- Solicitation number
- RFB-785-2500000089-3
- Issued by
- Franklin County, Kentucky
About this file
This document is an addendum issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the Interior and Restroom Modernization project at the Ravenna Readiness Center, Department of Military Affairs, in Estill County, Kentucky. The addendum provides clarifications and revisions to the original invitation to bid, including striking references to demolition of gas lines, the owner providing a temporary vault and furniture moving assistance, changes to the casework specification, and details on the installation of steel plates in the vault. An MEP addendum is also included, which addresses contractor questions about temporary bathroom facilities and gas line removal. The addendum is part of the contract documents, and bidders must acknowledge receipt in their proposal.
The addendum also includes a specification for the epoxy flooring system, which is a 3/16-inch textured epoxy surfacing with a decorative quartz broadcast finish. The specification details the required physical properties, mixing, and application of the flooring system. Bidders must provide samples and certified test results demonstrating compliance with the specified requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2500000089_3_SO_FORM.PDF | ||
| Final_RFB_785_2500000089_2_SO_FORM.PDF | ||
| Addendum Two .pdf | ||
| Final_RFB_785_2500000089_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-50-25
FOR: Interior and Restroom Modernization Ravenna Readiness Center Department of Military Affairs Estill County, Kentucky
DATE: August 27, 2024
RFB-785-2500000089
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-50-25 For: Interior and Restroom Modernization Ravenna Readiness Center Department of Military Affairs Estill County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO. 1
August 27, 2024
To: All Planholders
From: alt32 Architecture
310 Old Vine Street, Suite 300
Lexington, KY 40507-1534
Re: Ravenna Readiness Center Restroom Modernization
This addendum is:
(12) pages of 8 ½” x 11”
The purpose of this addendum is to clarify further the contract documents. The contractors are governed by the information in the addendum. The addendum is part of the contract documents. The bidders shall acknowledge receipt of the addendum on their form of the proposal.
1. Reference to the demolition of gas lines to former boiler on Sheet A2
Demolition note #14 shall be stricken. See MEP addendum.
2. The owner will provide a temporary vault so that the existing vault will be accessible for new work.
3. Owner will provide forces to assist (be responsible for) with moving existing furniture/ storage out of spaces to be renovated.
4. Owner will not remove fixed storage cages. If contractor opts to move storage cages to preform work, contractor must protect, store, and reinstall storage cages to match previous existing conditions.
5. Lockers MFG shall be added to the list of manufacturers for Specification
Section 105113.
6. See attached specification for the Epoxy Flooring referenced in the finish schedule for the existing corridor.
7. Reference to AWI Certification requirement in the casework spec shall be stricken. This requirement is waived. Contractor shall conform to AWI
Standards.
8. The ¼” steel plate referenced is to be installed on the vault deck and vault floor per drawing details to bring existing vault into compliance with owners needs. The contractor shall submit shop drawings of the steel to show plate layout, size of the plates, location of the welds and spacing of the anchor bolts. Contractor shall have the option to place steel plate on top of the concrete deck of the vault or on the inside ceiling of the vault.
ATTACHMENTS INCLUDED BELOW.
MEP Addendum, 096700- Fluid Applied Floor Specification
2265 Harrodsburg Road, Suite 402 • Lexington, KY 40504 Office 859.402.0221 • www.cceky.com Pg. 1
ADDENDUM ONE – MECHANICAL AND ELECTRICAL
To: All Plan Holders
From: Luke Powell, PE Connolly Consulting Engineers, PLLC
Project: Ravenna Readiness Center Restroom Modernization Acct #095-CBAQ-RA02-00 Ravenna, KY
Release Date: August 27, 2024
This addendum is issued before award of contract to inform the bidders of revision/clarification to the bidding documents. All requirements contained in the bidding documents shall apply to this addendum, and the general character of the work called for in this addendum shall be the same as originally set forth in the applicable portions of the bidding documents for similar work, unless otherwise specified under this addendum. All incidental work necessitated by this addendum as required to complete the work shall be included in the bids, even though not particularly mentioned in this addendum. This addendum is hereby made a part of the bidding documents and shall be included in the contract and submitted with the proposal or bid. Bidder must acknowledge receipt of this and any other addenda issued related to the project in their proposal or bid.
Contractor Questions.
Temporary Bathrooms: How many male/ female fixtures are required? How many Showers?
Contractor shall provide a 3-station heated/cooled temporary toilet/shower facility that is suitable for at least 3-users with a minimum of three toilets and three showers. Contractor shall provide all necessary plumbing and electrical connections to the temporary trailer. Contractor shall include in his bid price all costs associated with this rental trailer, including periodic refilling of propane tanks, drain the grey/black tanks weekly, and all setup and removal costs. The trailer rental period shall be for the entire duration of the project, until substantial completion.
