This Addendum One document is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in response to Invitation to Bid (RFB) No. RFB-221-26 for exterior renovations at the Field Maintenance Shop, Department of Military Affairs in Bowling Green, Kentucky. The addendum, dated May 6, 2026, implements four primary categories of changes to the mechanical, electrical, and structural contract documents. The modifications include revisions to mechanical and electrical plans (MEP-101A and MEP-101B) specifying work on HVAC systems, vent terminations, louver replacements, and electrical updates; addition of a new Sidewall Vent Termination Detail (Detail #3 on Sheet MEP-201) to establish standardized requirements for heater vent installations; and incorporation of structural reinforcement requirements at existing bar joist bridging locations per newly attached structural drawings (S001 and S101). All bidders are required to acknowledge receipt of this addendum on their Form of Proposal and conform to these binding changes, which supersede any conflicting provisions in the original contract documents.
The addendum specifies detailed technical requirements without establishing separate pricing, set-asides, or contract term modifications. Key work includes removal and reinstallation of existing Lennox mini-split HVAC units with new condensate, disconnect power, and refrigerant line sets; replacement of mechanical louvers and dryer exhaust vents with new metallic vents; removal of oil burner flues and installation of new sidewall vent terminations meeting International Mechanical Code standards; electrical modifications including removal of existing buttons, conduits, and installation of new fixtures and junction boxes; coordination with the local power company for overhead service protection; and structural steel reinforcement utilizing specified welding procedures, materials conforming to ASTM designations, and post-installed anchors in accordance with manufacturer recommendations and ICC-ES standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000569_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000569_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-221-26
FOR: Exterior Renovations Field Maintenance Shop Department of Military Affairs Bowling Green, Kentucky
DATE: May 6, 2026
RFB-785-2600000569
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-221-26 For: Exterior Renovations Field Maintenance Shop Department of Military Affairs Bowling Green, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Addendum Two 1
ADDENDUM ONE 5/6/2026
DMA - Bowling Green FMS Exterior Restoration Gallagher Office of Architecture, LLC 719 Morgantown Rd, Bowling Green, KY 42101 227 Miller Street Account # 095-CC0D-BG26-00 Lexington, Kentucky 40507
The Bidding and General Documents, Technical Specifications, and Drawings are clarified or changed in accordance with the following. Bidders shall acknowledge receipt of this Addendum on the Form of Proposal in the space provided.
ITEM NO. ONE (1)
DRAWING MEP-101A “MECHANICAL ELECTRICAL PLAN”
- Refer to Drawing o Revise Coded Sheet Note 4 to read “Remove and reinstall wall brackets, existing Lennox mini-split unit. Provide new condensate, new disconnect power, and new Refrigerant Line Set.
Provide new condensate and new white aluminum line set wrap over line sets”.
o At exterior wall to Secure Storage, add requirement for “remove and replace with new gooseneck pvc vent” to meet IMC Codes. Refer to Coded Sheet Note #3.
o At exterior wall to Secure Storage, remove Coded Sheet Note #1 and Louver L-3 with add requirements to “remove louver, patch and paint wall at removed louver opening”.
o In Garage Bay, near exterior Secure Storage wall, add requirement to “remove old electric button and approximately 16” of conduit and electrical LB”.
o At plan north Garage Bay exterior wall, between two Storage rooms, revise note from “Existing exhaust air vent” to add requirements to “Replace existing dryer exhaust air vent with new metallic exhaust vent”. In addition to work in this area and add requirements to “Remove & Reinstall oil burner flue, through wall, on wall and up through soffit & roof”. Provide new sidewall vent termination. Refer to New Detail on Sheet MEP-201.
Attachments: MEP-101A
ITEM NO. TWO (2)
DRAWING MEP-101B “MECHANICAL ELECTRICAL PLAN”
- Refer to Drawing o Revise Coded Sheet Note 4 to read “Remove and reinstall wall brackets, existing Lennox mini-split unit. Provide new condensate, new disconnect power, and new Refrigerant Line Set.
Provide new condensate and new white aluminum line set wrap over line sets”.
o At plan north Garage Bay exterior wall, add requirements to “Remove & Reinstall oil burner flue, through wall, on wall and up through soffit & roof”. Provide new sidewall vent termination. Refer to New Detail on Sheet MEP-201. Note: there are two applications (both near each other) of this new detail in this Garage Bay on this wall.
Addendum Two 2 o On exterior plan north corner of Garage Bay, add requirements to “coordinate with local power company to protect OH service and weatherhead/conduits down to meter” throughout the project.
o At plan south Garage Bay exterior wall, add requirements to “Remove & Reinstall oil burner flue, through wall, on wall and up through soffit & roof”. Provide new sidewall vent termination. Refer to New Detail on Sheet MEP-201. Note: there are two applications (both near each other) of this new detail in this Garage Bay on this wall.
Attachments: MEP-101B (plan right half)
ITEM NO. THREE (3)
DRAWING MEP-201 “MECHANICAL ELECTRICAL DETAILS”
- Refer to Drawing o Add Detail #3 “Sidewall Vent Termination Detail” to Contract Documents. This detail applies to all existing sidewall vent terminations for new work awith connection to existing heaters.
Attachments: MEP-201
ITEM NO. FOUR (4)
STRUCTURAL DRAWINGS
- Refer to Drawing o Add structural reinforcement at existing bar joist bridging per attached structural drawings.
