This is Addendum One to Invitation to Bid (RFB-76-27) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for renovation of the Restrictive Housing Unit at Northpoint Training Center, Department of Corrections in Danville, Kentucky. The addendum provides clarifications to the original bid documents and adds scope to the project. Acceptable window manufacturers beyond the initially specified Hope's brand now include Arcadia Inc., Optimum Window MFG Corp., Habersham Metals, and Claybourne Manufacturing. Four additional windows (109A, 109B, 202, and 208) located in the central portion of the facility have been added to the scope of work, with scheduling to be coordinated during the pre-construction meeting. The contractor may demo all windows in a phase simultaneously and board them with plywood prior to installing new windows, provided no inmates are present in the cells. Work hours of Monday through Thursday, 7:00 a.m. to 5:00 p.m., are acceptable and shall be coordinated with the facility. Site access occurs at the gate at Tower 1, with all personnel and vendors subject to search upon entry and exit.
Existing penetrations in precast concrete should be reused for plumbing and HVAC systems when possible, verified and coordinated in the field. The security glazing specification requires 1/2" clear Lexan MR-10 by Global Security Glazing as the basis of design, with technical performance data including forced entry classification to ASTM F 1233 Class II and ASTM 1915 Grade 4, and a light transmission rating of 0.79. Site staging shall follow sketch SK-A01, with potential dumpster and Conex box placement in a designated area requiring minimum 10-foot-high temporary fencing on east and west sides if used. The contractor is responsible for repairing any damage to adjacent site areas to like-new condition. A site visit occurred on September 11, 2026, with photographs available for bidder reference. Receipt of the addendum must be acknowledged on the bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2700000109_1_SO_FORM.PDF | ||
| Final_RFB_785_2700000109_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-76-27
FOR: Renovation of Restrictive Housing Unit Northpoint Training Center Department of Corrections Danville, Kentucky
DATE: September 22, 2026
RFB-785-2700000109
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-76-27 For: Renovation of Restrictive Housing Unit Northpoint Training Center Department of Corrections Danville, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM #01 Date: 22 Sept 2026 1
NORTHPOINT TRAINING CENTER
RESTRICTIVE HOUSING UNIT
Danville, KY Account #: 527-CBSH-NP-49-00
Architect’s Project No: 1762
TO: ALL BIDDERS AND PROSPECTIVE BIDDERS
Notice to bidders:
The following changes in, additions to, or deletions from the Drawings and Specifications of the above-named project shall be a part of the Contract. Each bidder shall govern themselves accordingly in the preparation of their proposal.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED ON YOUR BID FORM
CLARIFICATIONS
The following questions have been submitted by bidders. Responses follow.
1. Is Hope’s the only acceptable (window) manufacturer? If not, will others need to be approved by addenda?
a. Response: Other acceptable manufacturers include:
i. Arcadia Inc.
ii. Optimum Window MFG Corp.
iii. Habersham Metals
iv. Claybourne Manufacturing
2. What is the thickness of the exterior wall where the windows will be installed? Scale appears to be 8-1/2”.
a. Response: Refer to attached drawing SK-A02, existing wall section; existing construction shall be verified by contractor in field, all instances.
3. Would it be acceptable to demo all windows in each phase (one dormitory wing, 30 windows) at the same time and board with plywood prior to installing new window.
a. Response: this is acceptable, provided there are no inmates in the cells. Inmate relocation shall be coordinated with the facility.
4. Work Hours – Would it be acceptable to work Monday – Thursday 7:00am to 5:00pm?
a. Response: this is acceptable; work hours shall be coordinated with the facility.
5. Do the new plumbing/ HVAC systems require new penetrations in the precast concrete, or can the existing penetrations be re-used?
a. Response: Existing penetrations in the precast concrete should be used in all locations when possible- verify and coordinate in field.
6. Photographs from the site visit on 11 Sept 2026 can be found at the link below. Please let us know ASAP if you have any difficulties accessing these photos.
a. Photos from 11 Sept 2026 site visit (clickable link)
7. Additional windows added to scope of work:
a. Windows 109A, 109B, 202 and 208 have been added to scope of work. These windows are located in the central portion of the facility. Schedule to replace these windows will https://drive.google.com/drive/folders/1oEkDqbDdXBhTlZQH2HcHExP-sA_UKRP5?usp=drive_link be discussed during the pre-construction meeting and shall be coordinated with the facility. Refer to SK-A03 and SK-A04 (attached)
8. Site Staging:
a. Refer to sketch SK-A01 (attached) regarding access to site, laydown area, and potential dumpster/ Conex box locations. Entry to the site shall occur at the gate at Tower 1. All personnel and vendors are subject to search when entering and leaving the site.
9. Security Glazing:
a. Glazing type “SG-1” shall be 1/2” clear Lexan MR-10 by Global Security Glazing (basis of design). Refer to attached cut sheet for further information.