During the site visit we noticed that there is an existing floor drain located in the vault.
Remove the existing floor drain and provide a new floor drain flush with the new steel plate floor.
2265 Harrodsburg Road, Suite 402 • Lexington, KY 40504 Office 859.402.0221 • www.cceky.com Pg. 2
There was a question about the extents of removal of the under-slab gas lines and abandoned fuel lines that supplied old boiler.
The design intent is to leave the abandoned under-slab fuel oil piping in place. No new work associated with this piping.
End of Addendum One Mechanical and Electrical
DMA - Ravenna RC Interior Modernization Project August 2024
Ref # 095-CBAQ-RA02-00
FLUID APPLIED FLOORING 096700 - 1
SECTION 096700 – FLUID APPLIED FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Fluid applied seamless flooring and integral formed base.
2. Joint, edge, and termination strips.
3. Prior to work, Contractor to solicit the manufacturer for product literature that explains the substrate requirements for the existing concrete slab and or existing surfaces. See
INSPECTION in Part 3.
4. Locate all flexible joints required. See submittals below.
5. Accessories necessary for complete installation.
1.02 REFERENCE STANDARDS
The publications listed below from a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. American Society for Testing and Materials (ASTM) Publications:
C-307 Test Method for Tensile Strength of Chemical-Resistant Mortars.
C-501 Test Method for Relative Resistance to Wear Unglazed Ceramic Tile by the Taber
Abraser.
C-531 Test Method for Linear Shrinkage and Coefficient of Thermal Expansion of Chemi-cal-Resistant Mortars, Grouts, and Monolithic Surfacing.
C-579 Test Methods for Compressive Strength of Chemical-Resistant Mortars and Mono-lithic Surfaces.
C-580 Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant
Mortars, Grouts, and Monolithic Surfacing.
C-884 Test Method for Thermal Compatibility Between Concrete and an Epoxy Resin
Overlay.
FLUID APPLIED FLOORING 096700 - 2
D-570 Water Absorption of Plastics.
D-695 Compression Properties of Rigid Plastic.
B. Military Specifications (Mil. Spec.)
MIL D-3 134 F (Impact Resistance) Section 4.7.3.
MIL D-3 134 F (Indentation Resistance) Section 4.7.4.
MIL D-3234 F (Resistance to Elevated Temperature) Section 4.7.5.
C. ACI 301 Specifications for Structural Concrete for Buildings (most recent edition). Committee in
Concrete 403 bulletin 59-43, Bond Strength to Concrete.
1.03 DEFINITIONS
A. Epoxy Resin Flooring specified under this section is referenced on the drawings as
[epoxy].
1.04 SYSTEM DESCRIPTION
A. System shall be 3/16 inch textured epoxy surfacing with broadcast colored quartz to form a decorative skid-resistant surface. Surface finish shall be a two component, chemical re-sistant bisphenol F epoxy.
1.05 SUBMITTALS
A. Samples: Submit 6 by 6 inch cured samples of flooring system indicating color combina-tion and non-skid properties. Approved samples will be used during installation for product match.
B. Certified Test: Submit two copies of suppliers/ manufacturers written certification that flooring system meets or exceeds required properties.
C. Manufacturers Application Instructions: Submit descriptive data and specific recom-mendations for mixing, application, curing including any precautions of special handling instructions required to comply with the Occupational Safety and Health Act.
D. Shop Drawings: Shop Drawings shall be furnished showing installation of cove base and termination details, and details at floor material transitions and where adjoining equip-ment.
1. Locate and provide detailing for flexible joints required for flooring in area of in-stallation.
E. Maintenance Instructions: Submit current copies of the flooring manufacturer's printed recommendations on maintenance methods and products. Submit in accordance with
Section 01730 - Operation and Maintenance Manuals.
FLUID APPLIED FLOORING 096700 - 3
1.06 QUALITY ASSURANCE
A. Materials used in the floor surfacing shall be the products of a single manufacturer.
B. Installation shall be performed by an applicator with minimum 3 years’ experience in work of similar nature and scope. Installer must be approved by the manufacturer of the floor surfacing materials. The contractor shall furnish a written statement from the manu-facturer that the installer is acceptable.
C. Installer to verify locations of all flexible joints required by the provisions of this Section and by the recommendations of the related material manufacturers.
1. Joint locations may or may not be shown in drawings.
2. Refer to drawings required under SUBMITTALS above.
D. Installer to keep daily log of the date of installation, room number, type, color, and meth-od of application of product being installed. Log must be available for inspection by the
Architect upon request.
E. Contractor to have proven experience with specified system.
F. Portable mock-up: Prior to starting application of flooring, provide full scale portable mock-up to establish acceptable quality, durability, and appearance. Mock-up size must not be less than 4 square feet.
1. Acceptable mock-up to be standard of quality for installed work.
2. Unacceptable installed work to be removed and replaced until acceptable. Aes-thetically unacceptable but well bonded work may be overlaid or recoated per
Manufacturer’s instructions if thickness clearances permit.
G. Qualifications:
1. Installer: Must be acceptable to Architect, and Manufacturer.
1.07 PROJECT CONDITIONS
A. Maintain the ambient room and the floor temperatures at 60 degrees Fahrenheit, or above, for a period extending from 72 hours before, during and after floor installation. Concrete to receive surfacing shall have cured for at least 28 days and shall have been free of water for at least 7 days.
B. Dew Point: Substrate temperature must be minimum of 5 degrees above dew point prior to, during or up to 24 hours after application of flooring system.
C. Illumination: Apply flooring system only where a minimum of 30 footcandles exist when measured 3 feet from surface.
D. Advise other trades of fixtures and fittings not to be installed until flooring is cured and protected.
1.08 PROTECTION
FLUID APPLIED FLOORING 096700 - 4
A. Protect adjacent surfaces not scheduled to receive the flooring by masking, or by other means, to maintain these surfaces free of the flooring material.
B. Provide adequate ventilation and fire protection at all mixing and placing operations.
Prohibit smoking or use of spark or flame producing devices within 50 feet of any mixing or placing operation.
C. Provide polyethylene or rubber gloves or protective creams for all workmen engaged in applying products containing epoxy.
1.09 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. All materials shall be delivered to project site in original manufacturer's sealed containers including type of material, batch numbers, date of manufacture, and pertinent labels in-tact and legible.
B. Store materials in dry protected area at a temperature between 60° F to 80° F.
C. Follow all manufacturer's specific instructions and prudent safety practices for storage and handling.
1.10 WARRANTY
A. Contractor to guarantee work under this Section to be free from defects of material and installation for the duration of the warranty period. Defects occurring during warranty period shall be repaired, in a manner satisfactory to the Owner and the Architect, at no additional cost to the Owner.
1. Warranty Period: Two (2) Years.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Manufacturers must have as a minimum the standards set forth in this specification and must be preapproved in accordance with project requirements. Manufacturer’s other than listed below may provide materials, provided their products conform to the specifica-tions. Provide product compliance form to the architect.
Design Basis: Key Quartz B-195 as manufactured by the Key Resin Company
2.02 MATERIALS
B. Flexible Membrane: Flexible Epoxy.
C. Prime Coat: Two component penetrating epoxy or moisture vapor control system if re-quired.
D. Aggregates:
1. Blended quartz sand for base.
FLUID APPLIED FLOORING 096700 - 5
2. Color coated quartz with a minimum Mohs. hardness of 6.
E. Matrix: Matrix-epoxy/aggregate composition.
F. Grout and Topcoats:
1. Clear two component, chemical resistant epoxy grout and sealer.
2.04 MIXING
A. Apply ceramic granular flooring to specified physical properties.
B. Physical Properties:
1. Weight:
1.50 lbs/sq.ft. per 3/16 inch thickness.
2. Compressive Strength:
a. ASTM C-579
b. 10,000 - 12,000 psi
3. Tensile Strength:
a. ASTM C-307
b. 2,400 psi
4. Flexural Strength:
a. ASTM C-580
b. 3,000 - 4,500 psi
5. Indentation:
a. MIL-D-3134F Sec. 4.7.4
b. Withstands 2,000 psi for 30 mins. without indentation
6. Impact Resistance:
a. MIL-D-3134F, Sec. 4.7.3
b. 16 ft/lbs.; no chipping, cracking, or delamination
7. Adhesive Strength to Concrete:
a. ACI Committee 403/503
b. 250 psi minimum (100% concrete failure)
8. Water Absorption:
a. ASTM-D-570
b. 0.10
9. Abrasion Resistance:
a. ASTM-C-501
b. 32 mg. max.
10. Thermal Shock Resistance:
a. ASTM-C-884
b. passes
11. Thermal Coefficient of Expansion:
a. ASTM-C-531
b. 22 x 10-6 in/ in/ °F
C. Provide slip-resistant, cleanable textured finish. Samples to be approved by Owner and
Architect.
FLUID APPLIED FLOORING 096700 - 6
2.05 FINISHES
A. Color as selected by Architect from the manufacturer's standard patterns.
PART 3 EXECUTION
3.01 PREPARATION
A. Obtain Architect's approval of mock-up before installing flooring; see QUALITY
ASSURANCE in PART 1.
B. Preparation of Surface:
1. Inspect surfaces to receive flooring and verify that condition is smooth and free from conditions that will adversely affect execution, permanence, or quality of work.
a. Remove all existing projections, debris, and existing coatings that may be detrimental to adhesion of new flooring system. Remove dirt, oil con-taminates, grease, and surface coatings affecting bond.
2. Notify Architect in writing prior to commencing work of any conditions deemed unsatisfactory for the installation; installation of flooring materials is understood as acceptance of the substrate as satisfactory.
3. Concrete: The General Contractor shall be responsible for hiring an independent testing service to test for moisture content and moisture vapor emission rate; in-stall no flooring over concrete until the concrete has been cured and is sufficient-ly dry to achieve permanent bond with flooring as determined by material manu-facturer's recommended bond and moisture tests.
a. Contractor to request manufacturer’s product representative review the existing conditions. If needed, Effectively remove concrete laitance by steel shot blasting or other method approved by flooring manufacturer.
Surface profile must be a minimum CSP-3 profile according to Interna-tional Concrete Repair Institute Guideline #03732. Flooring contractor shall document surface profile using ASTM D-7682 test method.
b. Test existing concrete slab to determine presence of existing vapor barri-
er. Core drill a limited area of existing slab and retain the plug for evalu-ation. Perform a moisture test on the concrete. Confirm the absence or presence of a vapor barrier. Report findings to architect and DECA PM.
Compare findings to those required of the resin floor manufacturer’s lit-erature. Set up meeting with all parties to discuss findings.
FLUID APPLIED FLOORING 096700 - 7
c. Treat existing cracks and sawcuts (contraction joints) in concrete using manufacturer's recommended practice. Rout out cracks larger than 1/16” and fill with rigid epoxy; coat with flexible membrane in accordance with manufacturer's recommendation to reduce cracking through flooring system. Refer to section 3.02.B. If exposing sawcuts through finished floor system: Clean out sawcuts and fill with semi-rigid epoxy joint fill-
er. If covering sawcuts with finished floor system: Clean out sawcuts and fill with rigid epoxy; coat with flexible membrane in accordance with manufacturer's recommendation to reduce cracking through flooring sys-tem. Refer to section 3.02.B.
3.02 INSTALLATION
A. Install all floor materials in strict conformance with manufacturer's instructions.
B. Route out all cracks larger than 1/16” width and fill with rigid epoxy material approved by Manufacturer of floor materials. Apply flexible membrane across the crack and 12 inches on either side at a spread rate of 40-50 square feet per gallon to achieve 32-40 mils dry. Optional membrane reinforcement: Fiberglass scrim cloth is applied to top of cured membrane. Sawcuts: Use this same procedure if covering sawcuts with finished flooring system.
C. Alternate to step B for extensive cracking or overlaying sawcuts: Apply flexible mem-brane over entire floor surface as a crack reduction membrane at a spread rate of 40-50 square feet per gallon to achieve 32-40 mils dry. Optional membrane reinforcement: Fi-berglass scrim cloth reinforcement is to be applied over entire membrane or individual cracks as outlined in step B. Precaution: If area to receive flooring may be subjected to excessive thermal induced movement from sunlight exposure, consult with manufacturer before proceeding with full membrane coverage.
D. Prime entire surface with recommended primer. If using moisture vapor control system, fill cracks and sawcuts prior to installation of crack isolation membrane.
E. Apply epoxy and broadcast decorative aggregate in two applications to achieve a mini-mum thickness of 3/16 inch.
F. Apply chemical resistant epoxy grout coat and seal coat(s) to provide a uniform, dense surface.
G. Match finished work to approved samples, uniform in thickness, sheen, color, pattern and texture, and free from defects detrimental to appearance.
H. Apply temporary protection until floor is fully cured. The General Contractor shall pro-tect the finished floor from the time that the sub-contractor completes the work.
I. Integral Cove Base: Where scheduled, provide integral cove base formed from flooring over tile backerboard as specified under 09250 - Gypsum Drywall. Optional: provide cove trim strip at top of base as recommended by flooring manufacturer and trowel mate-
FLUID APPLIED FLOORING 096700 - 8
rial up wall to form smooth, integral transition and base 4-6 inches high unless otherwise indicated or scheduled.
END OF SECTION 096700
| Addendum One |
| Addendum No.1 combined_082724 |
| Addendum No. 1 |
| DMA Ravenna RC MEP Addendum No1 2024-08-27 |
| 096700 - FLUID-APPLIED FLOORI |