Attachments: S001 STRUCTURAL NOTES & DESIGN CRITERIA
S002 STRUCTURAL PLAN & DETAILS
END OF ADDENDUM ONE
Attachments:
Drawing: S001 STRUCTURAL NOTES & DESIGN CRITERIA Drawing: S101 STRUCTURAL PLAN & DETAILS Drawing: MEP-101A MECH/ELECT PLAN Drawing: MEP-101B MECH/ELECT PLAN Drawing: MEP-201 MECH/ELECT DETAILS
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
SECURE STORAGE
AutoCAD SHX Text
GARAGE BAY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
ER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ER
AutoCAD SHX Text
AutoCAD SHX Text
CAM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OHF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text
REMOVE & REPLACE KEYPAD/INTERCOM STATION
AutoCAD SHX Text
EXIST. EXHAUST AIR VENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OHT
AutoCAD SHX Text
AutoCAD SHX Text
REPLACE EXIST. DRYER EXHAUST AIR VENT WITH NEW METALLIC EXHAUST VENT
AutoCAD SHX Text
EXIST. BOLLARDS TO REMAIN
AutoCAD SHX Text L-1
AutoCAD SHX Text 48x36
AutoCAD SHX Text L-1
AutoCAD SHX Text 48x36
AutoCAD SHX Text L-1
AutoCAD SHX Text 48x36
AutoCAD SHX Text L-2
AutoCAD SHX Text 24x24
AutoCAD SHX Text L-2
AutoCAD SHX Text 24x24
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text
EX
AutoCAD SHX Text
CONT. TO EXISTING
AutoCAD SHX Text
CONT. TO EXISTING
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text
EX
AutoCAD SHX Text
EXIST. EXHAUST AIR VENT
AutoCAD SHX Text REMOVE & REINSTALL OIL BURNER FLUE, THROUGH WALL, ON WALL AND UP THROUGH SOFFIT & ROOF.
AutoCAD SHX Text
REMOVE LOUVER. PATCH & PAINT WALL AT LOUVER OPENING.
AutoCAD SHX Text
REMOVE & REPLACE WITH NEW GOOSENECK PVC VENT
AutoCAD SHX Text
REMOVE OLD ELECTRIC BUTTON, APP. 16" OF CONDUIT & LB
AutoCAD SHX Text
CODED SHEET NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text REMOVE AND REPLACE MECHANICAL LOUVER WITH NEW LOUVER. REFER TO LOUVER SCHEDULE. PROTECT GAS METER AND PIPING DURING WORK IN PLACE PROTECT GAS VENT/FLUE THROUGH WALL. PROVIDE NEW ESCUTCHEON AT PENETRATION REMOVE AND REINSTALL WALL BRACKETS, EXISTING LENNOX MINI-SPLIT UNIT, PROVIDE NEW CONDENSATE, NEW DISCONNECT POWER AND NEW REFRIGERANT LINE SET. PROVIDE NEW CONDENSATE AND NEW WHITE ALUMINUM LINE SET WRAP OVER LINE SETS REMOVE AND REPLACE WALL MOUNTED LIGHT FIXTURE WITH NEW FIXTURE. REFER TO LIGHT FIXTURE SCHEDULE. PROTECT ELECTRIC METER, CONDUITS & WEATHERHEAD DURING WORK IN PLACE PROTECT TELEPHONE, FIBER AND COMMUNICATIONS CABLES DURING WORK IN PLACE PROTECT SECURITY CAMERA AND CABLE DURING WORK IN PLACE REMOVE WALL LIGHT FIXTURE AND PROVIDE BLANK WALL PLATE. REMOVE CONDUIT & CONDUCTOR BACK TO JUNCTION BOX INSIDE. PATCH & REPAIR WALL OPENING PROVIDE NEW WALL MOUNTED LIGHT FIXTURE. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHT. CORE DRILL AND PROVIDE NEW JUNCTION BOXES AND CONDUCTORS TO MATCH EXISTING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
MEP-101A
AutoCAD SHX Text 1/16" = 1'
AutoCAD SHX Text 3/3/2026
AutoCAD SHX Text
DMA-BOWLING GREEN FMS EXTERIOR
AutoCAD SHX Text
MECH/ELECT PLAN
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
W. GRANT WILSON, PE
AutoCAD SHX Text
CONSULTANTS
AutoCAD SHX Text
PLLC
AutoCAD SHX Text
E-TECH
378 PARK AVENUE, LEXINGTON, KY 40502
SERVICE BAY
AutoCAD SHX Text
GARAGE BAY
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
OHE
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE & REPLACE GENERATOR DISC. SWITCH
AutoCAD SHX Text
AutoCAD SHX Text
PROTECT EXIST. YARD HYDRANT DURING WORK IN PLACE
AutoCAD SHX Text
PROTECT HOSE BIB DURING WORK IN PLACE
AutoCAD SHX Text P
AutoCAD SHX Text
REMOVE & REPLACE PHOTOCELL
AutoCAD SHX Text
HB
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text P
AutoCAD SHX Text
EX
AutoCAD SHX Text
ER
AutoCAD SHX Text
CONT. TO EXISTING
AutoCAD SHX Text
#10'S IN 3/4" EMT CONT. TO PANEL. PROVIDE NEW 20/1P C/B
AutoCAD SHX Text
#10'S IN 3/4" EMT CONT. TO PANEL. PROVIDE NEW 20/1P C/B
AutoCAD SHX Text
NEW PHOTOCELL
AutoCAD SHX Text REMOVE & REINSTALL OIL BURNER FLUE, THROUGH WALL, ON WALL AND UP THROUGH SOFFIT & ROOF.
AutoCAD SHX Text REFER TO DETAIL 3 ON SHEET MEP-201 FOR NEW SIDEWALL VENT & TERMINATION OF HEATER. PROVIDE ALL SINGLE VENT & DOUBLE WALL B VENT WITH ADAPTER BACK TO 10' FROM EXTERIOR WALL (VIF).
