This Addendum One document modifies Request for Bid (RFB) No. RFB-250-26 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for flood mitigation work at Fort Boonesborough State Park in Richmond, Kentucky. The project encompasses comprehensive renovations to address flood damage sustained in 2025, including replacement and upgrades to civil utilities, electrical infrastructure, mechanical systems, plumbing, and structural improvements across multiple facilities including the Lower Bath House, Upper Bath House, Meeting Hall, Ranger Office, shelters, campground infrastructure, and a new lift station. The bid references RFB-785-2600000581 and requires contractors to conform to all additions, deletions, and changes to specifications and drawings as outlined in the attached addendum documentation. The extensive construction documents provided include detailed civil utility plans with sanitary sewer, water line, and drainage improvements; electrical site plans with power distribution, lighting, and controls; mechanical and plumbing specifications for HVAC and water systems; and architectural drawings for multiple buildings and structures, with all work to be coordinated across the entire campground property.
The project involves significant infrastructure replacement below flood-damaged elevations, with electrical equipment, mechanical systems, plumbing fixtures, and related components requiring complete replacement in affected facilities. All existing utilities and systems must be verified and field-checked prior to construction, with contractors responsible for coordination among trades and protection of existing features outside the work scope. The work is categorized under campground renovation and flood mitigation improvements managed by the Department of Parks, with oversight by the Division of Engineering and Contract Administration. Contractors must comply with all applicable codes, standards, and special inspection requirements outlined in the technical specifications, including provisions for geotechnical verification, concrete testing, structural steel inspection, and special inspections for seismic resistance and nonstructural components. Detailed submittals, shop drawings, and coordination with utility providers, including Kentucky Utilities Company, are required prior to fabrication and installation of major systems and equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000581_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000581_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-250-26
FOR: Flood Mitigation Fort Boonesborough State Park Department of Parks Richmond, Kentucky
DATE: May 11, 2026
RFB-785-2600000581
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-250-26 For: Flood Mitigation Fort Boonesborough State Park Department of Parks Richmond, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
580 580
7 56
566 56
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X X
X X
X
SD
(e x)
SD
(e x)
SD(ex) SD(ex)
SD
(e x)
SD
(e x)
SD
(e x)
SD
(e x)
W
X
X
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SD
(e x)
SD
(e x)
SD
(e x)
SD
(e x)
FH
SD(ex)
SD(ex) SD(ex)
SD(ex)
T
T
PP
PPOHE(ex)
593.2
593.2
C C
C
573574
BM-1
BM-2
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
AT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WATWAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
WW
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W
W W
W W
W W
W
W
W
W
W
W W W W W W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
WWREC
HALL
GENERAL
14 16
18 20
BASKETBALL
COURT
PLAYGROUND
BATH
HOUSE
EX MH-2
RIM:579.87
I.E.(OUT):575.75
I.E.(IN):575.85
STA:0+00
MH-4
RIM:592.50
I.E.(OUT):583.32
I.E.(IN):583.42
I.E.(IN2):584.43
STA:1+53.69
X: 5348383.26
Y: 3854556.48 MH-3
RIM:594.00
I.E.(OUT):585.18
I.E.(IN):585.28
STA:2+36.61
X: 5348414.44 Y: 3854479.54
MH-5
RIM:588.50
I.E.(OUT):583.99
I.E.(IN):584.09
STA:1+14.29
X: 5348361.89 Y: 3854672.80
MH-6
RIM:580.5
I.E.(OUT):576.06
I.E.(IN):576.16
STA:0+44.55
X: 5348677.57 Y: 3854612.04
MH-7
RIM:582
I.E.(OUT):577.07
I.E.(IN):577.17
STA:1+92.35
X: 5348700.20 Y: 3854463.81
F.V.EXIST.
LOCATION
TO CONNECT
INTO BATH
HOUSE
EX MH-1
RIM:586.94
I.E.(OUT):582.30
I.E.(IN):582.40
EX. INV: 582.51
STA:0+00
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SS
SS
SS
F.V.EXIST.
LOCATION
TO CONNECT
INTO REC
HALL MH-2
RIM:591.00
I.E.(OUT):586.41
I.E.(IN):586.51
STA:4+29.21
X: 5348547.57 Y: 3854340.54
MH-1
RIM:594.5
I.E.(OUT):589.83
I.E.(IN):
STA:6+88.88
X: 5348637.65 Y: 3854096.99
MH-8
RIM:588.5
I.E.(OUT):583.73
I.E.(IN):583.83
STA:5+05.52
X: 5348747.05 Y: 3854154.11
WATER LINE TO
ROCK QUARRY
W
AT
W
AT
W
AT
W
AT
W
W
W
W
W
W
W
W
W
W
AT
W
AT
W
AT
X X
X
XX
X X
X X
X X
X X
X X
X X
X
X X
X X
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
AREA A - CIVIL UTILITIES PLAN
15 60
900SCALE 1" = 30'-0"
N
Area A Civil Utilities Plan C101
BOONESBOROUGH ROAD
CIVIL UTILITY KEYNOTES:
CIVIL UTILITY NOTES:
CIVIL UTILITY LEGEND
PROPOSED SANITARY
SEWER MANHOLE- SEE
DETAIL H/C2.0 & I/C2.0
PROPOSED GRAVITY
SANITARY SEWER PIPE
PROPOSED SANITARY
SEWER CLEANOUT- SEE
MEP PLANS
CO
SAN
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED BY D+L SURVEYING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF
THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL ACTUAL LOCATIONS.
C. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING WITHIN THE LIMIT OF CONTRACT ARE TO REMAIN AND BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION.
D. THE CONTRACTOR SHALL MAINTAIN UTILITY SYSTEMS TO FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.
E. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
F. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
G. FOR PROPOSED UTILITY STRUCTURES, INVERT ELEVATIONS ARE APPROXIMATE AND BASED ON INFORMATION PROVIDED FOR EXISTING STRUCTURES. FIELD VERIFY ELEVATIONS PRIOR TO INSTALLATION OF UTILITY STRUCTURES.
H. FOR PROPOSED UTILITY PIPE, PIPE LENGTHS & SLOPES ARE APPROXIMATE & SHOULD BE FIELD VERIFIED.
I. PROVIDE THRUST BLOCKS AT ALL BENDS AND TEES IN WATER LINE. REFER TO DETAIL C/C2.0. ALL FITTINGS OR PRESSURIZED
LINES TO BE MJDI UNLESS OTHERWISE NOTED.
J. EXPLORATION TO CONFIRM EXISTING UTILITY LOCATIONS IS CONSIDERED INCIDENTAL. ALL EXISTING UTILITIES SHALL BE FIELD VERIFIED, UTILITY CROSSINGS ARE TO BE CHECKED AND ANY CONFLICTS IDENTIFIED PRIOR TO UTILITY INSTALLATIONS BEGINNING.
K. ALL ITEMS ON THIS SHEET REQUIRING POWER SHALL BE SUPPLIED POWER BY THE CONTRACTOR REGARDLESS OF THEIR
INCLUSION IN MEP PORTION OF THE PLANS.
L. CONTRACTOR SHALL COORDINATE ALL UTILITY CROSSING AND IDENTIFY POTENTIAL CONFLICTS PRIOR TO BEGINNING INSTALLATION OF UTILITIES. ALL UTILITY LINE CROSSINGS SHALL BE INSTALLED PER UTILITY LINE CROSSING DETAIL IN THESE
DOCUMENTS.
M. ANY EXISTING BRICK SANITARY OR STORM MANHOLES THAT ARE TO BE CONNECTED TO SHALL BE REPLACED WITH A
PROPOSED CONCRETE MANHOLE
N. ALL EXISTING OR PROPOSED WATERLINES CROSSING SANITARY SEWER LINES SHALL BE ENCASED IN LOW STRENGTH CONCRETE
FOR A DISTANCE OF 10 FEET ON EITHER SIDE.
