Addendum One .pdf

PDF 2 MB Posted

Attached to
RFB-233-25 KCTCS - Chiller Replacement Regional Postsecondar
Solicitation number
RFB-785-2500000648-2
Issued by
Hardin County, Kentucky

View the file

Other files

File Type Posted
Final_RFB_785_2500000648_1_SO_FORM.PDF PDF
Final_RFB_785_2500000648_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-233-25

FOR: KCTCS - Chiller Replacement Regional Postsecondary Center Elizabethtown Community and Technical College Elizabethtown, Kentucky

DATE: May 2, 2025

RFB-785-2500000648

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-233-25 For: KCTCS - Chiller Replacement Regional Postsecondary Center Elizabethtown Community and Technical College Elizabethtown, Kentucky

Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration

RPC CHILLER REPLACEMENT

ELIZABETHTOWN COMMUNITY & TECHNICAL COLLEGE

ELIZABETHTOWN, KENTUCKY

MARCUM NO. 24573

MECHANICAL AND ELECTRICAL ADDENDUM 1.00

MAY 1, 2025

The following Addendum Items shall be made part of the Contract Documents for the referenced project.

1.01 Delete Section 260548 Vibration and Seismic Controls for Electrical Systems.

1.02 Refer to Drawing M0.1. Delete Mechanical Tag Note 8.

1.03 Responses to Questions:

a. The plans call for Category D seismic restraints and bracing, but the specs do not call for seismic at all. Should there be any seismic design on the system?

i. Seismic design category is B, not D. See corrections above. No seismic restraint is required for electrical and mechanical for seismic design category B.

b. The air separator wasn�t specified on the schedule page. Can we get a spec on which air separator you would like us to install?

i. Air separator is specified on M4.1 Hydronic Piping Flow Schematic.

Attachments:

1. Site Visit Meeting Notes

2. Site Visit Sign-in Sheet

END OF ADDENDUM 1.00

ECTC RPC CHILLER REPLACEMENT

ELIZABETHTOWN, KENTUCKY

MARCUM NO. 24573

SITE VISIT MEETING NOTES

APRIL 28, 2025

DECA Project Manager Philip Hurt introduced the project.

• eComm must be used for project documentation.

• Work progress must be documented at least weekly under “Daily Activities” of eComm.

• Two project meetings are anticipated each month: one via Teams and one in person.

Marcum Engineering Project Manager Jwain White summarized the work scope.

KCTCS representative Cody Warren added comments about the campus’ expec-tations:

• No fraternizing with students.

• No smoking on campus

• Contractor personnel to wear logos indicating company

Questions:

1. Who performs controls?

a. Answer: Core Controls will perform building automation system work. Bidders are to include the allowance for Core Controls as specified.

2. How will weather days be handled, especially considering the risk of winter weather during the limited chilled water shutdown period.

a. Answer: DECA will consider extending contract duration for weather days that interfere with work if those conditions are documented. Weather at the site should be documented under “Daily Activities” section of eComm. KCTCS will work with the contractor regarding weather interruptions, but the expectation is that the replacement involving shutdown can be performed during the indicated window of dates.

3. Are return site visits allowed?

a. Answer: Cody Warren of KCTC can coordinate additional site visits during the bidding period with ECTC. His contact information is: 270-723-0404 cell and emai cody.warren@kctcs.edu

Site walk included:

• Outdoor chiller

• Mechanical room

• Electrical room

• Corridor between electrical room and mechanical room

• Classroom and storage room anticipated for conduit routing

• Storage room where chilled water tees with valves will be installed for future connection

• Second floor mechanical room with AHUs where differential pressure sensor will be installed.

Sign-in list is attached.

End of Site Visit Notes

Addendum One
ECTC Chiller Addendum 1.00
2025-05-01 ECTC Chiller Addm 1.00
ECTC Chiller 2025-04-28 Site Visit Meeting Notes
Chiller Site Visit Sign In List

File details come from the government source that posted it. Updated .