This is Addendum One for an Invitation to Bid (RFB-244-25) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for a 24038 AMLBAML AML Reclamation Project located in Perry County, Kentucky. The addendum updates the original bid documents, moving the official bid date to May 28, 2025, at 9:30 A.M. Eastern Time, and requires bidders to use a Revised Bid Schedule in lieu of the previously issued version. Additional changes include Revised COR Documents and Revised Davis Bacon Wage Rates, which will be distributed by Lynn Imaging.
The bid schedule includes 36 line items for the project, covering activities such as mobilization, utility relocation/replacement, landscape allowance, traffic control, structure removal/replacement, site preparation, concrete work, silt control, drainage structures, revegetation, and access repair. The project involves reclaiming a slide area along Harvey Lane, which will be stripped to rock and transported to a waste area. Work includes installing rail steel with guardrail lagging to protect buildings, constructing a subdrain, installing HDPE pipes for drainage control, and creating a concrete ditch. The contract length is set at 180 calendar days from the contract award date, with various technical specifications and standard details available on the Division's website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2500000668_1_SO_FORM.PDF | ||
| Final_RFB_785_2500000668_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-244-25
FOR: 24038 AMLBAML
AML Project Perry County, Kentucky
DATE: May 16, 2025
RFB-785-2500000668
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1:
Item 2:
Item 3:
Item 4:
Item 5:
Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Official bid date has been moved to May 28, 2025, at 9:30 A.M. Eastern Time
Bidders must use Revised Bid Schedule in lieu of previously issued.
Revised COR Documents
Revised Davis Bacon Wage Rates
END OF ADDENDUM
Invitation to Bid No. RFB-244-25 For: 24038 AMLBAML
AML Project Perry County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Susan Ward Cross-Out
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1.0 X NA ≤ NA = 40,000.00$
2 UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 20,000.0 X NA ≤ 1.00$ = 20,000.00$
3 LANDSCAPE ALLOWANCE A.C.U. A.C.U. 500.0 X NA ≤ 1.00$ = 500.00$
4 TRAFFIC CONTROL L.S. L.S. 1.0 X $500.00 ≤ NA = $
5 STRUCTURE REMOVAL/REPLACEMENT A.C.U. A.C.U. 10,000.0 X NA ≤ 1.00$ = 10,000.00$
6 SITE PREPARATION U.P. ACRE 2.0 X $750.00 ≤ $ = $
7 SITE PREPARATION- WASTE AREAS U.P. ACRE 2.0 X $750.00 ≤ $ = $
8 60 KSI REINFORCING STEEL U.P. LBS 10,000.0 X $0.75 ≤ $ = $
9 CONCRETE- FORMED & FINISHED U.P. CY 180.0 X $170.00 ≤ $ = $
10 CONCRETE- NON-FORMED & NON-FINISHED U.P. CY 125.0 X $100.00 ≤ $ = $
11 SILT BARRIER - BALES & FENCE U.P. LF 2,320.0 X $1.00 ≤ $ = $
12 PILOT HOLE (3" DIA.) U.P. LF 150.0 X $5.00 ≤ $ = $
13 HOE RAM U.P. HOUR 100.0 X $60.00 ≤ $ = $
14 EARTHWORK U.P. CY 10,000.0 X $1.00 ≤ $ = $
15 CLASS II / III U.P. TON 200.0 X $20.00 ≤ $ = $
16 SUBDRAIN U.P. LF 790.0 X $15.00 ≤ $ = $
17 18" DIA. HDPE PIPE- STANDARD U.P. LF 230.0 X $10.00 ≤ $ = $
18 24" DIA. HDPE PIPE- STANDARD U.P. LF 30.0 X $15.00 ≤ $ = $
19 DROP BOX- CONCRETE U.P. EACH 4.0 X $1,250.00 ≤ $ = $
20 CONCRETE HEADWALL- PIPES ≤36" DIA. U.P. EACH 6.0 X $900.00 ≤ $ = $
21 SOIL DRILLING (15" DIAMETER) U.P. LF 1,860.0 X $0.00 ≤ $ = $
22 ROCK DRILLING (15" DIAMETER) U.P. LF 620.0 X $0.00 ≤ $ = $