O. ALL SITES, 1-161 SHALL RECEIVE NEW LEAD FREE YARD HYDRANTS PER DETAIL.
P. THE WATER LINE TO THE ROCK QUARRY IS TO REMAIN SERVICE THROUGHOUT CONSTRUCTION. ANY REQUIRED OUTAGES FOR SWITCHOVER OF EXISTING METER TO NEW LINES SHALL BE COORDINATED THROUGH PARKS AND A MINIMUM 2 WEEKS NOTICE SHALL BE PROVIDED TO THE ROCK QUARRY. CONTRACTOR SHALL ASSUME THAT THE SWITCHOVER WILL BE REQUIRED AT NIGHT, WEEKEND OR HOLIDAY WHEN THE ROCK QUARRY IS NOT OPERATING.
PROPOSED 4"GRAVITY
SANITARY SEWER
LATERAL MIN 1% SLOPE
SS
PROPOSED POTABLE
WATER LINEW
PROPOSED WATER
VALVE
WAT
PROPOSED 1"WATER
SERVICE LINE
1. 8 INCH GRAVITY SEWER LINE PVC SDR-35. SEE DETAIL A/C300
2. 4 INCH SEWER LATERAL, PVC SDR-35. SEE DETAIL A/C300 MAINTAIN MINIMUM 1%
SLOPE
3. LIGHT POLE TO BE REMOVED AND REPLACED
4. NEW SANITARY SEWER CLEANOUT AT INDIVIDUAL CAMPSITE, SEE DETAIL E/C300.
5. SANITARY SEWER CLEAN OUT. SEE DETAIL B/C300
6. SANITARY SEWER MANHOLE. SEE DETAIL C/C300
7. CONNECT SANITARY SERVICE LINE TO EXISTING MANHOLES
8. RELOCATED SANITARY DUMP STATION, SEE DETAIL C301. THE DUMP LINES SALL BE
INSTALLED BELOW FROST DEPTH AN MAINTAIN A 1% SLOPE. EXISTING DUMP LINES ARE
CLOGGED DUE TO FLOODING AND WERE UNABLE TO BE CAMERA INSPECTED. EXISTING
DUMP LINES SHALL BE JETTED AND POINT OF CONNECTION DETERMINED SO THAT THE
NEW DUMP LINES CAN UTILIZE THE SAME CONNECTION POINT.
9. NEW LIFT STATION, SEE DETAIL C500
10. CONNECT PROPOSED WATER LINE TO EXISTING LINE, FIELD VERIFY LOCATION AND
CONDITION OF EXISTING WATER LINE AND NOTIFY PROJECT CIVIL ENGINEER OF ANY
CONFLICTS OR ISSUES WITH PROPOSED WORK.
11. EXISTING SANITARY LINE TO BE REPLACED
12. NEW 1 INCH, HDPE WATER LINE SERVICE TO NEW FROST FREE / LEAD FREE HYDRANT,
TYPICAL AT ALL NEW AND EXISTING CAMPSITE LOCATIONS (161 CAMPSITES AND
HYDRANTS / CONNECTIONS TOTAL). SEE DETAIL E/C400
13. EXISITNG MANHOLE TO BE REPLACED
14. NEW 2 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
15. NEW 2 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
16. NEW 6 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
17. NEW 6 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
18. REPLACE EXISTING FIRE HYDRANT. SEE DETAIL F/C400
19. CONNECT BATH HOUSE SERVICE LINE TO NEW WATER LINE.
20. NEW 2 INCH, DIMJ GATE VALVE BLOW OFF ASSEMBLY. SEE DETAIL G/C400
21. VERIFY EXISTING PIPE LAYOUT. CONNECTION FOR NEW 6 INCH LINE TO BE MADE WHERE
EXISTING 6 INCH LINE IS. THE 6 INCH LINE SERVING THE ROCK QUARRY METER MUST
REMAIN ACTIVE DURING CONSTRUCTION. REFER TO GENERAL NOTE P.
22. POWER AND CONTROLS TO EXTEND FROM ELEVATED PEDESTAL TO LIFT STATION.
DISTANCE IS APPROXIMATELY 120 FEET. COORDINATE EXTENDED LENGTH OF WIRES
WITH LIFT STATION SUPPLIER. WIRES SHALL BE IN BURIED CONDUIT.
12 TYP.
12 TYP.
12 TYP.
TYP.
TYP.
FM PROPOSED 3"
SANITARY FORCE MAIN
**NOTE- WATER LINES AND ELECTRICAL LINES ARE
NOT TO BE TRENCHED UNDER EXISTING TREES.
COORDINATE STAKING FOR NEW LINES WITH
PARKS & ARCHITECT TO VERIFY ANY LINE
LOCATIONS INDICATED WHICH MAY BE UNDER
EXISTING TREE CANOPY.
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
26439
L IC ENS ED
575574
X
X X
X X
X X
X X
X
X
X X
X X
X X
X
X X
X X
X
X X
X X
X
X
X X
X X
X X
X X
X X SD(ex)
SD(ex)
SD
(e x)
SD
(e x)
SD
(e x)
SD
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SD(ex)
SD(ex) SD(ex)
SD(ex)
XXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
SD(ex)
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O
HE
(e x)
O
HE
(e x)
O
HE
(e x)
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
X
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
SD
(e x)
SD(ex)
X
PP
PP
PP
PP
PP
PP
PP
PP
PP
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
PP
PP
T
T
SD(ex)
C C
C
C
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex)
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
SAN
SAN
SAN
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT WAT WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W W W W W W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
WWREC
HALL
118116
115 117
76 78 80
BASKETBALL
COURT
PLAYGROUND
EX MH-2
RIM:579.87
I.E.(OUT):575.75
I.E.(IN):575.85
STA:0+00
MH-4
RIM:592.50
I.E.(OUT):583.32
I.E.(IN):583.42
I.E.(IN2):584.43
STA:1+53.69
X: 5348383.26 Y: 3854556.48
MH-5
RIM:588.50
I.E.(OUT):583.99
I.E.(IN):584.09
STA:1+14.29
X: 5348361.89 Y: 3854672.80
RIM:580.5
I.E.(OUT):576.06
I.E.(IN):576.16
STA:0+44.55
X: 5348677.57 Y: 3854612.04
EX MH-1
RIM:586.94
I.E.(OUT):582.30
I.E.(IN):582.40
EX. INV: 582.51
STA:0+00
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
F.V.EXIST.
LOCATION
TO CONNECT
INTO REC
HALL
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
W
AT
W
AT
W
AT
W
AT
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
AREA B CIVIL UTILITIES PLAN
15 60
900SCALE 1" = 30'-0"
N
Area B Civil Utilities plan C102
BO
O
N
ES
BO
R
O U
G H
R O
AD
CIVIL UTILITY KEYNOTES:
CIVIL UTILITY NOTES:
CIVIL UTILITY LEGEND
PROPOSED SANITARY
SEWER MANHOLE- SEE
DETAIL H/C2.0 & I/C2.0
PROPOSED GRAVITY
SANITARY SEWER PIPE
PROPOSED SANITARY
SEWER CLEANOUT- SEE
MEP PLANS
CO
SAN
PROPOSED 4"GRAVITY
SANITARY SEWER
LATERAL MIN 1% SLOPE
SS
PROPOSED POTABLE
WATER LINE
PROPOSED WATER
VALVE
PROPOSED 1"WATER
SERVICE LINE
1512 TYP.
12 TYP.
12 TYP.
TYP.
