX Text THE EXISTING CONDITIONS, VERIFY SIZE, LOCATION, AND USAGE OF UTILITIES AND EQUIPMENT PRIOR TO
AutoCAD SHX Text
REMOVAL.
AutoCAD SHX Text ALL EQUIPMENT REMOVED FOR RELOCATION OR REUSE SHALL BE REMOVED IN SUCH A MANNER THAT REUSE IS POSSIBLE.
AutoCAD SHX Text
PATCH ALL OPENINGS IN SURFACES WHERE REMOVAL OF EQUIPMENT OR DEVICES
AutoCAD SHX Text
CREATES SUCH OPENINGS. PATCH OPENINGS TO MATCH EXISTING.
AutoCAD SHX Text IF PORTIONS OF CIRCUITS SERVING EQUIPMENT TO REMAIN MUST BE RELOCATED OR REMOVED DUE TO OTHER
AutoCAD SHX Text REMOVAL OR DUE TO INTERFERENCE WITH NEW EQUIPMENT INSTALLATION, THE CIRCUITS SHALL BE MODIFIED
AutoCAD SHX Text IN SUCH A MANNER WHICH WILL ENSURE THE PROPER OPERATION OF THE EQUIPMENT AFTER CONSTRUCTION IS
AutoCAD SHX Text COMPLETE. USE THE SAME TYPE OF CONDUCTOR AND SAME CONDUIT SIZE AS EXISTING TO MAKE ALL
AutoCAD SHX Text
REQUIRED MODIFICATIONS.
AutoCAD SHX Text CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOVALS REQUIRED FOR THE INSTALLATION OF NEW WORK, AutoCAD SHX Text
WHETHER OR NOT IT IS SPECIFICALLY INDICATED OR NOTED IN THESE DOCUMENTS.
AutoCAD SHX Text ALL EQUIPMENT INDICATED AS CROSS HATCHED, OR NOTED, SHALL BE DISCONNECTED AND REMOVED.
AutoCAD SHX Text ALL CONDUIT RUNS TO REMOVED EQUIPMENT OR DEVICES SHALL BE COMPLETELY REMOVED BACK TO SOURCE
AutoCAD SHX Text INCLUDING ALL HANGERS, BEAM CLAMPS, MISCELLANEOUS SUPPORTS, AND WIRING, UNLESS WIRING IS
AutoCAD SHX Text
REQUIRED TO SERVE EXISTING EQUIPMENT TO REMAIN.
AutoCAD SHX Text
ALL EQUIPMENT AND MATERIAL DETERMINED BY THE OWNER TO BE SALVAGEABLE SHALL
AutoCAD SHX Text REMAIN THE PROPERTY OF THE OWNER AND STORED AT THE LOCATION ON THE PREMISES DESIGNATED BY THE
AutoCAD SHX Text OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL OTHER ELECTRICAL EQUIPMENT
AutoCAD SHX Text
WHICH IS DISCONNECTED AND REMOVED DURING DEMOLITION, UNLESS NOTED OTHERWISE.
AutoCAD SHX Text A.
AutoCAD SHX Text B.
AutoCAD SHX Text C.
AutoCAD SHX Text D.
AutoCAD SHX Text E.
AutoCAD SHX Text F.
AutoCAD SHX Text G.
AutoCAD SHX Text H.
AutoCAD SHX Text I.
AutoCAD SHX Text
NEW TO EXIST. CONNECTION
AutoCAD SHX Text
SITE LIGHTING FIXTURE
AutoCAD SHX Text W
AutoCAD SHX Text
SD
AutoCAD SHX Text
SS
AutoCAD SHX Text
UE
AutoCAD SHX Text
GAS
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
OVERHEAD ELECTRIC
AutoCAD SHX Text
GAS MAIN
AutoCAD SHX Text
UC
AutoCAD SHX Text
UNDERGROUND COMMUNICATIONS
AutoCAD SHX Text
OE
AutoCAD SHX Text
HATCH INDICATED ITEMS
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
UTILITY POWER POLE
AutoCAD SHX Text
PAD MTD. LOAD BREAK JUNCTION
AutoCAD SHX Text
UTILITY METER.
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
POLE MTD. RECLOSER SWITCH.
AutoCAD SHX Text
OVERHEAD COMMUNICATIONS
AutoCAD SHX Text
OC
AutoCAD SHX Text
UTILITY POWER POLE WITH LIGHT FIXTURE
AutoCAD SHX Text
UTILITY POWER POLE WITH POLE MTD. TRANSFORMER(S)
AutoCAD SHX Text
OVERHEAD ELECTRIC & COMMUNICATIONS
AutoCAD SHX Text
OEC
AutoCAD SHX Text A. FINAL LOCATIONS OF PRIMARY AND SECONDARY ELECTRIC PULLBOX JUNCTIONS SHALL BE DETERMINED BY FINAL LOCATIONS OF PRIMARY AND SECONDARY ELECTRIC PULLBOX JUNCTIONS SHALL BE DETERMINED BY KENTUCKY UTILITIES. B. CONTRACTOR SHALL REMOVE TREES, BRUSHWOOD, AND UNDERGROWTH AS REQUIRED TO INSTALL RACEWAYS. CONTRACTOR SHALL REMOVE TREES, BRUSHWOOD, AND UNDERGROWTH AS REQUIRED TO INSTALL RACEWAYS. ALL MATERIAL REMOVED SHALL BE REMOVED FROM THE TRAINING FACILITY. CONTRACTOR SHALL COORDINATE REMOVALS WITH THE TRAINING FACILITY. C. THE KU POINT OF CONTACT IS HUNTER GIPSON, THE KU ELECTRICAL ENGINEER. PHONE NUMBER: 270-383-6000; THE KU POINT OF CONTACT IS HUNTER GIPSON, THE KU ELECTRICAL ENGINEER. PHONE NUMBER: 270-383-6000; EMAIL: HUNTER.GIPSON@LGE.KU.COM D. RANGE OPERATIONS DURING THE CONSTRUCTION PERIOD WILL NECESSITATE BLACK-OUT DATES TO OCCUR. RANGE OPERATIONS DURING THE CONSTRUCTION PERIOD WILL NECESSITATE BLACK-OUT DATES TO OCCUR. NO WORK ON-SITE WILL BE ALLOWED DURING BACK-OUT DATES. THE CONTRACTOR OF AWARD WILL BE FURNISHED A SCHEDULE OF ANTICIPATED BLACK-OUT DATES. E. WORK OF THE PROJECT SHALL BE IN COMPLIANCE WITH ALL REQUIREMENTS LISTED IN THE SPECIAL CONDITIONS WORK OF THE PROJECT SHALL BE IN COMPLIANCE WITH ALL REQUIREMENTS LISTED IN THE SPECIAL CONDITIONS ARTICLE `14, OTHER SPECIAL CONDITIONS OF CONTRACT'.
AutoCAD SHX Text
1. REMOVAL OF OVERHEAD MEDIUM VOLTAGE PRIMARY CONDUCTORS. REMOVAL OF OVERHEAD MEDIUM VOLTAGE PRIMARY CONDUCTORS. 2. REMOVAL OF OVERHEAD SECONDARY CONDUCTORS ON THE LINE-SIDE OF THE LOCAL BUILDING UTILITY METER. REMOVAL OF OVERHEAD SECONDARY CONDUCTORS ON THE LINE-SIDE OF THE LOCAL BUILDING UTILITY METER. 3. REMOVAL OR MODIFICATION OF WOOD UTILITY POLES USED WITH MEDIUM VOLTAGE PRIMARY ELECTRIC OR UTILITY REMOVAL OR MODIFICATION OF WOOD UTILITY POLES USED WITH MEDIUM VOLTAGE PRIMARY ELECTRIC OR UTILITY LOW VOLTAGE CABLING FOR UTILITY PROVIDED SITE LIGHTING. 4. FURNISH AND INSTALL ALL MEDIUM VOLTAGE PRIMARY CONDUCTORS IN RACEWAYS PROVIDED BY THE CONTRACTOR. FURNISH AND INSTALL ALL MEDIUM VOLTAGE PRIMARY CONDUCTORS IN RACEWAYS PROVIDED BY THE CONTRACTOR. 5. FURNISH AND INSTALL SUPPLY WIRING SERVING UTILITY PROVIDED SITE LIGHTING FIXTURES. RACEWAY SHALL BE FURNISH AND INSTALL SUPPLY WIRING SERVING UTILITY PROVIDED SITE LIGHTING FIXTURES. RACEWAY SHALL BE PROVIDED BY THE CONTRACTOR. 6. FURNISH 1 PHASE TRANSFORMER PADS FOR THE INSTALLATION BY THE CONTRACTOR. 3 PHASE TRANSFORMER FURNISH 1 PHASE TRANSFORMER PADS FOR THE INSTALLATION BY THE CONTRACTOR. 3 PHASE TRANSFORMER 3 PHASE TRANSFORMER PADS PROVIDED BY THE CONTRACTOR. . 7. FURNISH PULLBOX JUNCTION BOXES FOR INSTALLATION BY THE CONTRACTOR. (KU) HAS ESTIMATED THAT BOXES FURNISH PULLBOX JUNCTION BOXES FOR INSTALLATION BY THE CONTRACTOR. (KU) HAS ESTIMATED THAT BOXES WILL BE REQUIRED EVERY 350'-400' OF RACEWAY. 8. FURNISH ALL SECONDARY CONDUCTORS FROM SINGLE PHASE PAD MOUNTED TRANSFORMER TO LOCAL UTILITY FURNISH ALL SECONDARY CONDUCTORS FROM SINGLE PHASE PAD MOUNTED TRANSFORMER TO LOCAL UTILITY METER IN RACEWAY PROVIDED BY THE CONTRACTOR. 9. INSTALL ALL UTILITY METERS IN METER BASES PROVIDED BY THE CONTRACTOR. INSTALL ALL UTILITY METERS IN METER BASES PROVIDED BY THE CONTRACTOR. 10. FURNISH AND INSTALL SITE LIGHTING FIXTURES IDENTIFIED AS "UTILITY COMPANY SITE LIGHTING FIXTURE".FURNISH AND INSTALL SITE LIGHTING FIXTURES IDENTIFIED AS "UTILITY COMPANY SITE LIGHTING FIXTURE".
AutoCAD SHX Text AREA SITE LIGHTING FIXTURE AS SCHEDULED COMPLETE WITH REINFORCED CONCRETE BASE, AND ALL REQUIRED MOUNTING HARDWARE.
AutoCAD SHX Text FLOODLIGHT TYPE LIGHTING FIXTURE AS SCHEDULED COMPLETE WITH ALL THE REQUIRE MOUNTING.
AutoCAD SHX Text AREA SITE LIGHTING DUEL HEAD SWIVEL FIXTURE AS SCHEDULED COMPLETE WITH REINFORCED CONCRETE BASE, AND ALL REQUIRED MOUNTING HARDWARE.
| Addendum One |