23 RAILROAD RAILS- 130 LBS./YD. U.P. LF 2,480.0 X $10.00 ≤ $ = $
24 GUARDRAIL LAGGING U.P. LF 732.0 X $5.00 ≤ $ = $
25 SEEDBED PREPARATION U.P. ACRE 2.0 X $75.00 ≤ $ = $
26 AGRICULTURAL LIMESTONE U.P. TON 25.0 X $20.00 ≤ $ = $
27 FERTILIZER U.P. TON 1.0 X $600.00 ≤ $ = $
28 SEED U.P. LBS 160.0 X $4.00 ≤ $ = $
29 MULCH- STRAW & HAY U.P. ACRE 2.0 X $100.00 ≤ $ = $
30 HYDROMULCH & HYDROSEEDING U.P. ACRE 1.0 X $500.00 ≤ $ = $
31 RESIDENTIAL SEEDING U.P. ACRE 1.0 X $500.00 ≤ $ = $
32 DENSE GRADE AGGREGATE U.P. TON 50.0 X $20.00 ≤ $ = $
33 ROADWAY STONE U.P. TON 300.0 X $20.00 ≤ $ = $
34 BITUMINOUS REPAIR U.P. TON 375.0 X $90.00 ≤ $ = $
24038AMLBAML AML RECLAMATION PROJECT
PERRY COUNTY, KENTUCKY
BID SCHEDULE
REVISED BID SCHEDULE 5/16/2025 RFB-244-25
35 FLOWABLE FILL U.P. CY 14.0 X $35.00 ≤ $ = $
36 ACCESS GATE U.P. EACH 1.0 X $400.00 ≤ $ = $
BID TOTAL = $
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL BID
AMOUNT TO BE VALID.
REVISED BID SCHEDULE 5/16/2025 RFB-244-25
Revised 12/11/2024
COR & BID & BMP 1
24038AMLBAML AML RECLAMATION PROJECT
PERRY COUNTY, KENTUCKY
Written Location Directions: From the Hazard AML office, turn left onto KY-15 N, then turn left onto
KY-15 N/Johnny Cox All-American Drive. Stay on for 7.6 miles, then take a left onto Harvey Lane. The slide and project area will be on the right in approximately 0.1 miles.
To reach the waste area from the project area, return to KY-15 and turn right. Stay on for 2.9 miles, then turn left onto KY-267. In 0.9 miles, make a sharp left turn; the waste area will be at the end of the access road.
Basic Project Description: The slide area along Harvey Lane will be stripped to rock and taken to the waste area. Rail steel with guardrail lagging will be installed to protect buildings above the slide, and pilot holes will be used to determine necessary rail steel length. A subdrain will be constructed on the bench above the slide to redirect water away from the slope. Several new 18” HDPE pipes will be installed to control drainage coming down the hill and in front of the slide. A concrete ditch will be constructed to carry drainage and to protect the road. A new 24” HDPE pipe will be installed under
Harvey Lane to carry drainage to a larger watershed. Other items such as bituminous repair, silt control fence, revegetation, and others are included to address construction activities.
A. STANDARD DOCUMENTS
The AML Standard Details, Technical Specifications, and Bid Item Descriptions are posted on the
Division’s website at https://eec.ky.gov/aml
Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.
B. ALLOWABLE PRICE LIMIT
The lowest Allowable Price Limit (APL) is listed on the Bid Schedule as part of the bid documents. Unit
Price, Plan Quantity, and Lump Sum are all methods of payment. Significantly low or high values entered by the CONTRACTOR on the Bid Schedule may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
An example would be if a CONTRACTOR assumes there may not be a need for the entire design quantity for Roadway Stone and entered a $10 value for Roadway Stone when the cost at the quarry is significantly higher. Another example would be if the CONTRACTOR enters a value of $30 per linear foot for “SILT BARRIER - BALES & FENCE” to front load payments for work items used near the beginning of the project. The CONTRACTOR is also cautioned that other considerations for rejection may be enforced such as the low bid being higher than the budgeted dollar amount for this project.