FM PROPOSED 3"
SANITARY FORCE MAIN
1. 8 INCH GRAVITY SEWER LINE PVC SDR-35. SEE DETAIL A/C300
2. 4 INCH SEWER LATERAL, PVC SDR-35. SEE DETAIL A/C300 MAINTAIN MINIMUM 1% SLOPE
3. LIGHT POLE TO BE REMOVED AND REPLACED
4. NEW SANITARY SEWER CLEANOUT AT INDIVIDUAL CAMPSITE, SEE DETAIL E/C300.
5. SANITARY SEWER CLEAN OUT. SEE DETAIL B/C300
6. SANITARY SEWER MANHOLE. SEE DETAIL C/C300
7. CONNECT SANITARY SERVICE LINE TO EXISTING MANHOLES
8. RELOCATED SANITARY DUMP STATION, SEE DETAIL C301. THE DUMP LINES SALL BE INSTALLED BELOW FROST DEPTH AN MAINTAIN A 1% SLOPE. EXISTING DUMP LINES ARE CLOGGED DUE TO FLOODING AND WERE UNABLE TO BE CAMERA INSPECTED.
EXISTING DUMP LINES SHALL BE JETTED AND POINT OF CONNECTION DETERMINED SO THAT THE NEW DUMP LINES CAN UTILIZE THE
SAME CONNECTION POINT.
9. NEW LIFT STATION, SEE DETAIL C500
10. CONNECT PROPOSED WATER LINE TO EXISTING LINE, FIELD VERIFY LOCATION AND CONDITION OF EXISTING WATER LINE AND
NOTIFY PROJECT CIVIL ENGINEER OF ANY CONFLICTS OR ISSUES WITH PROPOSED WORK.
11. EXISTING SANITARY LINE TO BE REPLACED
12. NEW 1 INCH, HDPE WATER LINE SERVICE TO NEW FROST FREE / LEAD FREE HYDRANT, TYPICAL AT ALL NEW AND EXISTING CAMPSITE LOCATIONS (161 CAMPSITES AND HYDRANTS / CONNECTIONS TOTAL). SEE DETAIL E/C400
13. EXISITNG MANHOLE TO BE REPLACED
14. NEW 2 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
15. NEW 2 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
16. NEW 6 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
17. NEW 6 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
18. REPLACE EXISTING FIRE HYDRANT. SEE DETAIL F/C400
19. CONNECT BATH HOUSE SERVICE LINE TO NEW WATER LINE.
20. NEW 2 INCH, DIMJ GATE VALVE BLOW OFF ASSEMBLY. SEE DETAIL G/C400
21. VERIFY EXISTING PIPE LAYOUT. CONNECTION FOR NEW 6 INCH LINE TO BE MADE WHERE EXISTING 6 INCH LINE IS. THE 6 INCH LINE SERVING THE ROCK QUARRY METER MUST REMAIN ACTIVE DURING CONSTRUCTION. REFER TO GENERAL NOTE P.
22. POWER AND CONTROLS TO EXTEND FROM ELEVATED PEDESTAL TO LIFT STATION. DISTANCE IS APPROXIMATELY 120 FEET.
COORDINATE EXTENDED LENGTH OF WIRES WITH LIFT STATION SUPPLIER. WIRES SHALL BE IN BURIED CONDUIT.
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED BY D+L SURVEYING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF
THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL ACTUAL LOCATIONS.
C. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING WITHIN THE LIMIT OF CONTRACT ARE TO REMAIN AND BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION.
D. THE CONTRACTOR SHALL MAINTAIN UTILITY SYSTEMS TO FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.
E. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
F. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
G. FOR PROPOSED UTILITY STRUCTURES, INVERT ELEVATIONS ARE APPROXIMATE AND BASED ON INFORMATION PROVIDED FOR EXISTING STRUCTURES. FIELD VERIFY ELEVATIONS PRIOR TO INSTALLATION OF UTILITY STRUCTURES.
H. FOR PROPOSED UTILITY PIPE, PIPE LENGTHS & SLOPES ARE APPROXIMATE & SHOULD BE FIELD VERIFIED.
I. PROVIDE THRUST BLOCKS AT ALL BENDS AND TEES IN WATER LINE. REFER TO DETAIL C/C2.0. ALL FITTINGS OR PRESSURIZED
LINES TO BE MJDI UNLESS OTHERWISE NOTED.
J. EXPLORATION TO CONFIRM EXISTING UTILITY LOCATIONS IS CONSIDERED INCIDENTAL. ALL EXISTING UTILITIES SHALL BE FIELD VERIFIED, UTILITY CROSSINGS ARE TO BE CHECKED AND ANY CONFLICTS IDENTIFIED PRIOR TO UTILITY INSTALLATIONS BEGINNING.
K. ALL ITEMS ON THIS SHEET REQUIRING POWER SHALL BE SUPPLIED POWER BY THE CONTRACTOR REGARDLESS OF THEIR
INCLUSION IN MEP PORTION OF THE PLANS.
L. CONTRACTOR SHALL COORDINATE ALL UTILITY CROSSING AND IDENTIFY POTENTIAL CONFLICTS PRIOR TO BEGINNING INSTALLATION OF UTILITIES. ALL UTILITY LINE CROSSINGS SHALL BE INSTALLED PER UTILITY LINE CROSSING DETAIL IN THESE
DOCUMENTS.
M. ANY EXISTING BRICK SANITARY OR STORM MANHOLES THAT ARE TO BE CONNECTED TO SHALL BE REPLACED WITH A
PROPOSED CONCRETE MANHOLE
N. ALL EXISTING OR PROPOSED WATERLINES CROSSING SANITARY SEWER LINES SHALL BE ENCASED IN LOW STRENGTH CONCRETE
FOR A DISTANCE OF 10 FEET ON EITHER SIDE.
O. ALL SITES, 1-161 SHALL RECEIVE NEW LEAD FREE YARD HYDRANTS PER DETAIL.
P. THE WATER LINE TO THE ROCK QUARRY IS TO REMAIN SERVICE THROUGHOUT CONSTRUCTION. ANY REQUIRED OUTAGES FOR SWITCHOVER OF EXISTING METER TO NEW LINES SHALL BE COORDINATED THROUGH PARKS AND A MINIMUM 2 WEEKS NOTICE SHALL BE PROVIDED TO THE ROCK QUARRY. CONTRACTOR SHALL ASSUME THAT THE SWITCHOVER WILL BE REQUIRED AT NIGHT, WEEKEND OR HOLIDAY WHEN THE ROCK QUARRY IS NOT OPERATING.
W
WAT
**NOTE- WATER LINES AND ELECTRICAL LINES ARE
NOT TO BE TRENCHED UNDER EXISTING TREES.
COORDINATE STAKING FOR NEW LINES WITH
PARKS & ARCHITECT TO VERIFY ANY LINE
LOCATIONS INDICATED WHICH MAY BE UNDER
EXISTING TREE CANOPY.
MATCHLINE- AREA C
M
ATC
H
LIN
E- AR
EA A
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
582 582
582582
578 578
7 56
566 56
X
X
X X
X
X X
X X
X
SD
(e x)
SD
(e x)
X X
X X
X X
X
XXXXXXXXX
XXXXXXX
X
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
X
O H
E( ex
O H
E( ex
O H
E( ex
O H
E( ex
X
PP
PP
PP
FH
PP
T
SD(ex)
PP
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
OHE(ex) OHE(ex)
C C
565 56
SD(ex
SD(ex
FM
FM
FM
FMFMFMFMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
AT W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT WAT WAT WAT WAT WAT WAT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT WAT WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
W
W
W
W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W W W W W
W
W
W
W
W
W
W W
W
W
W
W W
W
W W
W W
W W
W
W W
W W
W W W W W W W W W W W W W
W
W
W
W W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W W
W W
W W W W W W W W W W W W W W W W W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
118116
76 78 80
75 157
164165166167
129 127 125
128130
BATH
HOUSE
MH-6
RIM:580.5
I.E.(OUT):576.06
I.E.(IN):576.16
STA:0+44.55
X: 5348677.57 Y: 3854612.04
FIELD VERIFY EXISTING
WATER LOCATION AT BATH
HOUSE
W
SAN
SAN
SAN
SAN
147 148 149
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
ALLOWANCE #1
SITE 139 SLIPPAGE REPAIRS.