DRAWINGS
The following drawings have been added to the drawing set:
1. SK-A01: Site Staging Plan
2. SK-A02: Existing Wall Section
3. SK-A03: Demolition Floor Plans
4. SK-A04: New Floor Plans
SPECIFICATIONS
The following information has been added to the specifications:
1. Specification sheet for 1/2” clear Lexan MR-10 by Global Security Glazing
END OF ADDENDUM 1- ATTACHMENTS FOLLOW
Attachments:
2460_SK-A01_Add-01_2026-09-22.pdf 2460_SK-A02_Add-01_2026-09-22.pdf 2460_SK-A03_Add-01_2026-09-22.pdf 2460_SK-A04_Add-01_2026-09-22.pdf Global_MR-10.pdf
AREA OF
WORK
PERIMETER
FENCING
VEHICULAR SALLYPORT-
ACCESS TO SITE
TOWER 1 LAYDOWN LOT
EXISTING
FENCING
EXISTING
FENCING
POTENTIAL DUMPSTER/
CONEX BOX PLACEMENT;
IF THIS AREA IS USED,
PROVIDE MIN. 10’-0” HIGH
TEMPORARY FENCING
ON EAST AND WEST
SIDES TO ENCLOSE AREA
TEMPORARY
FENCING (BY
CONTRACTOR)
NOTE: ANY DAMAGE TO ADJACENT SITE (GRASS, ASPHALT, TERRAIN,
LANDSCAPING, ETC) BY CONTRACTOR DURING CONSTRUCTION
ACTIVITIES SHALL BE REPAIRED TO LIKE-NEW CONDITION, TYP.
ARCHITECTSK E R S E Y A N D K E R S E Y
RTA DATE
DECA LOG #
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
AS BUILT DATEPHASE
FRANKFORT, KENTUCKY
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
FINANCE AND ADMINISTRATION CABINET
COMMONWEALTH OF KENTUCKY
Fax 502 585 2728 kerseyandkersey.com
Louisville, KY 40204
Tel 502 583 0094
839 East Gray Street Suite 207
Lexington, KY 40507
201 West Short Street Commiskey, IN 47227
Tel 812 873 1287
9307 West 1000 North
Tel 859 303 8439
LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA
REVISIONS DATE
ACCOUNT NO(S).
527-CBSH-NP-49-00
NORTHPOINT TRAINING CENTER RESTRICTIVE HOUSING
DANVILLE, KY 2460
/2
/2
:2 :5
A
M SK-A01
SITE STAGING PLAN
RTA
31 JULY 2026 MM/DD/YR
AMS
CCK
NTS SK-A01
1SITE STAGING PLAN
22 SEPT 2026
1 9-22-26ADDENDUM 01
ADD. #01
GENERAL EC NOTES:
1. EXISTING CONDITION DRAWINGS ARE
PROVIDED FOR COORDINATION AND
REFERENCE PURPOSES ONLY. VERIFY ALL
EXISTING CONDITIONS IN FIELD, TYP- COORD.
W/ CONSTRUCTION DOCUMENTS AND WITH
OWNER.
ARCHITECTSK E R S E Y A N D K E R S E Y
RTA DATE
DECA LOG #
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
AS BUILT DATEPHASE
FRANKFORT, KENTUCKY
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
FINANCE AND ADMINISTRATION CABINET
COMMONWEALTH OF KENTUCKY
Fax 502 585 2728 kerseyandkersey.com
Louisville, KY 40204
Tel 502 583 0094
839 East Gray Street Suite 207
Lexington, KY 40507
201 West Short Street Commiskey, IN 47227
Tel 812 873 1287
9307 West 1000 North
Tel 859 303 8439
LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA
REVISIONS DATE
ACCOUNT NO(S).
527-CBSH-NP-49-00
NORTHPOINT TRAINING CENTER RESTRICTIVE HOUSING
DANVILLE, KY 2460
/2
/2
:2 :5
A
M SK-A02
EXISTING WALL SECTION
RTA
31 JULY 2026 MM/DD/YR
AMS
CCK
22 SEPT 2026
1 9-22-26ADDENDUM 01
ADD. #01
NTS SK-A02
1EXST. WALL SECTION
UP
DN
CONTROL
MULTI-PURPOSE
CORRIDOR
122A
CELL
STAFF/ VISITOR
TOILET
109A
109B
O
PE
N
TO
BE
LO
W
MECHANICAL
MULTI-PURPOSE
MULTI-PURPOSE
212A
CELL
O
PE
N
TO
BE
LO
W
ADDENDUM 01 NOTES:
WINDOWS 109A, 109B, 202
AND 208 ADDED TO SCOPE
OF WORK. COORD. W/
DRAWINGS D101, A101, A802,
AND SPECFICIATIONS, TYP.
1.
ARCHITECTSK E R S E Y A N D K E R S E Y
RTA DATE
DECA LOG #
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
AS BUILT DATEPHASE
FRANKFORT, KENTUCKY
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
FINANCE AND ADMINISTRATION CABINET
COMMONWEALTH OF KENTUCKY
Fax 502 585 2728 kerseyandkersey.com
Louisville, KY 40204
Tel 502 583 0094
839 East Gray Street Suite 207
Lexington, KY 40507
201 West Short Street Commiskey, IN 47227
Tel 812 873 1287
9307 West 1000 North
Tel 859 303 8439
LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA
REVISIONS DATE
ACCOUNT NO(S).