C. CONTRACT LENGTH
All work shall be completed within one hundred eighty (180) calendar days from the effective date of the
Award of Contract. Within the bounds of prudent project performance, it shall be the responsibility of the
CONTRACTOR to plan and implement construction sequences which follow the intent of these
CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special Conditions and to protect any portion of the contract which may be completed before others.
https://eec.ky.gov/aml
COR & BID & BMP 2
D. CONTRACTOR’S INFORMATION SHEET
The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/Subcontractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive.”
E. SPECIAL CONDITIONS & PROJECT NOTES
- When applicable, AML is responsible for payment to the Imperiled Bat Conservation Fund
(ICBF). The CONTRACTOR will be responsible for adhering to the boundary for which payment was made and confirming with AML the acreage of trees removed.
- On occasion, a property owner may require a CONTRACTOR to add them on their General
Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the
CONTRACTOR when this requirement is being made by the property owner. In these cases, the
CONTRACTOR must submit to AML copies of their certificate of insurance documenting the
“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.
- A modified concrete ditch will be used for a portion of this project. An adjusted detail is included as part of the planset documents.
F. DAVIS BACON SCALE WAGES
The CONTRACTOR and all SUBCONTRACTORS are required to pay scale wages as defined in the contract documents. If all employment categories that may be used have not been listed and specified in the contract document, then the contractor must make his best determination of what the missing wage rate will be. Subsequently after the bid is awarded, the contractor must request the specific rate from the
Department of Labor. AML will not issue change orders for additional compensation if the wage rate determined by DOL is higher than the rate the contractor used to develop his bid. If wage rates are not included for a specific category, AML suggests that the contractor assume the highest operator or laborer wages that are listed when developing his bid.
G. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.
(Check all that apply)
☒KYTC Encroachment Permit
☐KY DOW Water Permits
☐USACE Permit
The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project. The
CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, COR & BID & BMP 3 and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the CONTRACTOR. Please refer to
“General Provisions” in the AML Technical Specifications.
COR & BID & BMP 4
BID ITEM DESCRIPTION
24038AMLBAML AML RECLAMATION PROJECT
PERRY COUNTY, KENTUCKY
NO ITEM DESCRIPTION
1 MOBILIZATION This item consists of the mobilization and demobilization of the
CONTRACTOR’S forces and equipment in accordance with the
“Mobilization/Demobilization” AML Standard Technical Specification. The amount of this bid item is not to exceed 5 percent of the sum of the lump sum bid price.
Measurement: Not Applicable.
Payment: Payment shall be made at increments set in the AML Technical
Specifications totaling the Lump Sum price.
2 UTILITY
RELOCATION /
REPLACEMENT
This consists of furnishing all materials, equipment, and labor necessary to replace utilities damaged by construction or relocate any utilities that are in the construction area in accordance with the “Utility Relocation” AML Standard
Technical Specification. The CONTRACTOR is required to supply the
ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable.
Payment: Payment shall be made for Actual Documented Costs for
“UTILITY RELOCATION/REPLACEMENT” approved by the
ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
COR & BID & BMP 5
3 LANDSCAPE
ALLOWANCE
This item of work shall consist of furnishing all materials, equipment, and labor necessary to replace damaged landscape structures, plants and trees as depicted on Drawings and as directed by ENGINEER in accordance with the
“Revegetation” AML Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Conduct a picture inventory of landscape items that may be affected before construction starts and keep an item list of those landscape items that are affected.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable
Payment: Payment for Actual Documented Costs “LANDSCAPE
ALLOWANCE” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for the removal/replacement of landscape features as approved/directed by the ENGINEER in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
4 TRAFFIC CONTROL This item consists of maintaining and controlling traffic on existing roads
(public and private) affected by this project as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Traffic Control” AML
Standard Technical Specification. Appropriate signs shall be erected at the project limits and flag persons shall be used as needed.
Special Considerations: None
Major Incidentals: Signs, flaggers, steel plates, immediately clearing debris from roadway.
Measurement: Not Applicable.