REMOVE ASPHALT PAVEMENT
AND COORDINATE ACCESS /
REPAIRS WITH ALLOWANCE #1
CONTRACTOR, SEE SPECIAL
CONDITIONS
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
AREA C CIVIL UTILITIES PLAN
15 60
900SCALE 1" = 30'-0"
N
Area C Civil Utilities Plan C103
BOONESBORO QUARRY
CIVIL UTILITY KEYNOTES:
CIVIL UTILITY NOTES:
CIVIL UTILITY LEGEND
PROPOSED SANITARY
SEWER MANHOLE- SEE
DETAIL H/C2.0 & I/C2.0
PROPOSED GRAVITY
SANITARY SEWER PIPE
PROPOSED SANITARY
SEWER CLEANOUT- SEE
MEP PLANS
CO
SAN
PROPOSED 4"GRAVITY
SANITARY SEWER
LATERAL MIN 1% SLOPE
SS
PROPOSED POTABLE
WATER LINE
PROPOSED WATER
VALVE
PROPOSED 1"WATER
SERVICE LINE
12 TYP.
TYP.
12 TYP.
12 TYP.
TYP.
FM PROPOSED 3"
SANITARY FORCE MAIN
1. 8 INCH GRAVITY SEWER LINE PVC SDR-35. SEE DETAIL A/C300
2. 4 INCH SEWER LATERAL, PVC SDR-35. SEE DETAIL A/C300 MAINTAIN MINIMUM 1%
SLOPE
3. LIGHT POLE TO BE REMOVED AND REPLACED
4. NEW SANITARY SEWER CLEANOUT AT INDIVIDUAL CAMPSITE, SEE DETAIL E/C300.
5. SANITARY SEWER CLEAN OUT. SEE DETAIL B/C300
6. SANITARY SEWER MANHOLE. SEE DETAIL C/C300
7. CONNECT SANITARY SERVICE LINE TO EXISTING MANHOLES
8. RELOCATED SANITARY DUMP STATION, SEE DETAIL C301. THE DUMP LINES SALL BE
INSTALLED BELOW FROST DEPTH AN MAINTAIN A 1% SLOPE. EXISTING DUMP LINES ARE
CLOGGED DUE TO FLOODING AND WERE UNABLE TO BE CAMERA INSPECTED. EXISTING
DUMP LINES SHALL BE JETTED AND POINT OF CONNECTION DETERMINED SO THAT THE
NEW DUMP LINES CAN UTILIZE THE SAME CONNECTION POINT.
9. NEW LIFT STATION, SEE DETAIL C500
10. CONNECT PROPOSED WATER LINE TO EXISTING LINE, FIELD VERIFY LOCATION AND
CONDITION OF EXISTING WATER LINE AND NOTIFY PROJECT CIVIL ENGINEER OF ANY
CONFLICTS OR ISSUES WITH PROPOSED WORK.
11. EXISTING SANITARY LINE TO BE REPLACED
12. NEW 1 INCH, HDPE WATER LINE SERVICE TO NEW FROST FREE / LEAD FREE HYDRANT,
TYPICAL AT ALL NEW AND EXISTING CAMPSITE LOCATIONS (161 CAMPSITES AND
HYDRANTS / CONNECTIONS TOTAL). SEE DETAIL E/C400
13. EXISITNG MANHOLE TO BE REPLACED
14. NEW 2 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
15. NEW 2 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
16. NEW 6 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
17. NEW 6 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
18. REPLACE EXISTING FIRE HYDRANT. SEE DETAIL F/C400
19. CONNECT BATH HOUSE SERVICE LINE TO NEW WATER LINE.
20. NEW 2 INCH, DIMJ GATE VALVE BLOW OFF ASSEMBLY. SEE DETAIL G/C400
21. VERIFY EXISTING PIPE LAYOUT. CONNECTION FOR NEW 6 INCH LINE TO BE MADE WHERE
EXISTING 6 INCH LINE IS. THE 6 INCH LINE SERVING THE ROCK QUARRY METER MUST
REMAIN ACTIVE DURING CONSTRUCTION. REFER TO GENERAL NOTE P.
22. POWER AND CONTROLS TO EXTEND FROM ELEVATED PEDESTAL TO LIFT STATION.
DISTANCE IS APPROXIMATELY 120 FEET. COORDINATE EXTENDED LENGTH OF WIRES
WITH LIFT STATION SUPPLIER. WIRES SHALL BE IN BURIED CONDUIT.
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED BY D+L SURVEYING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF
THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL ACTUAL LOCATIONS.
C. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING WITHIN THE LIMIT OF CONTRACT ARE TO REMAIN AND BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION.
D. THE CONTRACTOR SHALL MAINTAIN UTILITY SYSTEMS TO FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.
E. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
F. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
G. FOR PROPOSED UTILITY STRUCTURES, INVERT ELEVATIONS ARE APPROXIMATE AND BASED ON INFORMATION PROVIDED FOR EXISTING STRUCTURES. FIELD VERIFY ELEVATIONS PRIOR TO INSTALLATION OF UTILITY STRUCTURES.
H. FOR PROPOSED UTILITY PIPE, PIPE LENGTHS & SLOPES ARE APPROXIMATE & SHOULD BE FIELD VERIFIED.
I. PROVIDE THRUST BLOCKS AT ALL BENDS AND TEES IN WATER LINE. REFER TO DETAIL C/C2.0. ALL FITTINGS OR PRESSURIZED
LINES TO BE MJDI UNLESS OTHERWISE NOTED.
J. EXPLORATION TO CONFIRM EXISTING UTILITY LOCATIONS IS CONSIDERED INCIDENTAL. ALL EXISTING UTILITIES SHALL BE FIELD VERIFIED, UTILITY CROSSINGS ARE TO BE CHECKED AND ANY CONFLICTS IDENTIFIED PRIOR TO UTILITY INSTALLATIONS BEGINNING.
K. ALL ITEMS ON THIS SHEET REQUIRING POWER SHALL BE SUPPLIED POWER BY THE CONTRACTOR REGARDLESS OF THEIR
INCLUSION IN MEP PORTION OF THE PLANS.
L. CONTRACTOR SHALL COORDINATE ALL UTILITY CROSSING AND IDENTIFY POTENTIAL CONFLICTS PRIOR TO BEGINNING INSTALLATION OF UTILITIES. ALL UTILITY LINE CROSSINGS SHALL BE INSTALLED PER UTILITY LINE CROSSING DETAIL IN THESE
DOCUMENTS.
M. ANY EXISTING BRICK SANITARY OR STORM MANHOLES THAT ARE TO BE CONNECTED TO SHALL BE REPLACED WITH A
PROPOSED CONCRETE MANHOLE
N. ALL EXISTING OR PROPOSED WATERLINES CROSSING SANITARY SEWER LINES SHALL BE ENCASED IN LOW STRENGTH CONCRETE
FOR A DISTANCE OF 10 FEET ON EITHER SIDE.
