Addendum One .pdf

PDF 803 KB Posted

Attached to
RFB-231-25 KVA KVCN Roof Replacement
Solicitation number
RFB-785-2500000641-2
Issued by
Grant County, Kentucky

About this file

This document is Addendum No. One for the Kentucky Veteran Cemetery Roof Replacement project, issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration. The addendum, dated May 12, 2025, provides clarifications and responses to potential bidders' questions regarding the roof replacement at the Kentucky Veteran Cemetery in Williamstown. Key clarifications include approval of synthetic slate alternatives from manufacturers like Brava, DaVinci, and EcoStar, confirmation that the roof does not actively leak, and specifications about existing roof components that can remain in place.

The addendum addresses multiple technical details about the roof replacement, including slate shingle dimensions, flashing requirements, and existing structural components. Important specifications include that slate width shall match existing shingles, hip and ridge flashing shall match existing configuration, and most existing site elements like gutters, drip edges, and downspouts are to remain. The project involves replacing the slate roofing while maintaining the overall aesthetic and structural integrity of the Kentucky Veteran Cemetery facility. Bidders are directed to refer to specific specification sections for additional detailed requirements, such as snow guard information in Specification 073126.

View the file

Other files

File Type Posted
Final_RFB_785_2500000641_1_SO_FORM.PDF PDF
Final_RFB_785_2500000641_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-231-25

FOR: Roof Replacement Kentucky Veteran Cemetary Department of Veteran Affairs Williamstown, Kentucky

DATE: May 12, 2025

RFB-785-2500000641

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-231-25 For: Roof Replacement Kentucky Veteran Cemetary Department of Veteran Affairs Williamstown, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Morris Workshop Architects | 151 N. Eagle Creek Drive | Suite 105 | Lexington, Kentucky | 40509

859.300.3745 | www.morrisworkshop.com

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00 Commonwealth of Kentucky MWA Project Number: 2425 205 Eibeck Lane, Williamstown, KY 41097 Addendum #1

KVA – KVCN Roof Replacement

Addendum #1 Issued: May 12, 2025

BIDDER QUESTIONS:

1. Is this 12" system in length or width? What is the exact size of the tile sought as slates do not appear to be 12" wide. Roof is to be replaced "in kind" w/ new slate shingle roof. I believe the specific product sought is Certainteed Symphony Slate which is discontinued and no longer in use. Are we looking at Brava, Enviroslate, DaVinci, EcoStar or similar type of product which is Class 4, but not an exact look match. Please advise the exact product sought as Certainteed Symphony Slate has been discontinued and no longer produced.

A: 12” minimum width. depending on the manufacturer. Per substitution below, synthetics slates will be approved as manufactured by Brava, DaVinci, and EcoStar.

2. Does the roof actively leak? Reference to 2 sheets OSB, however our representative stated that the roof deck looked like a composite system of bonded OSB to ISO. Underside of deck says 5/8" Fiberock which is a tile backer and not typically located on a roof. How is the OSB secured as I see no fasteners under side of deck? Please advise.

A: The Roof Does not actively leak. The roof is secure to a sandwiched Structurally Insulated panel system (SIPS). Bidders shall not account for new sheets of OSB sheathing on their bids.

3. Detail 13 & 15/A200 calls for "new Stainless Steel Metal Roofing System" yet A120 does not reference this detail in the coded notes. It would appear these can be re-used. Please advise.

A: Referenced metal roofing is to remain in place.

http://www.morrisworkshop.com/

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

4. Plans read that we are to remove and replace the gable and drip aprons. In theory keeping with the description these should be able to remain. Can we maintain the existing or should it be replaced? Please advise.

A:Gable and Drip Aprons to remain in place unless damaged/compromised.

5. Are the snow guards to be an exact match of the existing? If so can you please provide brand name and type. Please advise.

A: Snow guard description is provided in Specification 073126 – 2.5

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

6. Hip, Ridge & Valley Metal: Existing Hip & Ridge is rolled, existing valley is W. I can find no detail associated with its attachment mechanism. Please advise. Is the new Hip & Ridge to be rolled as well? Please advise.

A: Hip, Ridge, and Valley flashing shall match existing in configuration, shape, and attachment. Refer to Clarifications below and the latest version of Slate Roof Design and Installation Manual for details not shown.

7. The bid form requires a square foot price for plywood decking replacement. The plans indicate the roof deck is a structural insulated panel. Please clarify the type of decking that should be included in the unit price.

A: Unit Price requirement is not applicable and shall be removed.

8. Coded Note 4 on Sheet A120 and Detail 14/A200 call for the new zinc-tin coated stainless steel downspouts. To our knowledge this material is no longer available. Zinc-Tin Coated Copper is available, and Tin Coated Stainless Steel is available from an overseas manufacturer. Please provide an alternative.

A: No new downspouts are to be provided with this project. Note #4 is not used.

9. Coded Note 4 on Sheet A120 refers to a 4 x 5 cast iron boot. Are we to include new cast iron boots in our bid?

A: No new downspouts are to be provided with this project. Note #4 is not used.

10. General Note 5 on Sheet A120 requires new concrete splash blocks. Please clarify if the splash blocks are to be used or if the downspouts are to be connected to existing (or new) cast iron boots.

A: Existing downspouts and site drainage shall remain the same. No new splash blocks required.

11. Please clarify the type and gauge of prefinished/ painted metal to be used for the flashings and hip and ridge cap flashings.

A:Refer to question #6 above. Flashing shall meet minimum thicknesses provided in 2015 IBC Chapter 15 for code compliance.

12. Detail 13/A200 calls for new stainless steel metal roofing system. Please specify the finish and gauge of stainless steel to be used.

A: Referenced metal roofing is to remain in place.

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

13. Coded Note 13 on Sheet A120 calls for new snow guards around the entire perimeter. Is there a minimum number of rows and spacing to be installed (pattern)? Please also specify the type of material the snow guards are.

A: Snow guard information is in the Slate Shingle Specification - 073126.

14. Will you accept an 18 x 9 slate? (If an 18” slate is laid with a 3” Head lap the exposure is 7.5”.) The existing slate appears to be Virginia Buckingham slate which is not currently available.

A: Width shall match existing slate shingles

15. Will you accept alternative slate types? For example, Spanish Black (Cupa), Grayson Unfading

Black (very similar to Buckingham)?

A: Style to be similar to existing.

16. In reading thru the description it states "flashing, gutters and spouts" are expected to remain in place. Please confirm.

A: Flashing on the roof (hip, ridge, valley, and pentrations through slate) are to be replaced. Gutters, drip edges, gable faces, and downspouts are expected to remain.

ARCHITECTURAL

Substitution Request:

1. Synthetic Slates as manufactured by Brava, DaVinci, and Ecostar will be allowed as alternates provided they meet all of the performance requirements of the specification (Warranty, Color fading, etc)

Clarifications:

1. Existing conditions as originally drawn indicated on the following sheets:

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

KVA – KVCN Roof Replacement DECA Account Number: 074-CBV3-NE02-00

END OF ADDENDUM #1

Addendum One
2425 - KDVA Roof - Addendum #1