Addendum One.pdf
PDF 277 KB Posted
- Attached to
- RFB-105-27 Big Bone Lake Dam Decommissioning
- Solicitation number
- RFB 785 2700000196 3
- Issued by
- Boone County, Kentucky
About this file
This Addendum One document is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in connection with Invitation to Bid No. RFB-105-27 for Big Bone Lake Dam Decommissioning in Boone County, Kentucky, administered by the EEC-Division of Water. The addendum, dated November 9, 2026, addresses two critical clarifications regarding project quantities and excavation scope. The Engineer's estimated quantity for General Fill Placement is approximately 71,500 cubic yards as indicated in Line Item 17 on Drawing A02, with the referenced 71,340 quantity corresponding to Line Items 18 (Temporary Seeding) and 19 (Woven Erosion Control Blanket), where units are provided in square yards rather than cubic yards. The addendum clarifies that "Bulk Excavation," "Tributary Excavation," and "Spoils Embankment Stripping and Placement" represent actual dirt yardages requiring movement, with Bulk Excavation material potentially stockpiled for later use as topsoil and Tributary Excavation separated due to smaller channels requiring different construction means and methods. Per the Engineer's note on the table of estimated quantities, prospective bidders are required to become thoroughly familiar with the project area and perform all necessary calculations and measurements to determine quantities prior to submitting a base bid lump sum price, as the Engineer's provided quantities are for Owner reference only.
The addendum establishes that bidders bear responsibility for independent quantity verification and project site assessment prior to bid submission. No pricing information, set-asides, incumbent contractor details, or contract term specifications are addressed within this addendum document. All bidders must conform to the changes outlined in this addendum as binding upon the contract to be issued in response to the invitation to bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum Two.pdf | ||
| Final_RFB_785_2700000196_3_SO_FORM.PDF | ||
| Final_RFB_785_2700000196_1_SO_FORM.PDF | ||
| Final_RFB_785_2700000196_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-105-27
FOR: Big Bone Lake Dam Decommissioning EEC-Division of Water Boone County, Kentucky
DATE: November 10, 2026
RFB-785-2700000196
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-105-27 For: Big Bone Lake Dam Decommissioning EEC-Division of Water Boone County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO. One (1)
Date: November 9, 2026
RFB – 105-27
Item 1: Questions and answers listed below:
Question 1: On the estimated quantities is the general fill placement cubic yardage of 71340
Is that the calculated holding capacity of the area ?
Response: The Engineer’s estimated quantity for General Fill Placement is approximately 71,500 cubic yards (CY) as indicated in Line Item 17 in the Table presented on Drawing A02. The referenced 71,340 quantity appears to coincide with Line Items 18 (Temporary Seeding) and 19 (Woven Erosion Control
Blanket). The units for Line Items 17 and 18 are provided in units of square yards. In accordance with the
Note shown on the Engineer’s table of estimated quantities, prospective bidders shall become thoroughly familiar with the project area and perform all calculations and measurements necessary to determine quantities prior to submitting a base bid lump sum price. The Engineer’s quantities provided on Drawing
A02 are intended for the Owner’s general reference only.
Question 2: I'm seeing bulk excavation tributary excavation and spoil embankment stripping as actual dirt yardages needing moved?
Response: That is correct. The intent was to separate “Spoils Embankment Stripping and Placement” from the “Bulk Excavation”. The “Bulk Excavation” material may be stockpiled and later used as topsoil.
The “Tributary Excavation” was delineated from the “Bulk Excavation” due to the smaller channels which may require different means and methods to achieve subgrade elevations.
In accordance with the Note shown on the Engineer’s table of estimated quantities, prospective bidders shall become thoroughly familiar with the project area and perform all calculations and measurements necessary to determine quantities prior to submitting a base bid lump sum price. The Engineer’s quantities provided on Drawing A02 are intended for the Owner’s general reference only.
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
Addendum_1_Response