O. ALL SITES, 1-161 SHALL RECEIVE NEW LEAD FREE YARD HYDRANTS PER DETAIL.
P. THE WATER LINE TO THE ROCK QUARRY IS TO REMAIN SERVICE THROUGHOUT CONSTRUCTION. ANY REQUIRED OUTAGES FOR SWITCHOVER OF EXISTING METER TO NEW LINES SHALL BE COORDINATED THROUGH PARKS AND A MINIMUM 2 WEEKS NOTICE SHALL BE PROVIDED TO THE ROCK QUARRY. CONTRACTOR SHALL ASSUME THAT THE SWITCHOVER WILL BE REQUIRED AT NIGHT, WEEKEND OR HOLIDAY WHEN THE ROCK QUARRY IS NOT OPERATING.
W
WAT
**NOTE- WATER LINES AND ELECTRICAL LINES ARE
NOT TO BE TRENCHED UNDER EXISTING TREES.
COORDINATE STAKING FOR NEW LINES WITH
PARKS & ARCHITECT TO VERIFY ANY LINE
LOCATIONS INDICATED WHICH MAY BE UNDER
EXISTING TREE CANOPY.
MATCHLINE - AREA D
MATCHLINE - AREA B
M
ATC
H
LIN
E - AR
EA A
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
580 580
7 56
566 56
X
XX
X X
X X
SD
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SS
(e x)
SD
(e x)
SD
(e x)
T
PP
PPOHE(ex)C
C
C
564 565
579 580
583 583
SD(ex
SD(ex
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
X X X X X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
SAN
SAN
SAN
SAN
SAN
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFMFMFMFMFM
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
W
AT
WAT
WAT
WAT
WAT
WAT
WAT
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WW W W W W W W W W W
W
W W
W W
W W
W W
W W
W W
160158
SAN
SAN
SAN
SAN
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
CIVIL UTILITIES PLAN
15 60
900SCALE 1" = 30'-0"
N
Area D Waterline Replacement C104
CIVIL UTILITY KEYNOTES:
CIVIL UTILITY NOTES:
CIVIL UTILITY LEGEND
PROPOSED SANITARY
SEWER MANHOLE- SEE
DETAIL H/C2.0 & I/C2.0
PROPOSED GRAVITY
SANITARY SEWER PIPE
PROPOSED SANITARY
SEWER CLEANOUT- SEE
MEP PLANS
CO
SAN
PROPOSED 4"GRAVITY
SANITARY SEWER
LATERAL MIN 1% SLOPE
SS
PROPOSED POTABLE
WATER LINE
PROPOSED WATER
VALVE
PROPOSED 1"WATER
SERVICE LINE
FM PROPOSED 3"
SANITARY FORCE MAIN
1. 8 INCH GRAVITY SEWER LINE PVC SDR-35. SEE DETAIL A/C300
2. 4 INCH SEWER LATERAL, PVC SDR-35. SEE DETAIL A/C300 MAINTAIN MINIMUM 1% SLOPE
3. LIGHT POLE TO BE REMOVED AND REPLACED
4. NEW SANITARY SEWER CLEANOUT AT INDIVIDUAL CAMPSITE, SEE DETAIL E/C300.
5. SANITARY SEWER CLEAN OUT. SEE DETAIL B/C300
6. SANITARY SEWER MANHOLE. SEE DETAIL C/C300
7. CONNECT SANITARY SERVICE LINE TO EXISTING MANHOLES
8. RELOCATED SANITARY DUMP STATION, SEE DETAIL C301. THE DUMP LINES SALL BE INSTALLED BELOW FROST DEPTH AN MAINTAIN A 1% SLOPE. EXISTING DUMP LINES ARE CLOGGED DUE TO FLOODING AND WERE UNABLE TO BE CAMERA INSPECTED. EXISTING DUMP LINES SHALL BE JETTED AND POINT OF CONNECTION DETERMINED SO THAT THE NEW DUMP LINES CAN UTILIZE THE SAME CONNECTION POINT.
9. NEW LIFT STATION, SEE DETAIL C500
10. CONNECT PROPOSED WATER LINE TO EXISTING LINE, FIELD VERIFY LOCATION AND CONDITION OF EXISTING WATER LINE AND NOTIFY PROJECT CIVIL ENGINEER OF ANY CONFLICTS OR ISSUES WITH PROPOSED WORK.
11. EXISTING SANITARY LINE TO BE REPLACED
12. NEW 1 INCH, HDPE WATER LINE SERVICE TO NEW FROST FREE / LEAD FREE HYDRANT, TYPICAL AT ALL NEW AND EXISTING CAMPSITE LOCATIONS (161 CAMPSITES AND HYDRANTS / CONNECTIONS TOTAL). SEE DETAIL E/C400
13. EXISITNG MANHOLE TO BE REPLACED
14. NEW 2 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
15. NEW 2 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
16. NEW 6 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
17. NEW 6 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
18. REPLACE EXISTING FIRE HYDRANT. SEE DETAIL F/C400
19. CONNECT BATH HOUSE SERVICE LINE TO NEW WATER LINE.
20. NEW 2 INCH, DIMJ GATE VALVE BLOW OFF ASSEMBLY. SEE DETAIL G/C400
21. VERIFY EXISTING PIPE LAYOUT. CONNECTION FOR NEW 6 INCH LINE TO BE MADE WHERE EXISTING 6 INCH LINE IS. THE 6 INCH LINE SERVING THE ROCK QUARRY METER MUST REMAIN ACTIVE DURING CONSTRUCTION.
REFER TO GENERAL NOTE P.
22. POWER AND CONTROLS TO EXTEND FROM ELEVATED PEDESTAL TO LIFT STATION. DISTANCE IS APPROXIMATELY 120 FEET. COORDINATE EXTENDED LENGTH OF WIRES WITH LIFT STATION SUPPLIER. WIRES
SHALL BE IN BURIED CONDUIT.
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED BY D+L SURVEYING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL
INFORMATION SHOWN.
B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ACTUAL LOCATIONS.
C. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING WITHIN THE LIMIT OF CONTRACT ARE TO
REMAIN AND BE PROTECTED FROM DAMAGE DURING CONSTRUCTION.
D. THE CONTRACTOR SHALL MAINTAIN UTILITY SYSTEMS TO FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.
E. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
F. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
G. FOR PROPOSED UTILITY STRUCTURES, INVERT ELEVATIONS ARE APPROXIMATE AND BASED ON INFORMATION PROVIDED FOR EXISTING STRUCTURES. FIELD VERIFY ELEVATIONS PRIOR TO INSTALLATION OF UTILITY
STRUCTURES.
H. FOR PROPOSED UTILITY PIPE, PIPE LENGTHS & SLOPES ARE APPROXIMATE & SHOULD BE FIELD VERIFIED.
I. PROVIDE THRUST BLOCKS AT ALL BENDS AND TEES IN WATER LINE. REFER TO DETAIL C/C2.0. ALL FITTINGS OR
PRESSURIZED LINES TO BE MJDI UNLESS OTHERWISE NOTED.
J. EXPLORATION TO CONFIRM EXISTING UTILITY LOCATIONS IS CONSIDERED INCIDENTAL. ALL EXISTING UTILITIES SHALL BE FIELD VERIFIED, UTILITY CROSSINGS ARE TO BE CHECKED AND ANY CONFLICTS IDENTIFIED PRIOR TO
UTILITY INSTALLATIONS BEGINNING.
K. ALL ITEMS ON THIS SHEET REQUIRING POWER SHALL BE SUPPLIED POWER BY THE CONTRACTOR REGARDLESS
OF THEIR INCLUSION IN MEP PORTION OF THE PLANS.
L. CONTRACTOR SHALL COORDINATE ALL UTILITY CROSSING AND IDENTIFY POTENTIAL CONFLICTS PRIOR TO BEGINNING INSTALLATION OF UTILITIES. ALL UTILITY LINE CROSSINGS SHALL BE INSTALLED PER UTILITY LINE
CROSSING DETAIL IN THESE DOCUMENTS.
M. ANY EXISTING BRICK SANITARY OR STORM MANHOLES THAT ARE TO BE CONNECTED TO SHALL BE REPLACED
WITH A PROPOSED CONCRETE MANHOLE
N. ALL EXISTING OR PROPOSED WATERLINES CROSSING SANITARY SEWER LINES SHALL BE ENCASED IN LOW
STRENGTH CONCRETE FOR A DISTANCE OF 10 FEET ON EITHER SIDE.
O. ALL SITES, 1-161 SHALL RECEIVE NEW LEAD FREE YARD HYDRANTS PER DETAIL.
P. THE WATER LINE TO THE ROCK QUARRY IS TO REMAIN SERVICE THROUGHOUT CONSTRUCTION. ANY REQUIRED OUTAGES FOR SWITCHOVER OF EXISTING METER TO NEW LINES SHALL BE COORDINATED THROUGH PARKS AND A MINIMUM 2 WEEKS NOTICE SHALL BE PROVIDED TO THE ROCK QUARRY. CONTRACTOR SHALL ASSUME THAT THE SWITCHOVER WILL BE REQUIRED AT NIGHT, WEEKEND OR HOLIDAY WHEN THE ROCK QUARRY IS NOT OPERATING.
W
WAT
MATCHLINE - AREA A
**NOTE- WATER LINES AND ELECTRICAL LINES ARE
NOT TO BE TRENCHED UNDER EXISTING TREES.
COORDINATE STAKING FOR NEW LINES WITH
PARKS & ARCHITECT TO VERIFY ANY LINE
LOCATIONS INDICATED WHICH MAY BE UNDER
EXISTING TREE CANOPY.
MATCHLINE - AREA C
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
560 561 562
565 56
574575
578 57
X X X X
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE
(e x)
OHE
(e x)
OHE
(e x)
OHE(e x)
OHE(e x)
OHE(e x)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
OHE(ex)
X
EE
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SS(ex)
SD
(e x)
SD
(e x)
SD
(e x)
BM-4
BM-5
BM-6
X
X
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
AREA F CIVIL UTILITIES PLAN
15 60
900SCALE 1" = 30'-0"
N
Area F Sanitary Sewer Repairs C105
CIVIL UTILITY KEYNOTES:
CIVIL UTILITY NOTES:
CIVIL UTILITY LEGEND
PROPOSED SANITARY
SEWER MANHOLE- SEE
DETAIL H/C2.0 & I/C2.0
PROPOSED GRAVITY
SANITARY SEWER PIPE
PROPOSED SANITARY
SEWER CLEANOUT- SEE
MEP PLANS
CO
SAN
PROPOSED 4"GRAVITY
SANITARY SEWER
LATERAL MIN 1% SLOPE
SS
PROPOSED POTABLE
WATER LINE
PROPOSED WATER
VALVE
PROPOSED 1"WATER
SERVICE LINE
FM PROPOSED 3"
SANITARY FORCE MAIN
1. 8 INCH GRAVITY SEWER LINE PVC SDR-35. SEE DETAIL A/C300
2. 4 INCH SEWER LATERAL, PVC SDR-35. SEE DETAIL A/C300 MAINTAIN MINIMUM 1%
SLOPE
3. LIGHT POLE TO BE REMOVED AND REPLACED
4. NEW SANITARY SEWER CLEANOUT AT INDIVIDUAL CAMPSITE, SEE DETAIL E/C300.
5. SANITARY SEWER CLEAN OUT. SEE DETAIL B/C300
6. SANITARY SEWER MANHOLE. SEE DETAIL C/C300
7. CONNECT SANITARY SERVICE LINE TO EXISTING MANHOLES
8. RELOCATED SANITARY DUMP STATION, SEE DETAIL C301. THE DUMP LINES SALL BE
INSTALLED BELOW FROST DEPTH AN MAINTAIN A 1% SLOPE. EXISTING DUMP LINES ARE
CLOGGED DUE TO FLOODING AND WERE UNABLE TO BE CAMERA INSPECTED. EXISTING
DUMP LINES SHALL BE JETTED AND POINT OF CONNECTION DETERMINED SO THAT THE
NEW DUMP LINES CAN UTILIZE THE SAME CONNECTION POINT.
9. NEW LIFT STATION, SEE DETAIL C500
10. CONNECT PROPOSED WATER LINE TO EXISTING LINE, FIELD VERIFY LOCATION AND
CONDITION OF EXISTING WATER LINE AND NOTIFY PROJECT CIVIL ENGINEER OF ANY
CONFLICTS OR ISSUES WITH PROPOSED WORK.
11. EXISTING SANITARY LINE TO BE REPLACED
12. NEW 1 INCH, HDPE WATER LINE SERVICE TO NEW FROST FREE / LEAD FREE HYDRANT,
TYPICAL AT ALL NEW AND EXISTING CAMPSITE LOCATIONS (161 CAMPSITES AND
HYDRANTS / CONNECTIONS TOTAL). SEE DETAIL E/C400
13. EXISITNG MANHOLE TO BE REPLACED
14. NEW 2 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
15. NEW 2 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
16. NEW 6 INCH, HDPE SDR-11 WATER LINE. SEE DETAIL A/C400
17. NEW 6 INCH, DIMJ GATE VALVE. SEE DETAIL B/C400
18. REPLACE EXISTING FIRE HYDRANT. SEE DETAIL F/C400
19. CONNECT BATH HOUSE SERVICE LINE TO NEW WATER LINE.
20. NEW 2 INCH, DIMJ GATE VALVE BLOW OFF ASSEMBLY. SEE DETAIL G/C400
21. VERIFY EXISTING PIPE LAYOUT. CONNECTION FOR NEW 6 INCH LINE TO BE MADE WHERE
EXISTING 6 INCH LINE IS. THE 6 INCH LINE SERVING THE ROCK QUARRY METER MUST
REMAIN ACTIVE DURING CONSTRUCTION. REFER TO GENERAL NOTE P.
22. POWER AND CONTROLS TO EXTEND FROM ELEVATED PEDESTAL TO LIFT STATION.
DISTANCE IS APPROXIMATELY 120 FEET. COORDINATE EXTENDED LENGTH OF WIRES
WITH LIFT STATION SUPPLIER. WIRES SHALL BE IN BURIED CONDUIT.
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED BY D+L SURVEYING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF
THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL ACTUAL LOCATIONS.
C. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING WITHIN THE LIMIT OF CONTRACT ARE TO REMAIN AND BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION.
D. THE CONTRACTOR SHALL MAINTAIN UTILITY SYSTEMS TO FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.
E. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
F. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
G. FOR PROPOSED UTILITY STRUCTURES, INVERT ELEVATIONS ARE APPROXIMATE AND BASED ON INFORMATION PROVIDED FOR EXISTING STRUCTURES. FIELD VERIFY ELEVATIONS PRIOR TO INSTALLATION OF UTILITY STRUCTURES.
H. FOR PROPOSED UTILITY PIPE, PIPE LENGTHS & SLOPES ARE APPROXIMATE & SHOULD BE FIELD VERIFIED.
I. PROVIDE THRUST BLOCKS AT ALL BENDS AND TEES IN WATER LINE. REFER TO DETAIL C/C2.0. ALL FITTINGS OR PRESSURIZED
LINES TO BE MJDI UNLESS OTHERWISE NOTED.
J. EXPLORATION TO CONFIRM EXISTING UTILITY LOCATIONS IS CONSIDERED INCIDENTAL. ALL EXISTING UTILITIES SHALL BE FIELD VERIFIED, UTILITY CROSSINGS ARE TO BE CHECKED AND ANY CONFLICTS IDENTIFIED PRIOR TO UTILITY INSTALLATIONS BEGINNING.
K. ALL ITEMS ON THIS SHEET REQUIRING POWER SHALL BE SUPPLIED POWER BY THE CONTRACTOR REGARDLESS OF THEIR
INCLUSION IN MEP PORTION OF THE PLANS.
L. CONTRACTOR SHALL COORDINATE ALL UTILITY CROSSING AND IDENTIFY POTENTIAL CONFLICTS PRIOR TO BEGINNING INSTALLATION OF UTILITIES. ALL UTILITY LINE CROSSINGS SHALL BE INSTALLED PER UTILITY LINE CROSSING DETAIL IN THESE
DOCUMENTS.
M. ANY EXISTING BRICK SANITARY OR STORM MANHOLES THAT ARE TO BE CONNECTED TO SHALL BE REPLACED WITH A
PROPOSED CONCRETE MANHOLE
N. ALL EXISTING OR PROPOSED WATERLINES CROSSING SANITARY SEWER LINES SHALL BE ENCASED IN LOW STRENGTH CONCRETE
FOR A DISTANCE OF 10 FEET ON EITHER SIDE.
O. ALL SITES, 1-161 SHALL RECEIVE NEW LEAD FREE YARD HYDRANTS PER DETAIL.
P. THE WATER LINE TO THE ROCK QUARRY IS TO REMAIN SERVICE THROUGHOUT CONSTRUCTION. ANY REQUIRED OUTAGES FOR SWITCHOVER OF EXISTING METER TO NEW LINES SHALL BE COORDINATED THROUGH PARKS AND A MINIMUM 2 WEEKS NOTICE SHALL BE PROVIDED TO THE ROCK QUARRY. CONTRACTOR SHALL ASSUME THAT THE SWITCHOVER WILL BE REQUIRED AT NIGHT, WEEKEND OR HOLIDAY WHEN THE ROCK QUARRY IS NOT OPERATING.
W
WAT
**NOTE- WATER LINES AND ELECTRICAL LINES ARE
NOT TO BE TRENCHED UNDER EXISTING TREES.
COORDINATE STAKING FOR NEW LINES WITH
PARKS & ARCHITECT TO VERIFY ANY LINE
LOCATIONS INDICATED WHICH MAY BE UNDER
EXISTING TREE CANOPY.
MATCHLINE - AREA D
M
ATCHLINE - AREA E
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
Sanitary 1
Horizontal Scale = 1:50 Vertical Scale = 1:5
Sanitary 2
Horizontal Scale = 1:50 Vertical Scale = 1:5
MH-1
RIM:594.5
I.E.(OUT):589.83
I.E.(IN):
STA:6+88.88
X: 5348637.65 Y: 3854096.99
MH-2
RIM:591
I.E.(OUT):586.41
I.E.(IN):586.51
STA:4+29.21
X: 5348547.57 Y: 3854340.54
MH-3
RIM:594
I.E.(OUT):585.18
I.E.(IN):585.28
STA:2+36.61
X: 5348414.44 Y: 3854479.54
MH-4
RIM:592.5
I.E.(OUT):583.32
I.E.(IN):583.42
I.E.(IN2):584.43
STA:1+53.69
X: 5348383.26 Y: 3854556.48
CONNECTION
EX MH-1
RIM:586.94
I.E.(OUT):582.30
I.E.(IN):582.40
EX. INV: 582.51
STA:0+00
MH-8
RIM:588.5
I.E.(OUT):583.73
I.E.(IN):583.83
STA:5+05.52
X: 5348747.05 Y: 3854154.11
MH-7
RIM:582
I.E.(OUT):577.07
I.E.(IN):577.17
STA:1+92.35
X: 5348700.20 Y: 3854463.81
MH-6
RIM:580.5
I.E.(OUT):576.06
I.E.(IN):576.16
STA:0+44.55
X: 5348677.57 Y: 3854612.04
Ex MH-2
RIM:579.87
I.E.(OUT):575.75
I.E.(IN):575.85
STA:0+00
8" SDR-35 44.56' @ 0.50%
8" SDR-35 149.72' @ 0.60%
8" SDR-35 313.22' @ 2.09%
8" SDR-35 153.76' @ 0.66%
8" SDR-35 82.99' @ 0.9%
8" SDR-35 192.53' @ 0.58%
8" SDR-35 259.67' @ 1.28%
12" RCP STORMLINE
CROSSINGS
12" RCP STORMLINE
CROSSINGS
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
Sanitary Profiles C200
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
OFFSITE (NON CAMPGROUND) GRAVITY SEWER
Horizontal Scale = 1 :50 Vertical Scale = 1 :5
12" VCP 291.01' @ 0.0013%
TO BE REPLACED
12" VCP 288.67'' @ 0.00813%
12" VCP 246.69' @ 0.00695%
12" VCP 273.84'' @ 0.00813%
Ex MH-1
RIM:582.37
I.E.(OUT):570.35
I.E.(IN):570.45
TO BE
REPLACED
Ex MH-2
RIM:582.08
I.E.(OUT):571.65
I.E.(IN):571.75
TO BE REPLACED
Ex MH-3
RIM:580.85
I.E.(OUT):572.90
I.E.(IN):573.00
TO BE
REPLACED
Ex MH-4
APPROX RIM:580.00
APPROX I.E.(OUT):575.13
APPROX I.E.(IN):575.03
TO BE REPLACED
Ex MH-5
RIM:583.14
I.E.(OUT):576.64
I.E.(IN):576.74
TO BE REPLACED
GROUND IS
APPROXIMATED
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
Sanitary Profiles C201
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
landscape architecture+civil engineering+planning 366 south broadway lexington, ky 40508
p. 859.389.6533
f. 859.389.6534 www.element-site.com
1018 east jefferson louisville, ky 40206
p. 502.489.4221
RAF / RDM
RAF / RDM / CP
670-CC1F-FB24-00
03/31/2026
RTA
DECA REVIEWED
FOR INTENT ONLY
Fort Boonesborough State Park Campground Renovation Parks - CO - Campgrounds East - East - Parks
03/31/2026
NOTE: PLANS SHEETS ARE INTENDED TO
BE VIEWED IN COLOR; IF COLOR DOES
NOT APPEAR ON PLAN SHEETS, SOME
INFORMATION MAY NOT BE INDICATED
Sanitary Sewer Details C300
SANITARY SEWER PIPE BEDDING IN ROCK OR SOIL
N.T.S.
ZONE 1
NOTES:
1. COVER, UP TO AND INCLUDING ZONE 4 SHALL BE ESTABLISHED
BEFORE TRENCH EXCAVATION.
2. ALL SANITARY SEWER LINES CONSTRUCTED FROM
NON-METALLIC MATERIALS SHALL HAVE MAGNETIC MARKER
TAPE INSTALLED IN THE TRENCH ABOVE THE SANITARY SEWER
LINE.
3. MAGNETIC MARKER TAPE FOR SANITARY SEWER ONLY.
PIPE LAID IN ROCK OR
SOIL TRENCH
STANDARD CONCRETE ENCASEMENT
(NOTE: AS REQUIRED BY DESIGN)
ZONE 4
ZONE 5
MAGNETIC MARKER TAPE
ZONE 4
ZONE 5
CONTRACTOR TO PROVIDE
ADEQUATE MEANS TO
PREVENT FLOATING OF PIPE
WHEN INSTALLING CRADLE
PRECAST CONCRETE BLOCK
OR BRICK BEHIND EACH
BELL NOT TO EXCEED 6'
SPACING.
CONCRETE CLASS "A"
M
IN
6" MIN.
12" MAX.
6" MIN.
12" MAX.
6" M
IN
PIPE BACKFILL DESCRIPTIONS
NO. 9 STONE
ZONE 2
ZONE 3
ZONE 4
ZONE 5
NO. 9 OR NO. 57 STONE
COMPACTED DGA
CONSOLIDATED SOIL, (NO ROCK
GREATER THAN 6" DIAMETER), NO.
9, OR NO. 57 STONE
12" MAX TOPSOIL.
NO ROCK ALLOWED.
ZONE 1
6" M
IN
8" M
IN
6" MIN.
12" MAX.
6" MIN.
12" MAX.
A
CAMPSITE SANITARY DUMPING STATION
SANITARY SEWER MANHOLE FRAME & COVER
EN.T.S.
NOTES:
1. MANHOLE FRAME & LID ASSEMBLY
SHALL HAVE A MINIMUM LID WEIGHT
OF 120 LBS. AND A TOTAL MINIMUM
FRAME & LID WEIGHT OF 305 LBS.
WITH ALL STEEL IN ACCORDANCE
WITH ASTM A-48 CLASS 35 SPEC.
2"
4"
1 1 2"
4"21" MIN. DIAM.
36" +-
11 12 " R
12 1 2"
8"
SANITARY
SEWER
SET FRAME CASTING IN FULL MORTAR BED, FOR
WATERTIGHT MANHOLE FRAME AND LID - SEE APPLICABLE
STANDARD DRAWING
MACHINED
SEATING
EDGES
FRAME DETAIL
COVER DETAIL
25" 23" 21"
22 34"
1 1 2"
7"
4"
2"
8"
4" 112"
114"
3" 3"
1"3 8" 1
8"1"
1" 1"
SANITARY SEWER CLEANOUT DETAIL
N.T.S.
C
TO BUILDING
FINISHED GRADE
6" CAST IRON SOIL RISER PIPE
FROM BUILDING
REDUCER IF REQUIRED
1'-0"
1' -0
M
IN
C O
V E R
*IN BITUMINOUS PAVEMENT
SHALL BE 3'-0" SQUARE.
SEE PLAN FOR
CONTINUATION
REFER TO PLAN FOR
CONTINUATION & SIZE
1" CHAMFER WHEN LOCATED IN
AREAS OTHER THAN CONCRETE
OR BITUMINOUS PAVEMENT
#3 BARS AT 8"
O. C. EACH WAY
CAST IRON CLEAN OUT PLUG
WITH THREADED FERRULE.
1'-0"
1' -0
ADDIT. REQUIREMENTS.
1. SEE SPECS. FOR
NOTE:
IN LAWN AREA PROVIDE
SMOOTH TROWELED FINISH
CONCRETE COLLAR -
GRANULAR BASE
ADDIT. REQUIREMENTS.
SEE SPECS. FOR
COMPACTED SUBGRADE
PIPE BEDDING
DN.T.S.
SANITARY SEWER MANHOLE FOR PIPES UP TO 24"
SLO
PE
MANHOLE BASE MAY BE EITHER
ROUND OR SQUARE
NO. 9 STONE
BEDDING
NO. 9 STONE
BEDDING
A
SECTION B-B
A
NOTES:
1. ALL BARREL JOINTS BETWEEN BASE AND BARREL, BETWEEN
BARREL AND TOP, BETWEEN TOP AND ADJUSTING RINGS,
BETWEEN ADJUSTING RINGS AND FRAME SHALL HAVE ONE
OUTER MASTIC SEAL AND AN INNER SEAL OF NONSHRINK
GROUT.
2. COAT OUTSIDE OF ADJUSTING RINGS WITH SEMIFIBRATED
ASPHALT DAMPROOFING COMPOUND APPLIED BY BRUSH OR
SPRAY.
3. WATER STOPS SHOULD BE PROVIDED FOR INLETS AND
OUTLETS OF EVERY MANHOLE, DESIGNED FOR TYPE OF PIPE
USED AND WITH EXPANSIVE GROUT. SEE STD DWG 213 FOR
WATER STOP DETAIL.
4. NO REINFORCEMENT NEEDED IN BOTTOM SLAB AT DEPTHS UP
TO 12'. AT DEPTHS GREATER THAN 12' REINFORCE WITH NO. 4
BARS - 12" C-C.
5. A DIFFERENCE OF FLOW ELEVATION MORE THAN 24" REQUIRES
AND OUTSIDE DROP. (SEE STD. DWG. 212)
6. MANHOLE STEPS SHALL BE ALIGNED WITH STRAIGHT SIDE OF
CONCENTRIC CONE SECTION, AND ALIGNED OVER THE OUTLET
PIPE.
7. PIPES SHALL NOT ENTER THE CONE SECTION.
8. MANHOLES MUST PASS VACUUM TEST PER ASTM C-1244 PRIOR
TO ACCEPTANCE.
NO. 9 STONE
BEDDING
NO. 9 STONE
BEDDING
4'-0" & 5'-0" 5" FOR 4'-0" MANHOLE
6" FOR 5'-0" MANHOLE
MANHOLE STEPS
(SEE STD
DWG 103)
SET FRAME CASTING IN
FULL MASTIC BED; FOR
WATERTIGHT FRAME & LID
- SEE APPLICABLE
STANDARD DRAWING
PROVIDE COLLAR
OF 6" FOR FUTURE
ADJUSTMENT
PRECAST
CONCRETE RINGS
GRADE
2'-0"
3' -0
4"
V A R
IE
S
B B
CONCENTRIC CONICAL
BARREL SECTION
USE STRAIGHT SECTION IF
MANHOLE IS 60" OR LESS
IN DEPTH
PRECAST CONCRETE
BARREL
2" M
IN
6"
MIN.
6"
MIN.
SECTION A-A
SLO
PE
1 8"
M
IN
FOOT OPERATED 4" SANITARY HATCH
COATED DUCTILE IRON BODY WITH CAST ZINC CAP
CAP TO SIT UP FROM CONCRETE AS NEEDED TO ALLOW MIN. 90d
OPENING OF CAP
4" CONCRETE APRON AROUND HATCH.
SLOPE @ MIN. 1"/1' TOWARD HATCH
FROST DEPTH (24")
4" DIA SANITARY SEWER PIPE
6" DIA SANITARY SEWER PIPE
N.T.S.
B
INSTALL SANITARY HATCH TO ALLOW
FOR HATCH TO OPEN TO GREATER
THAN 90D
12" Cutback
12"
"X"12"
Cut and Squared Edges
"X" Cut Back
12"
"X"
Side of Trench
Min. 6" DGA Method "C"
Backfill
CONCRETE PAVEMENT REPLACEMENT BITUMINOUS PAVEMENT REPLACEMENT GRAVEL SURFACE REPLACEMENT
PAVEMENT REPLACEMENT DETAIL
FN.T.S.
Min. 6" Class "A" Conc. Reinforced with 6" x 6" No. 4 wire mesh.
Asphalt Surface CL 2 0.5D PG 64-22 of same thickness as existing pavement.
* KYTC
Encroachment Permit requirement Shall supercede Specifications hereon.
Min. 6" Compacted DGA
Side of Trench
Method "B" Backfill
Method "C" Backfill
Sawed joint or existing pavement
Min. 6" DGA
Side of Trench
6" Class "A" Conc.
Subslab Reinforced with 6" x 6" No. 4 wire mesh.
S T A
T E OF KENT UCKY
P
ROFES S IONA L ENGIN
EE
R
R. DEREK
MOTSCH
4'
1' -6
2' 2'
REVISION HISTORY OF THIS DRAWING
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DRAWN BY
COMMONWEALTH OF KENTUCKY
FINANCE AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .