Addendum One.pdf
PDF 277 KB Posted
- Attached to
- RFB-105-27 Big Bone Lake Dam Decommissioning
- Solicitation number
- RFB 785 2700000196 2
- Issued by
- Boone County, Kentucky
About this file
This is Addendum One to Invitation to Bid No. RFB-105-27 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Big Bone Lake Dam Decommissioning project in Boone County, Kentucky under the EEC-Division of Water. The addendum, dated November 9, 2026, clarifies the Engineer's estimated quantities and project specifications through responses to bidder questions. The Engineer's estimated quantity for General Fill Placement is approximately 71,500 cubic yards as indicated in Line Item 17 on Drawing A02, with the referenced 71,340 quantity corresponding to Line Items 18 (Temporary Seeding) and 19 (Woven Erosion Control Blanket). The project involves three distinct excavation components: Bulk Excavation (material that may be stockpiled for later use as topsoil), Spoils Embankment Stripping and Placement, and Tributary Excavation (smaller channels requiring different means and methods). Prospective bidders are instructed to become thoroughly familiar with the project area and perform all necessary calculations and measurements to determine actual quantities, as the Engineer's quantities provided are for general reference only.
The addendum establishes that all quantities presented are estimates and that bidders submit lump sum prices based on their own site analysis and measurements. No specific pricing terms, set-asides, contract terms, award dates, or response deadlines are detailed in this addendum document. Bidders are bound to conform to all additions, deletions, and changes specified in this addendum upon contract issuance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2700000196_2_SO_FORM.PDF | ||
| Final_RFB_785_2700000196_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-105-27
FOR: Big Bone Lake Dam Decommissioning EEC-Division of Water Boone County, Kentucky
DATE: November 10, 2026
RFB-785-2700000196
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-105-27 For: Big Bone Lake Dam Decommissioning EEC-Division of Water Boone County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO. One (1)
Date: November 9, 2026
RFB – 105-27
Item 1: Questions and answers listed below:
Question 1: On the estimated quantities is the general fill placement cubic yardage of 71340
Is that the calculated holding capacity of the area ?
Response: The Engineer’s estimated quantity for General Fill Placement is approximately 71,500 cubic yards (CY) as indicated in Line Item 17 in the Table presented on Drawing A02. The referenced 71,340 quantity appears to coincide with Line Items 18 (Temporary Seeding) and 19 (Woven Erosion Control
Blanket). The units for Line Items 17 and 18 are provided in units of square yards. In accordance with the
Note shown on the Engineer’s table of estimated quantities, prospective bidders shall become thoroughly familiar with the project area and perform all calculations and measurements necessary to determine quantities prior to submitting a base bid lump sum price. The Engineer’s quantities provided on Drawing
A02 are intended for the Owner’s general reference only.
Question 2: I'm seeing bulk excavation tributary excavation and spoil embankment stripping as actual dirt yardages needing moved?
Response: That is correct. The intent was to separate “Spoils Embankment Stripping and Placement” from the “Bulk Excavation”. The “Bulk Excavation” material may be stockpiled and later used as topsoil.
The “Tributary Excavation” was delineated from the “Bulk Excavation” due to the smaller channels which may require different means and methods to achieve subgrade elevations.
In accordance with the Note shown on the Engineer’s table of estimated quantities, prospective bidders shall become thoroughly familiar with the project area and perform all calculations and measurements necessary to determine quantities prior to submitting a base bid lump sum price. The Engineer’s quantities provided on Drawing A02 are intended for the Owner’s general reference only.
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
Addendum_1_Response
File details come from the government source that posted it. Updated .