527-CBSH-NP-49-00
NORTHPOINT TRAINING CENTER RESTRICTIVE HOUSING
DANVILLE, KY 2460
/2
/2
:3 :5
P
M SK-A03
DEMOLITION FLOOR PLANS
RTA
31 JULY 2026 MM/DD/YR
AMS
CCK
1 ADDENDUM 01 9-22-26
22 SEPT 2026
REF: 1,2/D101
1/8" = 1'-0" SK-A03
1FIRST FLOOR DEMO PLAN
1/8" = 1'-0" SK-A03
2SECOND FLOOR DEMO PLAN
REF: 1/D101
REF: 2/D101
UP
DN
WINDOW NO. NAME
WINDOW SCHEDULE (ADDENDUM 01)
TYPE MATERIAL FINISH NOTESINSULATED? GLAZINGROOM NO.
109A
109B
109 MULTI-PURPOSE
MULTI-PURPOSE
PAINT W1, W2, W3A INSULATED SG-1DHM
PAINT W1, W2, W3A INSULATED SG-1DHM
202 202 MULTI-PURPOSE PAINT W1, W2, W3A INSULATED SG-1DHM
208 208 MULTI-PURPOSE PAINT W1, W2, W3A INSULATED SG-1DHM
(REF: A802)
ADDENDUM 01 NOTES:
WINDOWS 109A, 109B, 202
AND 208 ADDED TO SCOPE
OF WORK. COORD. W/
DRAWINGS D101, A101, A802,
AND SPECFICIATIONS, TYP.
1.
CONTROL
MULTI-PURPOSE
CORRIDOR
122A
CELL
STAFF/ VISITOR
TOILET
109A
109B
MECHANICAL
MULTI-PURPOSE
MULTI-PURPOSE
212A
CELL
O
PE
N
TO
BE
LO
W
ARCHITECTSK E R S E Y A N D K E R S E Y
RTA DATE
DECA LOG #
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
AS BUILT DATEPHASE
FRANKFORT, KENTUCKY
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
FINANCE AND ADMINISTRATION CABINET
COMMONWEALTH OF KENTUCKY
Fax 502 585 2728 kerseyandkersey.com
Louisville, KY 40204
Tel 502 583 0094
839 East Gray Street Suite 207
Lexington, KY 40507
201 West Short Street Commiskey, IN 47227
Tel 812 873 1287
9307 West 1000 North
Tel 859 303 8439
LOUISVILLE, KENTUCKY LEXINGTON, KENTUCKY MADISON, INDIANA
REVISIONS DATE
ACCOUNT NO(S).
527-CBSH-NP-49-00
NORTHPOINT TRAINING CENTER RESTRICTIVE HOUSING
DANVILLE, KY 2460
/2
/2
:3 :4
P
M SK-A04
NEW FLOOR PLANS
RTA
31 JULY 2026 MM/DD/YR
AMS
CCK
1 ADDENDUM 01 9-22-26
22 SEPT 2026
REF: 1,2/A101
A802
1/8" = 1'-0" SK-A04
1FIRST FLOOR- NEW CONST.
1/8" = 1'-0" SK-A04
2SECOND FLOOR- NEW CONST.
REF: 1/A101
REF: 2/A101
SPECIFICATION SHEETS
616 Selfield Road ‐ Selma, Alabama 36703 Tel: 800‐633‐2513 ‐ Fax: 334‐875‐2704 – www.security‐glazing.com
D014A 4/08
PRODUCT NAME: ½” Clear Lexan® MR 10
PRODUCT CODE: MR 10 (AR2)
PERFORMANCE TESTING: Forced Entry: ASTM F 1233 Class II ASTM 1915 Grade 4 HP White Level I‐TP‐0500.02
CONSTRUCTION: 1/2” Polycarbonate – Monolithic Abrasion Resistant Coating (2 sides)
THICKNESS: 1/2” Nominal (.50”)
WEIGHT: 3.10 Lbs. / Square Foot
MAXIMUM SIZE: 60” x 96”
TECHNICAL DATA: U‐Value .77 Shading Co‐efficient .92 Light Transmission .79
SINGLE RESPONSIBILITY: Global Security Glazing products are covered by our Single Responsibility® Program that ensures one firm has handled and is accountable for all phases of manufacturing.
INSTALLATION: All glazing should be installed in accordance with the guidelines set forth in the current edition of the Glass Association of North America (GANA) Glazing and Sealant Manuals. Glazing systems should incorporate a weep system to allow moisture and water to escape the glazing channel.
Recommended Clearance:
Face: 1/8” per side Edge: 1/4” Bite: 1”
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
2460_Northpoint_Addendum_01
File details come from the government source that posted it. Updated .