Addendum One.pdf

PDF 129 KB Posted

Attached to
RFB-09-27 Parks New Water Service Fort Boonesborough
Solicitation number
RFB 785 2600000655 2
Issued by
Bell County, Kentucky

About this file

This Addendum One document modifies the Invitation to Bid (RFB-09-27) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the New Water Service project at Fort Boonesborough State Park under the Department of Parks in Richmond, Kentucky. The addendum, dated July 8, 2026, and identified as RFB-785-2600000655, contains specifications and drawing changes that become binding upon the resulting contract. The primary modification addresses pipe installation methodology, specifically permitting the use of HDPE DR9 pipe via directional drilling as an alternative to the specified C900 pipe via open-cut excavation, but only in existing cut areas such as driveways or crossings and not as a substitute for significant pipe lengths throughout the project.

The addendum clarifies that where HDPE directional drilling is approved for use, contractors must match the inside diameter (ID) of the pipe rather than the outside diameter (OD). This technical requirement ensures compatibility and proper system integration. The document does not contain information regarding pricing terms, bid amounts, response deadlines, site visits, bidder conferences, or contract award dates; such details would be contained in the base Invitation to Bid document.

View the file

Other files

File Type Posted
Final_RFB_785_2600000655_1_SO_FORM.PDF PDF
Final_RFB_785_2600000655_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-09-27

FOR: New Water Service Fort Boonesborough State Park Department of Parks Richmond, Kentucky

DATE: July 8, 2026

RFB-785-2600000655

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-09-27 For: New Water Service Fort Boonesborough State Park Department of Parks Richmond, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

RFB-96-27

Fort Boonesborough Water Main Extension

Addendum 1

July 8, 2026

1. Request for approval to install HDPE DR9 pipe via direc�onal drilling instead of the specified

C900 pipe via open-cut excava�on.

Response: The HDPE Direc�onal method can be used in exis�ng cut areas only such as driveways or crossings, not as a subs�tute for any significant length of pipe for the job. In sec�ons where HDPE is to be used, the contractor will need to match the ID of the pipe and not the OD.

Addendum One
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM

RFB-9-27 Fort Boonesborough Main Extension- Addendum 1_2026-07-08

File details come from the government source that posted it. Updated .