Payment: Payment shall be made at the Lump Sum price bid for “TRAFFIC
CONTROL” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.
COR & BID & BMP 6
5 STRUCTURE
REMOVAL/
REPLACEMENT
This item represents the ENGINEER'S best estimate of removal/replacement cost of designated qualifying structural features “in kind” to facilitate normal construction activities as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Structure Removal / Replacement” AML
Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Inventory of structures, pictures, and dimensions, before construction starts. Any structures that are removed shall be accompanied by pictures.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: None
Payment: Payment shall be made for Actual Documented Costs for
“STRUCTURE REMOVAL/REPLACEMENT” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
6 SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 7
7 SITE
PREPARATION-
WASTE AREAS
This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, access improvement/construction, in-kind fence repair/replacement.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION- WASTE AREAS” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
8 60-KSI
REINFORCING
STEEL
This item consists of furnishing all materials, equipment, and labor necessary to properly installing 60 KSI reinforcing steel of various diameters and lengths as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” and “Steel” AML Standard Technical Specifications.
This bid item covers steel used for: reinforcement in concrete ditches (all types), footers, retaining walls, concrete piles & cap reinforcement, anchors, Special Considerations: See AML Technical Specification for overlap Steel
Item 2.2.6.
No splicing shall be permitted for length of steel less than 10 feet in length.
Splicing of lengths between 10 feet and 20 feet is allowed. No lengths less than
4 feet is allowed including the overlap.
For lengths greater than 20 feet splicing is allowed. Minimum length of steel shall be 10 foot including overlap.
Maximum of 10 % payment for overlap steel.
Major Incidentals: Coatings, excess steel, connections, cut-offs, testing, and waste materials
Measurement: Actual Quantities shall be measured as pounds of reinforcing steel placed and accepted by the ENGINEER. Actual Quantities may be obtained by using a CRSI chart that shows lbs/lf for each size bar and multiplying the length of each bar used.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “60-KSI REINFORCING STEEL” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment as specified shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 8
9 CONCRETE-
FORMED &
FINISHED
This item consists of furnishing all materials, equipment, and labor necessary to construct concrete field cast items as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” AML Standard
Technical Specification. This bid item covers concrete used for: concrete ditches (all types), retaining walls (all types), footers, caps, and any other purpose that requires formwork and/or finishing. All formwork, no matter the size/scale or changes are incidental, including increases in heights of walls.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Formwork (including height/width increases), admixtures, finishing, materials testing.
Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price for “CONCRETE- FORMED & FINISHED” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
10 CONCRETE- NON-
FORMED & NON-
FINISHED
construct concrete field cast items as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” AML Standard
Technical Specification. This bid item covers concrete used for piles, encasements.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Formwork, admixtures, materials testing.
Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price for “CONCRETE- NON-FORMED & NON-FINISHED” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
COR & BID & BMP 9
SILT CONTROL
11 SILT BARRIER–
BALES & FENCE
This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML
Standard Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.
Special Considerations: None
Major Incidentals: Maintenance, silt fence trenching and removal
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and
EARTHWORK
12 PILOT HOLE
This item shall consist of furnishing all materials, equipment, and labor for drilling 3-inch minimum (6-inch max.) diameter bore holes to determine depth of solid bedrock as depicted on Drawings and as directed by the ENGINEER.
Furthermore, the equipment utilized shall be able to bore through small rock and other debris as required.
Special Considerations: None
Measurement: Actual Quantities shall be measured as next whole linear foot drilled and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “PILOT HOLE” in accordance with the “General constitute full compensation for materials, equipment, labor, and incidentals.
COR & BID & BMP 10
13 HOE RAM This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of rock utilizing a hoe ram as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Equipment” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Equipment, operator, fuel, maintenance items
Measurement: Actual Quantities shall be measured as the next whole equipment hour when required to construct ditches and other features approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HOE RAM” in accordance with the “General constitute full compensation for materials, equipment, labor and incidentals.
14 EARTHWORK This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades shown as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: Actual Quantities shall be measured as the next whole cubic yard excavated calculated using "before and after" field-run surveys ONLY.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EARTHWORK” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work; this includes all transportation of excavated materials as required and gradework efforts associated with designated waste areas.