AutoCAD SHX Text REFER TO DETAIL 3 ON SHEET MEP-201 FOR NEW SIDEWALL VENT & TERMINATION OF HEATER. PROVIDE ALL SINGLE VENT & DOUBLE WALL B VENT WITH ADAPTER BACK TO 10' FROM EXTERIOR WALL (VIF).
AutoCAD SHX Text COORDINATE WITH LOCAL POWER COMPANY TO PROTECT OH SERVICE & WEATHER HEAD/CONDUITS DOWN TO METER
AutoCAD SHX Text
CODED SHEET NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text REMOVE AND REPLACE MECHANICAL LOUVER WITH NEW LOUVER. REFER TO LOUVER SCHEDULE. PROTECT GAS METER AND PIPING DURING WORK IN PLACE PROTECT GAS VENT/FLUE THROUGH WALL. PROVIDE NEW ESCUTCHEON AT PENETRATION REMOVE AND REINSTALL WALL BRACKETS, EXISTING LENNOX MINI-SPLIT UNIT, PROVIDE NEW CONDENSATE, NEW DISCONNECT POWER AND NEW REFRIGERANT LINE SET. PROVIDE NEW CONDENSATE AND NEW WHITE ALUMINUM LINE SET WRAP OVER LINE SETS REMOVE AND REPLACE WALL MOUNTED LIGHT FIXTURE WITH NEW FIXTURE. REFER TO LIGHT FIXTURE SCHEDULE. PROTECT ELECTRIC METER, CONDUITS & WEATHERHEAD DURING WORK IN PLACE PROTECT TELEPHONE, FIBER AND COMMUNICATIONS CABLES DURING WORK IN PLACE PROTECT SECURITY CAMERA AND CABLE DURING WORK IN PLACE REMOVE WALL LIGHT FIXTURE AND PROVIDE BLANK WALL PLATE. REMOVE CONDUIT & CONDUCTOR BACK TO JUNCTION BOX INSIDE. PATCH & REPAIR WALL OPENING PROVIDE NEW WALL MOUNTED LIGHT FIXTURE. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING HEIGHT. CORE DRILL AND PROVIDE NEW JUNCTION BOXES AND CONDUCTORS TO MATCH EXISTING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
MEP-101B
AutoCAD SHX Text 3/3/2026
AutoCAD SHX Text
DMA-BOWLING GREEN FMS EXTERIOR
AutoCAD SHX Text
MECH/ELECT PLAN
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
W. GRANT WILSON, PE
AutoCAD SHX Text
CONSULTANTS
AutoCAD SHX Text
PLLC
AutoCAD SHX Text
E-TECH
AutoCAD SHX Text
378 PARK AVENUE, LEXINGTON, KY 40502
1/16" = 1'
1) TO PREVENT MOISTURE FROM ENTERING THE HEATER SYSTEM, SLOPE THE VENT PIPE DOWN TOWARD THE OUTLET 1/4" PER FOOT OF LENGTH. DO NOT PITCH THE HEATER.
AutoCAD SHX Text
2) VENT MUST EXTEND BEYOND ANY COMBUSTIBLE OVERHANG.
AutoCAD SHX Text
3) VENT MUST TERMINATE A MINIMUM OF 4' BELOW, 4' HORIZONTALLY FROM OR 12" ABOVE ANY WINDOW OR DOOR THAT MAY BE OPENED AND GRAVITY AIR INLET INTO THE BUILDING.
AutoCAD SHX Text
4) VENT MUST TERMINATE A MINIMUM OF 3' ABOVE ANY FORCED AIR INLET THAT IS LOCATED WITHIN 10'.
AutoCAD SHX Text
5) THE BOTTOM OF THE VENT TERMINAL MUST BE LOCATED A MINIMUM OF 12" ABOVE GRADE LEVEL AND MUST EXTEND BEYOND ANY COMBUSTIBLE OVERHANG. VENTS ADJACENT TO PUBLIC WALKWAYS MUST TERMINATE A MINIMUM A 7' ABOVE GRADE LEVEL.
AutoCAD SHX Text
6) THE VENT CAP MUST BE A MINIMUM OF 6" FROM THE SIDEWALL OF THE BUILDING.
AutoCAD SHX Text
7) THE VENT TERMINAL MUST BE INSTALLED TO PREVENT BLOCKAGE BY SNOW AND PROTECT BUILDING MATERIALS FROM DEGRADATION BY FLUE GASES.
AutoCAD SHX Text
8) VENTS MUST EXTEND BEYOND ANY COMBUSTIBLE OR BE A MINIMUM OF 36" BELOW A COMBUSTIBLE OVERHANG.
AutoCAD SHX Text
VENT TERMINATION NOTES:
AutoCAD SHX Text
BUILDING OVERHANG
AutoCAD SHX Text
SIDEWALL VENT CAP
AutoCAD SHX Text
WALL THIMBLE
AutoCAD SHX Text
DOUBLE-WALL B-VENT
AutoCAD SHX Text
SINGLE WALL VENT
AutoCAD SHX Text
EXISTING IR HEATER
AutoCAD SHX Text
B TO C ADAPTER
AutoCAD SHX Text
36IN MIN.
AutoCAD SHX Text
6IN MIN.
AutoCAD SHX Text
SIDEWALL
AutoCAD SHX Text
1/4" PER FOOT DOWNWARD PITCH
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
MEP-201
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text 3/3/2026
AutoCAD SHX Text
DMA-BOWLING GREEN FMS EXTERIOR
AutoCAD SHX Text
MECH/ELECT DETAILS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
W. GRANT WILSON, PE
AutoCAD SHX Text
CONSULTANTS
AutoCAD SHX Text
PLLC
AutoCAD SHX Text
E-TECH
AutoCAD SHX Text
378 PARK AVENUE, LEXINGTON, KY 40502
AutoCAD SHX Text
SIDEWALL VENT TERMINATION DETAIL
AutoCAD SHX Text N.T.S.
1) GENERAL NOTES
A) SUBMITTALS
i) SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO ANY FABRICATION OR
CONSTRUCTION FOR ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING: STRUCTURAL
STEEL.
ii) IF THE SHOP DRAWINGS DIFFER FROM OR ADD TO THE DESIGN OF THE STRUCTURAL
DRAWINGS, THEY SHALL BEAR THE SEAL AND SIGNATURE OF THE REGISTERED PROFESSIONAL
ENGINEER LICENSED IN THE PROJECT STATE WHO IS RESPONSIBLE FOR THE DESIGN.
2) STRUCTURAL STEEL
A) STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND ERECTED BY AN APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH IBC CHAPTER 22, AISC 360, AISC 303, AND AWS.
B) STRUCTURAL STEEL SHALL CONFORM TO THE ASTM DESIGNATIONS INDICATED BELOW (UNO):
ANGLES, CHANNELS A36
THREADED ROD A36
HEAVY HEX NUTS A563
HARDENED STEEL WASHER F436
C) THE CONTRACTOR SHALL BE LIABLE FOR DIMENSIONS, FIT, TOLERANCES, FABRICATION, AND
ERECTION.
D) WELDING IS TO BE DONE BY AWS CERTIFIED WELDERS USING E70XX ELECTRODES (UNO). WELDS
SHALL BE PREQUALIFIED BY AWS. WELDING SHALL BE IN STRICT ADHERENCE TO A WRITTEN
WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1. WELDING PARAMETERS SHALL BE
WITHIN THE ELECTRODE MANUFACTURER’S RECOMMENDATIONS. WELDING PROCEDURES SHALL BE
SUBMITTED TO THE OWNER’S TESTING AGENCY FOR REVIEW BEFORE STARTING FABRICATION OR
ERECTION. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE
DRAWINGS. WHERE SHOWN, PROPER FIELD WELDING PER AWS D1.1 SHALL BE USED. WHERE NO
FIELD WELDING SYMBOLS ARE SHOWN, IT IS THE CONTRACTOR’S RESPONSIBILITY TO
COORDINATE THE USE OF SHOP AND FIELD WELDS TO FACILITATE THE STRUCTURAL STEEL
ERECTION.
E) PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO EFFECTIVE THROAT THICKNESS, SHOWN AS (E). SHOP WELDS SHALL BE MADE USING GMAW, FCAW, OR SAW
WELDING PROCESSES. FIELD WELDS SHALL BE MADE USING EITHER FCAW OR THE SMAW
WELDING PROCESSES. FILLER METALS SHALL COMPLY WITH THE AWS D1.1, TABLE 3.1, “PRE-
QUALIFIED BASE METAL-FILLER METAL COMBINATIONS FOR MATCHING STRENGTH”.
F) SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS. WELDS SHOWN ON THE
CONTRACT DRAWINGS ARE MINIMUM SIZES FOR STRENGTH. INCREASE WELD SIZE TO AWS
MINIMUM SIZE BASED ON THICKNESS OF THE MATERIAL BEING WELDED. MINIMUM WELD SIZE
SHALL BE 3/16” FOR MATERIAL THICKNESS 3/16” AND GREATER.
G) BACKUP BARS MAY REMAIN IN PLACE UNLESS NOTED ON PLANS, OR WHEN ULTRASONIC TEST
INDICATES A POSSIBLE WELD DEFECT. IF DEFECTS ARE INDICATED, BACKUP BAR IS TO BE
REMOVED AND ROOT INSPECTED. IF DEFECTS ARE FOUND, THEY ARE TO BE REMOVED BY
BACKGOUGING TO SOUND MATERIAL. CLEAN AND REPAIR WELD TO SPECIFIED SIZE PER AWS.
H) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOINT PREPARATIONS AND WELDING
PROCEDURES THAT INCLUDE BUT ARE NOT LIMITED TO: REQUIRED ROOT OPENINGS, ROOT FACE
DIMENSIONS, GROOVE ANGLES, BACKING BARS, COPES, SURFACE ROUGHNESS VALUES, AND
TAPERS OF UNEQUAL PARTS.
I) WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE WELDS AS SPECIFIED
IN AISC 360-10 TABLE J2.4.
J) THE USE OF E70-T4 WELDING WIRE IS NOT ALLOWED FOR ANY APPLICATION.
K) ALL WELD FILLER MATERIAL SHALL HAVE A MINIMUM CHARPY V-NOTCH (CVN) VALUE OF 20 FT-LB
AT A TEMPERATURE OF 0° F.
L) THE LOWEST ANTICIPATED SERVICE TEMPERATURE IS 0° F FOR DETERMINATION OF REQUIRED
CHARPY V-NOTCH TOUGHNESS LEVEL.
M) WELDED FILLER MATERIAL SPECIFIED AS “DEMAND CRITICAL WELD” OR “DCW” ON THE
STRUCTURAL DETAILS SHALL HAVE A MINIMUM CHARPY V-NOTCH (CVN) TOUGHNESS OF 20 FT-LBS
AT A TEMPERATURE OF -20° F, AS DETERMINED BY AWS CLASSIFICATION TEST METHOD OR
MANUFACTURER CERTIFICATION, AND 40 FT-LBS AT A TEMPERATURE OF 70° F, AS DETERMINED BY
AWS D1.1 AND D1.8 LATEST EDITION.
N) STEEL FRAMEWORK SHALL NOT BE ASSUMED STRUCTURALLY STABLE UNTIL ALL MEMBERS ARE IN PLACE AND CONNECTIONS ARE INSTALLED. ANY USE OF THE PARTIALLY ERECTED FRAMEWORK FOR
TEMPORARY SUPPORT OF ANY KIND SHALL BE DONE ONLY AT THE CONTRACTOR’S RISK.
O) BURNING OF HOLES IN STRUCTURAL STEEL IS NOT PERMITTED WITHOUT PRIOR APPROVAL OF THE
ENGINEER OR RECORD.
P) MAINTAIN WORK IN A SAFE AND STABLE CONDITION DURING ERECTION. PROVIDE TEMPORARY
SHORING AND BRACING MEMBERS AS REQUIRED, WITH CONNECTIONS OF SUFFICIENT STRENGTH
TO BEAR IMPOSED LOADS. REMOVE TEMPORARY MEMBERS AND CONNECTIONS WHEN PERMANENT
MEMBERS ARE IN PLACE AND FINAL CONNECTIONS ARE MADE. PROVIDE TEMPORARY GUY LINES TO
ACHIEVE PROPER ALIGNMENT AND STABILITY OF THE STRUCTURE AS ERECTION PROCEEDS.
Q) AFTER MATERIAL HAS BEEN PROPERLY CLEANED AND TREATED, APPLY SHOP PRIME COAT TO ALL
SURFACES, EXCEPT THOSE INTENDED FOR EMBEDMENT INTO CONCRETE OR TO RECEIVE FIELD
WELDING, SLIP CRITICAL BOLTS, OR CEMENTITIOUS FIREPROOFING. PROVIDE “TOUCH-UP” AT
SITE. MINIMUM DRY FILM THICKNESS SHALL BE 1.5 MIL.
3) POST-INSTALLED ANCHORS
A) PROVIDE POST-INSTALLED ANCHORS PER THE FOLLOWING (UNO):
i) GROUTED CMU
(1)ADHESIVE ANCHOR: HILTI HIT-HY 270 + HIT-V THREADED ROD
(2)ADHESIVE ANCHOR: SIMPSON STRONG-TIE SET 3G + F1554 GR. 36 THREADED ROD
ii) HOLLOW CMU
(1)ADHESIVE ANCHOR: HILTI HIT-HY 270 + HIT-V THREADED ROD
(2)ADHESIVE ANCHOR: SIMPSON STRONG-TIE SET 3G + F1554 GR. 36 THREADED ROD
B) ALL ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE SUPPLIER’S RECOMMENDATIONS.
C) USE OF ALTERNATE PRODUCTS OR POST-INSTALLED ANCHORS AT LOCATIONS NOT SHOWN IN
THESE DRAWINGS IS SUBJECT TO THE APPROVAL OF THE ENGINEER OF RECORD. SUBMIT
PROPOSED ANCHORS TO THE ENGINEER WITH AN ICC-ES REPORT VALID FOR THE REFERENCED
BUILDING CODE. THE SUBMITTED ICC-ES REPORT SHALL DEMONSTRATE THAT THE ANCHORS ARE
SUITABLE FOR USE IN BASE MATERIAL. WHERE ANCHORS RESIST SEISMIC LOADS, SUBMITTED
ICC-ES REPORT SHALL DEMONSTRATE THAT ANCHORS ARE SUITABLE FOR THE RESISTANCE OF
SEISMIC LOADS.
4) MISCELLANEOUS
A) NO CHANGE IN SIZE OF STRUCTURAL ELEMENTS OR MODIFICATION THEREOF SHALL BE MADE, NOR
ARE ANY OPENINGS OR SLEEVES THROUGH ANY STRUCTURAL ELEMENTS PERMITTED, UNLESS
DETAILED ON THE STRUCTURAL DRAWINGS.
B) CONSULT ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR LOCATION, SIZES, AND EXTENT OF CHASES.
C) NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND
TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE SHOWN FOR SIMILAR
WORK.
D) SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
i) SIZE AND LOCATION OF DOOR AND WINDOW OPENINGS IN WALLS, EXCEPT AS NOTED.
ii) SIZE AND LOCATION OF NON-LOAD-BEARING PARTITIONS, UNLESS NOTED ON STRUCTURAL
DRAWINGS.
iii) FLOOR AND ROOF FINISHES.
iv) DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS.
v) INSERTS, RECESSES, REGLETS, FINISHES, DEPRESSIONS, ETC. NOT SHOWN ON THE
STRUCTURAL DRAWINGS.
vi) DRAINAGE AND WATERPROOFING
E) SEE CIVIL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:
i) PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL, AND SLAB OPENINGS, ETC., EXCEPT AS
SHOWN OR NOTED.
ii) ELECTRICAL CONDUIT RUNS, BOXES, AND OUTLETS IN WALLS AND SLABS
iii) CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, OR PLUMBING FIXTURES.
iv) SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR MOUNTS, EQUIPMENT PADS, AND UNDERGROUND UTILITIES.
v) FINISHED GRADE, SITE PAVING, AND ELEVATIONS
F) OPENINGS, POCKETS, ETC., LARGER THAN 6” SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS, UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., LARGER THAN 6” NOT
SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN STRUCTURAL MEMBERS.
FOR ANY FURTHER RESTRICTIONS ON OPENINGS IN STRUCTURAL ELEMENTS, SEE APPLICABLE
SECTIONS BELOW. GROUPS OF SLEEVES/PENETRATIONS SHALL BE CONSIDERED AS ONE OPENING.
G) PIPES LARGER THAN 1 1/2" DIAMETER SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED. NO CONDUIT/PIPING SHALL BE PLACED IN CONCRETE
FILL OVER METAL DECKING.
H) CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED ROOF OR FLOOR. LOAD
SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING
AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.
5) CONTRACTOR RESPONSIBILITIES
A) MATERIAL, WORKMANSHIP, AND DESIGN SHALL CONFORM TO THE BUILDING CODE.
B) CONTRACT DRAWINGS ARE CONSIDERED TO BE PART OF THE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL THE
DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO THE START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN
CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED
BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR
ARCHITECT/ENGINEER.
C) VERIFY THE DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS BEFORE STARTING WORK. ANY DISCREPANCY BETWEEN SUCH DETAILS AND DIMENSIONS AS MAY OCCUR SHALL BE REPORTED TO
THE ARCHITECT/EOR FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
D) DUE TO THE NATURE OF THE WORK, ALL DIMENSIONS AND/OR EXISTING DETAILS SHOWN ON THE
DRAWINGS THAT WILL IN ANY WAY AFFECT THE WORK SHALL BE FIELD-VERIFIED PRIOR TO
FABRICATION OF ANY MATERIALS. FIELD-VERIFICATION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. IF THERE IS ANY QUESTION TO THE INTENT OF THE WORK INDICATED, THE
CONTRACTOR SHALL CLEAR THE QUESTION WITH THE ARCHITECT/EOR. FIELD-VERIFY TOP OF
EXISTING CONCRETE AND TOP OF EXISTING STEEL AT LOCATIONS WHERE NEW STRUCTURE
CONNECTS TO EXISTING STRUCTURE.
E) THE CONTRACTOR SHALL BE AWARE THAT THE WORK INVOLVES ADDITIONS TO AN EXISTING
FACILITY THAT WILL REMAIN IN OPERATION DURING CONSTRUCTION. IT IS THEREFORE
MANDATORY FOR WORK THAT WILL IN ANY WAY AFFECT THE NORMAL OPERATION OF THE FACILITY
BE COORDINATED WITH THE OWNER.
F) NOTIFY, IN WRITING, THE EOR OF CONDITIONS ENCOUNTERED IN THE FIELD DIFFERENT FROM
THOSE SHOWN IN THE STRUCTURAL DOCUMENTS.
G) THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL
PROVIDE ALL MEASURES NECESSARY SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING,
SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE
SITE BY THE EOR SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.
H) HEAVY EQUIPMENT, CRANES, AND MATERIAL STOCKPILES SHALL NOT BE LOCATED ON OR
ADJACENT TO SHORING OR RETAINING WALLS UNLESS ACCEPTED BY THE EOR. ACCEPTANCE
SHALL BE BASED ON ANALYSIS AND EVALUATION PERFORMED BY THE CONTRACTOR AND
REVIEWED BY THE EOR.
I) AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER MUST BE OBTAINED AT
LEAST TWO WORKING DAYS BEFORE STARTING EXCAVATION WORK.
J) CONTRACTOR HAS SOLE RESPONSIBILITY FOR THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION
BRACING, SHORING, TEMPORARY SUPPORTS, ETC.
K) CONTRACTOR HAS SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA SAFETY REGULATIONS.
L) CONTRACTOR SUBMITTALS/SHOP DRAWINGS
i) SUBMITTALS FOR STRUCTURAL STEEL SHALL BE SUBMITTED FOR REVIEW PRIOR TO
FABRICATION OF THESE ITEMS.
ii) DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE EOR; THEREFORE, THEY SHALL BE
VERIFIED BY THE CONTRACTOR. CONTRACTOR SHALL REVIEW AND STAMP THE DRAWINGS FOR
CONFORMANCE WITH THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND OPERATIONS OF
CONSTRUCTION, AND ALL SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO.
iii) SHOP DRAWINGS SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE
PURPOSE OF SHOP DRAWINGS SUBMITTALS IS TO DEMONSTRATE TO THE ENGINEER THAT THE
CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT, BY INDICATING WHICH MATERIAL IS
INTENDED TO BE FURNISHED AND INSTALLED, AND BY DETAILING THE INTENDED FABRICATION
AND INSTALLATION METHOD. IF ANY DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN
SHOP DRAWINGS AND THE CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR
AFTER SHOP DRAWING SUBMITTALS ARE PROCESSED BY THE EOR, THE CONTRACT DRAWINGS
AND SPECIFICATIONS SHALL CONTROL AND SHALL BE FOLLOWED.
iv) SHOP DRAWINGS OF DESIGN-BUILD COMPONENTS INCLUDING STAIRS BY OTHERS SHALL
INCLUDE THE DESIGNING PROFESSIONAL ENGINEER’S STAMP, FROM THE PROJECT STATE AND
SHALL BE APPROVED BY THE COMPONENT DESIGNER PRIOR TO CURSORY REVIEW BY THE EOR
FOR LOADS IMPOSED ON THE BASIC STRUCTURE. THE COMPONENT DESIGNER IS RESPONSIBLE
FOR CODE CONFORMANCE AND ALL NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT
ON ARCHITECTURAL OR STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL INDICATE
MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE BASIC STRUCTURE. DESIGN
CALCULATIONS SHALL BE INCLUDED IN THE SUBMITTAL.
v) REVIEW OF SUBMITTALS OR SHOP DRAWINGS BY THE EOR DOES NOT RELIEVE THE
CONTRACTOR OF THE SOLE RESPONSIBILITY TO REVIEW AND CHECK ALL SUBMITTALS AND
SHOP DRAWINGS BEFORE SUBMITTING TO THE STRUCTURAL ENGINEER. CONTRACTOR REMAINS
SOLELY RESPONSIBLE FOR THE ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION
OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS
SPECIFIED IN THE CONTRACT DOCUMENT.
vi) DIMENSIONS NOTED AS PLUS OR MINUS (±) INDICATE UNVERIFIED DIMENSIONS AND ARE
APPROXIMATE. NOTIFY ARCHITECT IMMEDIATELY OF CONFLICTS OR EXCESSIVE VARIATIONS
FROM INDICATED DIMENSIONS. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED
DIMENSIONS–DO NOT SCALE DRAWINGS. DIMENSIONS OF EXISTING CONDITIONS MAY BE
BASED ON RECORD DRAWINGS AND ARE TO BE FIELD-VERIFIED BY THE CONTRACTOR.
vii)CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE COMMENCING ANY
DEMOLITIONS. CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING OF ALL
STRUCTURAL MEMBERS, EXISTING CONSTRUCTION AND SOIL EXCAVATIONS, AS REQUIRED,
AND IN A MANNER SUITABLE TO THE WORK SEQUENCE. TEMPORARY SHORING AND BRACING
SHALL NOT BE REMOVED UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN
ACCORDANCE WITH THE DRAWINGS AND MATERIALS HAVE ACHIEVED DESIGN STRENGTH. NO
REINFORCING BAR IN EXISTING CONSTRUCTION SHALL BE CUT UNLESS DIRECTED TO BY THE
ARCHITECT OR AS SHOWN ON THE DRAWINGS.
DESIGN LOADS AND CRITERIA
ALL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE INTERNATIONAL
BUILDING CODE (IBC), 2015 EDITION, AS AMENDED BY THE COMMONWEALTH OF KENTUCKY.
ROOF LIVE LOADS
THE FOLLOWING UNIFORM ROOF LIVE LOADS WERE DETERMINED USING ASCE 7 CHAPTER 4 IN
ACCORDANCE WITH IBC SECTION 1607. LIVE LOADS ARE REDUCED WHERE ALLOWED BY THE
BUILDING CODE.
OCCUPANCY OR USE LOAD (PSF)
ROOF LIVE LOAD: 20 (NONREDUCIBLE)
SNOW LOADS
THE FOLLOWING SNOW LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTER 7 IN
ACCORDANCE WITH IBC SECTION 1608.
Pg = 15 PSF Ce = 1.0 Is = 1.0 Ct = 1.0 Pf = 15 PSF Cs = 1.0 Ps = 15 PSF
WIND LOADS
THE FOLLOWING WIND LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 26-31 IN
ACCORDANCE WITH IBC SECTION 1609.
ULTIMATE DESIGN WIND SPEED (Vult): 115 MPH NOMINAL DESIGN WIND SPEED (Vasd): 90 MPH
RISK CATEGORY: II
WIND EXPOSURE CATEGORY: C
INTERNAL PRESSURE COEFFICIENT: +/-0.18
UNLESS NOTED OTHERWISE, COMPONENT AND CLADDING DESIGN WIND PRESSURES SHALL BE
DETERMINED USING ASCE 7 CHAPTER 30 BY THE REGISTERED PROFESSIONAL ENGINEER LICENSED
IN THE PROJECT STATE WHO IS RESPONSIBLE FOR THE DESIGN OF SUCH ELEMENTS.
SEISMIC LOADS
THE FOLLOWING SEISMIC LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 11-23 IN
ACCORDANCE WITH IBC SECTION 1613.
SEISMIC DESIGN CATEGORY: D
RISK CATEGORY: II
IMPORTANCE FACTOR (Ie): 1.0
SITE CLASS: D
Ss = 0.287 g Sds = 0.301 g S1 = 0.139 g Sd1 = 0.208 g
BASIC SEISMIC FORCE-RESISTING SYSTEM: ORDINARY PLAIN MASONRY SHEAR WALLS
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
R = 1.5 Cs = 0.06
RTA DATE
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
PHASE
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
ACCOUNT NO.
500 West Jefferson Street, Suite 2200 Louisville, KY 40202 (502)325-0100 www.kpff.com
AS BUILT DATE
DECA LOG #
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
S001
GENERAL NOTES & DESIGN CRITERIA
Bowling Green FMS Renovation
04/24/26
RTA
SL
SS
Project Number
04/24/26
ACIP AUGER CAST-IN-PLACE
ADDL ADDITIONAL
ALT ALTERNATE
ARCH ARCHITECTURAL
B/ BOTTOM OF
BF BRACED FRAME
BM BEAM
BOT BOTTOM
BRG BEARING
CANT CANTILEVER
CFS COLD-FORMED STEEL
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CTR CENTER(ED)
CW CONCRETE WALL
D DEEP
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DEV DEVELOPMENT
DGA DENSE-GRADED AGGREGATE
DIA DIAMETER
DIM DIMENSION
DWGS DRAWINGS
DWL DOWEL
EF EACH FACE
EL ELEVATION
ELEV ELEVATOR
EMBED MINIMUM EMBEDMENT LENGTH
EOD EDGE OF DECK
EOR ENGINEER OF RECORD
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FRC FIBER REINFORCED CONCRETE
FRP FIBER REINFORCED POLYMER
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GR GRADE
HORIZ HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
ILO IN LIEU OF
INT INTERIOR
JST JOIST
K KIPS (1000 POUNDS)
LB POUND(S)
LFH LONG FACE HORIZONTAL
LFV LONG FACE VERTICAL
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOCN LOCATIONS
LW LIGHT WEIGHT
MANUF MANUFACTURER
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
MW MASONRY WALL
ND NOMINAL DIAMETER
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
NW NORMAL WEIGHT
OC ON CENTER
OH OPPOSITE HAND
OPNG OPENING
P PIER
PAF POWDER-ACTUATED FASTENER
PEMB PRE-ENGINEERED METAL
BUILDING
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUNDS PER LINEAR FOOT
PSF POUNDS PER SQUARE FOOT
PT POST-TENSIONED
PT PRESSURE TREATED
R RADIUS
REF REFERENCE
REINF REINFORCEMENT
REQD REQUIRED
SCHED SCHEDULE
SEL SELECTIVE
SIM SIMILAR
SOG SLAG ON GRADE
SPA SPACES/SPACING
STD STANDARD
T&B TOP AND BOTTOM
T/ TOP OF
THK THICK
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W WIDE
w/ WITH
WF WALL FOOTING
WP WORK POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
WWR WELDED WIRE REINFORCEMENT
STRUCTURAL ABBREVIATIONS
4/2 4/2
EX ROOF BAR JOISTS
EX BAR JOIST
BRIDGING (TYP)
EX RETROFIT
HIP ROOF LINES
S101
S101
S101
S101
S101
T R U E
N O
R T H
NORTH
EX MASONRY WALL
EX JOIST BRIDGING (VIF)
L3x3x3/8 x 0'-4" w/ 1/2"Ø
THREADED ROD IN HILTI HIT-HY
270 SYSTEM & SCREEN TUBE
(4" EMBEDMENT)
L6X3 1/2X3/8 (LLO) x 0'-4" w/
1/2"Ø THREADED ROD IN HILTI
HIT-HY 270 SYSTEM & SCREEN
TUBE (4" EMBEDMENT)
3 SIDES
3/16
GAP BETWEEN WALL &
BRIDGING CONNECTION
RTA DATE
A&E FILE NO.
CHECKED BY
DRAWN BY
DRAWING DATE
DRAWING INFORMATION
DRAWING NO.
PHASE
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
ACCOUNT NO.
500 West Jefferson Street, Suite 2200 Louisville, KY 40202 (502)325-0100 www.kpff.com
AS BUILT DATE
DECA LOG #
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
S101
STRUCTURAL PLAN & DETAILS
Bowling Green FMS Renovation
04/24/26
RTA
SL
SS
Project Number
04/24/26
SCALE: 1/8" = 1'-0"1 ROOF FRAMING PLAN
SCALE: 1 1/2" = 1'-0"2 TYP JOIST BRIDGING CONN REINF DETAIL
4/2 4/2
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
| CC0D Addendum 01 |
| CC0D DMA - Bowling Green FMS Addendum One |
| DRAWING MEP-101A “MECHANICAL ELECTRICAL PLAN” |
| - Refer to Drawing |
| o Revise Coded Sheet Note 4 to read “Remove and reinstall wall brackets, existing Lennox mini-split unit. Provide new condensate, new disconnect power, and new Refrigerant Line Set. Provide new condensate and new white aluminum line set wrap over line... |
| o At exterior wall to Secure Storage, add requirement for “remove and replace with new gooseneck pvc vent” to meet IMC Codes. Refer to Coded Sheet Note #3. |
| o At exterior wall to Secure Storage, remove Coded Sheet Note #1 and Louver L-3 with add requirements to “remove louver, patch and paint wall at removed louver opening”. |
| o In Garage Bay, near exterior Secure Storage wall, add requirement to “remove old electric button and approximately 16” of conduit and electrical LB”. |
| o At plan north Garage Bay exterior wall, between two Storage rooms, revise note from “Existing exhaust air vent” to add requirements to “Replace existing dryer exhaust air vent with new metallic exhaust vent”. In addition to work in this area and add... |
| DRAWING MEP-101B “MECHANICAL ELECTRICAL PLAN” |
| - Refer to Drawing |
| o Revise Coded Sheet Note 4 to read “Remove and reinstall wall brackets, existing Lennox mini-split unit. Provide new condensate, new disconnect power, and new Refrigerant Line Set. Provide new condensate and new white aluminum line set wrap over line... |
| o At plan north Garage Bay exterior wall, add requirements to “Remove & Reinstall oil burner flue, through wall, on wall and up through soffit & roof”. Provide new sidewall vent termination. Refer to New Detail on Sheet MEP-201. Note: there are two ap... |
| o On exterior plan north corner of Garage Bay, add requirements to “coordinate with local power company to protect OH service and weatherhead/conduits down to meter” throughout the project. |
| o At plan south Garage Bay exterior wall, add requirements to “Remove & Reinstall oil burner flue, through wall, on wall and up through soffit & roof”. Provide new sidewall vent termination. Refer to New Detail on Sheet MEP-201. Note: there are two ap... |
| DRAWING MEP-201 “MECHANICAL ELECTRICAL DETAILS” |
| - Refer to Drawing |
| o Add Detail #3 “Sidewall Vent Termination Detail” to Contract Documents. This detail applies to all existing sidewall vent terminations for new work awith connection to existing heaters. |
| - Refer to Drawing |
| o Add structural reinforcement at existing bar joist bridging per attached structural drawings. |
| CC0D MEP101A |
| Sheets and Views |
| MEP-101 |
| CC0D MEP101B |
| Sheets and Views |
| MEP-101 |
| CC0D MEP201 |
| Sheets and Views |
| MEP-201 |
| CC0D STRUCTURAL |
| Sheets |
| S001 - GENERAL NOTES & DESIGN CRITERIA |
| S101 - STRUCTURAL PLAN & DETAILS |
File details come from the government source that posted it. Updated .