| WHFRTC Addendum |
| General Items and Clarifications: |
| 1. Add the bidding RFI list and responses included in this addendum to the contract documents. |
| 2. Permits for routing underground electric across highway 181 will be obtained by Kentucky Utilities (KU). Contractor shall provide all required coordination to KU for obtaining the permits. |
| 3. Add the following to the two unit price descriptions. “Include 10 feet of conduit on both sides of pullbox and elbows for stubbing up conduits within pullbox. |
| Specifications: |
| 1. Special Conditions 10000 Paragraph 6 Contractor Provided Temporary Facilities and Controls: Under Utilities, “Water: N/A” shall be replaced with the following. “Water: Can be obtain from the Owner.” |
| 2. Add specification 260500 Common Work Results for Electrical included in this addendum to the contract documents. |
| 3. Specifications 260519, 260526, 260529, 260533, 260553, 262813, 262816, 265613, 265619, 267753, 312000, 315000, and 329300 have been duplicated. Delete pages 120 of 263 through 195 of 263 as listed at the bottom of the page. |
| 4. Section 267753: |
| a. Delete paragraph 1.2 (B) (1) |
| b. Change paragraph 2.2 (A) to read as follows. “Automatic, outdoor, triple single phase, vacuum-interrupter unit designed for pad mount application.” |
| 5. Section 260533: |
| a. Paragraph 2.2 (B): Change to read as follows. “RNC: NEMA TC2, Type EPC-40-PVC and EPC-80-PVC, comply with NEMA TC2 and UL 651.” |
| b. Paragraph 3.1 (A) (1): Add the following at the end. “Exposed conduit for Kentucky Utilities site lighting circuits shall be EPC-80-PVC.” |
| c. Paragraph 3.1 (A) (2)” Change to read as follows. “Underground Conduit: RNC, type EPC-40-PVC direct buried, unless noted otherwise. Conduit routed below roads shall be EPC-80-PVC. Turnups shall be EPC-80-PVC.” |
| 6. Section 312000: |
| a. Paragraph 1.3 (F) (1) is intended to indicate the specification/power of the machine to be used to define rock. |
| b. Paragraph 3.6 (B) (1) shall read as follows. “Clearance: 6 inches each side of pipe.” |
| 7. Section 329300: |
| a. Paragraph 2.5 (A) – Add the following to end of sentence. “Fescues shall be non-clumping |
| b. Paragraph 2.5 (A) - Replace “Kentucky Blue Grass” with “Rebel”. |
| Drawings: |
| 1. Add sheet SE001 to the contract documents. |
| 2. Sheet SE207: Add single phase transformer and pad just north of northernmost pullbox junction shown along W. River Queen Road for KU site lighting power supply. Provide 4” primary conduit from pullbox junction to transformer. Provide 1-1/2” conduit... |
| 3. Sheet SE211: |
| a. Breakout sheet reference around the Wash Rack equipment from E502 to E503. |
| b. Add cut-and-patch pavement reference note to site lighting circuit at Wash Rack / Bldg. WH176 area. |
| 4. Add the following note to Sheets E103, E105, E111, E115, E123, E127, E129, and E141. “Work on this sheet is associated with add alternate no. 1.” |
| 5. Sheet E103: B. Patch for roof shall be in accordance with roof manufacturer’s specifications. |
| 6. Sheet E201A: B. Patch for roof shall be in accordance with roof manufacturer’s specifications. |
| Bidding RFI |
| Sheet1 |
| 260500 COMMON WORK RESULTS FOR ELECTRICAL |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. This section applies to all work specified in Divisions 26. |
| B. Provide all required materials, labor, equipment, installation, fabrication and testing required for a complete, safe, and fully operational system. System shall include all required materials and features whether specified or shown on drawings or... |
| C. The electrical installation shall be made in strict conformance with the latest edition and supplements in force at the time of bid opening of the National Electrical Code, the Rules and Regulations of the Kentucky Building Code, the applicable St... |
| 1.3 DESCRIPTION OF DOCUMENTS |
| A. The Drawings are generally diagrammatic and indicate the general design and arrangement of the proposed work. Do not scale drawings for the exact location of equipment and work. The exact routing of circuits and final location of all the electr... |
| B. Where sizes are not provided for material and equipment, the material and equipment shall be sized in accordance with the latest addition of the National Electrical Code and in accordance with the manufacturer’s recommendations. |
| 1.4 DEFINITIONS |
| A. The term “concealed space” shall mean all crawl spaces, and other areas not generally accessible to the occupants. |
| B. The term “electrical space” as used in this division of the specifications shall mean any space designated primarily for the installation of electrical equipment. |
| C. “Provide” - Furnish and install the specific item, equipment, and/or system. |
| D. “Furnish” - Supply the specific item, equipment, and/or system. |
| E. “Install” - Set in position and adjust for use the specific item, equipment, and/or system unless otherwise specifically noted to be installed by others. |
| F. “Concealed” - Hidden from sight underground, in concrete, etc. |
| G. “Exposed” - Not hidden from sight. |
| H. “Work” - Labor and installation, including materials, equipment, and systems required for completion of all portions of the project. |
| 1.5 CODES AND STANDARDS |
| A. Following is a list of abbreviations for codes and standards which are referred to in the Specifications. Where such reference is made, the code or standard becomes a part of these Specifications as if the code or standard were included herein. ... |
| 1.6 GUARANTEES AND WARRANTIES |
| A. This Contractor shall guarantee all equipment, apparatus, materials, and workmanship entering into the Contract to be the best of its respective kind, and shall replace all parts at his expense which are defective within one year from final accept... |
| B. All work that is not installed in accordance with the Contract Documents shall be repaired or replaced at the direction of the Engineer. |
| 1.7 SUBMITTAL |
| A. Submittals shall be made in accordance with Submittals paragraph in Division 1. |
| B. Submittal data shall include specification data, such as metal gauges, finishes, optional accessories; even though such equipment and materials may be as specified. In addition, the submittal data shall include performance (certification) data, wi... |
| C. No roughing-in or connections shall be done until accepted equipment submittals are in the hands of the Contractor. It shall be this Contractor's responsibility to obtain accepted drawings and to make all connections in the neatest and most workma... |
| D. In general, normal catalog information (with the particular items underlined or otherwise denoted as being the submitted item) will be accepted as submittal data. Installation, operating and maintenance instructions must be that information specif... |
| E. It shall be noted that acceptance of shop drawings by the Engineer applies only to general design, arrangement, type, capacity, and quality. Such acceptance does not relieve the Contractor of the responsibility for furnishing the proper equipment. |
| F. Corrections or comments made on the submittals during the Engineer's review do not relieve the Contractor from compliance with the Drawings and Specifications. The Engineer's review of submittals is only for general conformance with design concept... |
| 1.8 SUBSTITUTIONS |
| A. When this Contractor requests approval of substitute materials and/or equipment, except where under formal alternate proposal, it shall be understood that such substitution, if approved, will be made without cost to the Owner and Engineer, regardle... |
| 1.9 OPERATION AND MAINTENANCE MANUALS |
| A. Operation and maintenance data shall be submitted in accordance with the requirements of Division “GENERAL REQUIREMENTS”. |
| 1.10 RECORD DRAWINGS |
| A. This Contractor shall submit to the Owner Record Drawings. Drawings shall be identified with the Contractor’s name, the date, and title “RECORD DRAWINGS” on the paper copies. |
| 1.11 PROJECT CONDITIONS |
| A. Interruption of Existing Electrical Services: Comply with the requirements of the Special Conditions. |
| 1.12 COORDINATION |
| A. Coordinate arrangement, mounting, and support of electrical equipment: |
| 1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated. |
| 2. To provide for ease of disconnecting the equipment with minimum interference to other installations. |
| 3. To allow right of way for piping and conduit installed at required slope. |
| 4. So connecting raceways, and cables will be clear of obstructions and of the working and access space of other equipment. |
| B. Coordinate installation of required supporting devices. |
| C. The Contractor shall coordinate with all other contractors in locating conduit and equipment in order to avoid conflict with all other trades' work. No extra compensation will be allowed to cover the cost of relocating conduit, boxes, or other ele... |
| 1.13 ABBREVIATIONS |
| A. Abbreviations may be used and indicated throughout the Specifications and Drawings, and will conform to the following list: |
| PART 2 - PRODUCTS |
| 2.1 GENERAL |
| A. Material and equipment shall be furnished as specified in this section and each individual electrical section of these Specifications and shall be in strict accordance with applicable ANSI, NBS, ASTM, NESC, NEMA, IEEE, IPCEA, UL, NEC, OSHA and NF... |
| B. When two or more articles of the same material or equipment are required, they shall be of the same manufacturer. |
| C. New material and equipment shall be provided for the entire project, unless noted otherwise. |
| 2.2 Bolting shall be carbon steel conforming to ASTM A-307 with heavy hexagonal nuts. |
| 2.3 Angles, Channels, Beams, Bars and Rods shall be steel conforming to ASTM A-36 as applicable. |
| PART 3 - EXECUTION |
| 3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION |
| A. Comply with NECA 1. |
| B. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with... |
| 3.2 EQUIPMENT CONNECTION AND WIRING |
| A. Unless specifically noted otherwise on the Drawings or elsewhere in the Specifications, all wiring and all equipment connections shall be provided by the Electrical Contractor. |
| B. The Electrical Contractor shall furnish and install all disconnect switches, NEC circuit protection, relays, and devices as required for all equipment to provide complete and operable electrical systems, unless the items are specifically noted el... |
| C. Electrical Contractor shall verify horsepower, voltage, phase, starting requirements, quantity of wires, and wattage of all equipment which requires electrical connections before equipment purchase or rough-in, and shall install feeders and branc... |
| 3.3 EQUIPMENT INSTALLATION |
| A. All equipment shall be installed at locations indicated and oriented so as to be easily accessible. |
| B. Assembly and installation of equipment shall be in strict accordance with manufacturer's installation instructions. Equipment shall be securely anchored in place. Care shall be exercised to correctly orient equipment before securing in place. |
| 3.4 TRENCHING AND BACKFILL |
| A. Underground Electrical Secondary Services shall be installed in trenching dug specifically for such services. |
| B. The trench shall be dug so that the service shall be laid to the alignment and depth required, and it shall be excavated only so far in advance of installation as can be completed in one day. The width of the trench shall be ample to permit the ser... |
| C. Materials to be excavated shall include earth, rock, or any other material encountered within the limits of trench excavation. No adjustment in the contract price will be made on account of the presence or absence of shale, sandstone, masonry, rock... |
| D. All excavated material shall be piled in a manner which will not endanger the work, and which will avoid obstructing sidewalks and driveways. In general, excavated material shall be piled on the high side of the trench to form a dam to prevent surf... |
| E. The Contractor may use trench digging machinery or employ hand methods but shall employ hand methods in locating underground utilities. |