COR & BID & BMP 11
DRAINAGE CONTROL
SURFACE DRAINAGE
15 CLASS II / III –
This item consist of furnishing all materials, equipment, and labor necessary to install Class II and Class III rock as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” and “Ditches” AML Standard Technical
Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report %
CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton.
Material exceeding the 85% minimum is not adjusted.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II/III” in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
SUBSURFACE DRAINS
16 SUBDRAIN This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface
Drains” AML Standard Technical Specifications.
Special Considerations: None
Major Incidentals: Excavation to depth of 3’, pipe, filter fabric, aggregate backfill to depth of 3’.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER. Subdrains requiring more than the incidental quantity of rock will be paid from the No. 2 Stone bid item or
Roadway Stone if a No. 2 Stone bid item is not listed. All excavation is incidental to the earthwork.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SUBDRAIN” in accordance with the “General
COR & BID & BMP 12
18” HDPE PIPE-
STANDARD
This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the
Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout
Products”, and “Pipe” AML Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
24” HDPE PIPE-
STANDARD
This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the
Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout
Products”, and “Pipe” AML Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
COR & BID & BMP 13
19 DROP BOX-
CONCRETE
This item consists of furnishing all materials, equipment, and labor, necessary to construct concrete drop boxes as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with the “Drop /
Junction Boxes” AML Standard Technical Specifications up to a depth of 8’.
Special Considerations: None
Major Incidentals: Concrete, steel reinforcement, grout, formwork, aggregate backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “DROP BOX-CONCRETE” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, 20 CONCRETE
HEADWALL- PIPES
≤36” DIA.
This item consists of furnishing all materials, equipment, and labor, necessary to construct the headwalls as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete
Headwalls” AML Standard Technical Specification. Units cast in the field require fiber, pre-cast units require manufacturer certification that concrete meets or exceeds required strength.
Special Considerations: None
Inspector Notes: For pre-cast units collect manufacturer certificate (includes strength of concrete used).
Major Incidentals: Concrete, steel reinforcement, fiber, grout, formwork, dissipaters, backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CONCRETE HEADWALL- PIPES ≤36”
DIA.” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
21 SOIL DRILLING (15”
DIAMETER)
This item consists of work shall consist of furnishing all materials, equipment, and labor necessary to drill boreholes the required diameter through soil as depicted on the Drawings and as directed by the ENGINEER.
Special Considerations: None
Measurement: Actual Quantities shall be measured as the next whole linear foot drilled and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SOIL DRILLING” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals necessary to complete this item as required.
COR & BID & BMP 14
22 ROCK DRILLING
(15” DIAMETER)
This item consists furnishing all materials, equipment, and labor necessary to drill boreholes the required diameter through 10 feet of competent rock as depicted on the Drawings and as directed by the ENGINEER.
Special Considerations: None
Measurement: Actual Quantities shall be measured as the next whole linear foot drilled and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROCK DRILLING” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals necessary to complete this item as required.
DRILLING & WALL STRUCTURES
23 RAILROAD RAILS-
130 LBS/YD
install the railroad rail steel as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Barrier- Rail/Steel Panel Wall” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “RAILROAD RAILS- 130 LBS/YD” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, 24 GUARDRAIL
LAGGING
This item consists of furnishing all materials, equipment, and labor necessary to install guardrail (Steel “W” Beam) as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Guardrails” AML Standard
Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “GUARDRAIL LAGGING” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment incidentals necessary to complete this item as required.
COR & BID & BMP 15
REVEGETATION
25 SEEDBED
PREPARATION
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEEDBED
PREPARATION” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
26 AGRICULTURAL
LIMESTONE
These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. DAML will use the current Limestone
Sample Results published by the KY Department of Agriculture to determine a
Relative Neutralizing Value (RNV) for weight adjustment.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Application and incorporation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.) aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "AGRICULTURAL
LIMESTONE” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 16
27 FERTILIZER
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, 28 SEED and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Seed mixture will be listed on the
Drawings, Project Description, and/or Special Conditions.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals:
Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEED” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and
29 MULCH- STRAW &
HAY
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 17
30 HYDROMULCH &
HYDROSEEDING
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Seed, fertilizer, agriculture lime, and mulch
Measurement: Actual Quantities shall be measured to the next half acre approved and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for “HYDROMULCH &
HYDROSEEDING” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
31 RESIDENTIAL
SEEDING
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Seedbed preparation, agriculture limestone, fertilizer, seed, and mulch
Measurement: Actual Quantities shall be measurement as the next tenth of an acre seeded as approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “RESIDENTIAL SEEDING” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and
ACCESS REPAIR & SAFETY
COR & BID & BMP 18
32 DENSE GRADE
AGGREGATE
This item shall consist of furnishing all materials, equipment, and labor necessary to place, and compact dense grade aggregate (DGA) as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” AML Standard Technical Specification.
Special Considerations: This item is for temporary paved roadway repairs and base preparation prior to bituminous repair. DGA for pipe backfill is incidental to the pipe.
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of aggregate installed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for "DENSE GRADE AGGREGATE FOR ROADWAYS” in accordance with the “General Provisions” AML Standard Technical equipment, materials, and incidentals.
33 ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining” AML Standard Technical
Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROADWAY STONE” in accordance with the “General
34 BITUMINOUS
REPAIR
This item shall consist of furnishing all materials, equipment, and labor necessary to repair bituminous surfaces damaged by construction activities as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Bituminous Repair” AML Standard Technical Specification.
Removal and disposal of old materials are covered under the site preparation bid item.
Special Considerations: None
Major Incidentals: DGA, subgrade preparations, materials, placement
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of bituminous placed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “BITUMINOUS REPAIR” in accordance with the “General
COR & BID & BMP 19
35 FLOWABLE FILL This item shall consist of furnishing all materials, equipment, and labor for the purpose of backfilling culverts across roadways and at headwalls as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Grout
Products” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Steel plates for traffic.
Measurement: Actual quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “FLOWABLE FILL” in accordance with the “General
36 ACCESS GATE This item of work shall consist of furnishing all materials, equipment, and labor necessary for access gate installation/construction as depicted on the Drawings and as directed by the ENGINEER in accordance with “Access Gate” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Materials (gate, post, hardware, concrete), placement
Measurement: Actual Quantities shall be measurement as “EACH” gate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for "ACCESS GATE” in accordance with the “General
COR & BID & BMP 20
Erosion and Sediment Control
Best Management Practices (BMP) Plan
January 2017
COR & BID & BMP 21
OVERVIEW
This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned
Mine Lands (DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML)
Reclamation and Acid Mine Drainage (AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical Specifications and Standard
Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.
This general BMP document is to outline the various pollution prevention measures used on
AML Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES
Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas
(DDAs) and related information. The construction notes and project description may describe other control measures. The Contractor and Engineer may select an additional BMP for the project as the project changes and construction progresses. Projects that do not have DDAs annotated in the plans will employ the same concepts selecting and implementing this general
BMP plan.
Address disturbed areas or sources of sediments by the most effective means in the specific work area. Direct non-storm water discharges to sediment basins/traps or to a filter fence enclosure in a flat vegetated infiltration area or filtered via another approved commercial product. All deep mine and surface impoundment water will be tested and treated, when as necessary, to meet the
DAML Water-Treatment and Disposal Technical Specification unless stricter limitations are listed in an existing Total Daily Maximum Load (TMDL) limit.
PERMITS
The DAML shall review each project during project development to determine whether any permits are required to implement the project work. When a permit is required, DAML will make every effort to obtain the permit prior to letting the project for bidding. Permit specific conditions shall trump any standard conditions and/or practices. All permits must be maintained onsite and produced when requested by regulatory authorizes inducing representative of the permitting authority.
Common permits types for DAML projects:
COR & BID & BMP 22
• 401 Water Quality Certification (WQC) o Issued by the KY Division of Water
• 402 KY Pollution Discharge Elimination System (KPDES) o DAML activities are covered under the AML KPDES General Permit
• 404 US Army Corps of Engineers (USACE) o Issued by the US Army Corps of Engineers- Nashville District, Louisville District, or Huntington District (Depending upon major drainage basin)
• KY Stream Construction (Floodplain) o Issued by the KY Division of Water
• Local Floodplain Permit o Issued by the County/Municipality
• Local Storm Water Construction o Issued by the County/Municipality
A) Field Review Walk-Thru:
The DAML will conduct a project review between the Project Engineer, Construction Branch
Personnel, Project Design Technician, and Field Office Staff, to review the construction plans and identify any changes needed prior to letting the project for bidding. The group will evaluate the locations and types of site specific BMP and any other erosion prevention and sediment control measures chosen for incorporation into the final design plans.
B) Site Visit Meeting
DAML will present the project specific BMP and permit requirements/conditions to the potential contractors during the site visit meeting.
C) Pre-Construction Conference
Prior to the actual beginning of the project, DAML will hold a pre-construction conference between representatives of the DAML, the Contractor, including any Subcontractors, as well as other interested agencies and parties. Items discussed will include the time and sequence for construction, planned methods of operation, payment, and other relevant questions including any permit requirements and the erosion and sediment control plan.
D) Construction Access
This is the first land-disturbing activity. Construction entrances shall be a minimum of twenty
(20) feet wide by fifty (50) feet long, measured from the shoulder of the public road, and consist of No. 2 aggregate over a heavy weight non-woven filter fabric base. As soon as construction begins, stabilize bare areas with gravel and temporary mulch and/or vegetation.
E) Clearing and Grubbing
Use the following techniques for clearing and grubbing activities:
COR & BID & BMP 23
1) Leave areas undisturbed when possible.
2) Construct silt basins to provide silt volume for large areas.
3) Construct Silt Trap(s) Type A for small areas.
4) Construct Type B silt traps for areas with rapid runoff and sediment-laden runoff.
5) All silt traps should have a 3:1 flow length to width ratio. Add spreader bars, baffles, or turbidity curtains to maintain the flow path ratio when site conditions require traps sizes smaller than the standard detail dimensions.
6) Install geotextile bags and/or rock checks in front of existing drop inlets.
7) Construct diversion ditches to catch sheet runoff and carry it to basins or traps or to divert it around areas to be disturbed.
8) Maintain brush and/or other barriers to slow and/or divert runoff.
9) Construct silt fences/hay bales to catch sheet runoff on short slopes. For longer slopes, multiple rows of silt fence/hay bales may be considered.
10) Apply temporarily mulch to area not actively being disturbed or for any area left undisturbed for fourteen (14) days.
11) Employ non-standard or innovative methods.
F) Stream Crossings / Work Along Streams
1) Temporary low-water stream crossings follow the guidelines included in the DAML
Technical Specifications and those established by the KY Division of Water Floodplain
Management Section. Removal of a temporary crossing may be required to accommodate large storm events.
2) Do not completely block stream flow (even temporary). Instead, utilize some form of pass thru mechanism during all AML projects.
3) Work within a stream channel shall not cause flooding of properties upstream, downstream or within the project area or cause downstream water quality degradation. Minimize equipment contact time with the stream water by diverting water around equipment working in or along streams.
4) No flowing water will interact with any uncured concrete placed in the stream channel.
5) Divert all stream water around the work areas in accordance to methods listed in the DAML
Stream Protection & Relocation technical specification, AML Standard Details Section 60, and as by the appropriate permit guidelines.
6) Temporary out of channel stream diversion must use one of the three approved methods:
pipe diversion, sandbag/stone channel diversion, and/or fabric-based channel diversion.
Do not construct any temporarily diverted channel on bare, erodible soil. No temporary diversion shall be permanent without a 401, 404, and other appropriate permits.
COR & BID & BMP 24
G) Deep Mine and Surface Water Impoundments
The DAML Resident Inspector will test the mine water from deep mines and surface impoundments on the project area to determine the pH and total iron content. Treat the water until it meets the DAML Water-Treatment and Disposal Technical Specification or an existing TMDL, whichever is stricter, before release through a silt control structure(s).
Monitoring &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .