This Addendum One modifies the construction documents for the Schwendeman Interior Refurbishment project at Thompson Hall under the Department of Criminal Justice Training in Richmond, Kentucky, issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration under Invitation to Bid No. RFB-232-26. The project encompasses interior refurbishment work across four floors of Thompson Hall, including demolition, flooring installation (carpet tile and luxury vinyl tile), painting, radiant floor panel work, furniture installation, and related finishes. The proposed project schedule begins with a furniture order on April 10, 2026, followed by a bidding and contract phase of 60 days ending May 14, 2026, shop drawings and coordination lasting 30 days through June 13, 2026, and procurement phases with lead times extending through September 5, 2026. Construction is scheduled to commence on July 25, 2026, with floor-by-floor phasing through February 25, 2027, when substantial completion is targeted, followed by a 30-day final completion period concluding March 27, 2027. The total construction duration is 287 days.
The addendum establishes furniture storage allowances through Office Resources Inc. with four tiered cost structures: Storage Allotment #1 at $16,425 for 73 days ($225 per day), Storage Allotment #2 at $11,137.50 for 66 days ($168.75 per day), Storage Allotment #3 at $7,425 for 66 days ($112.50 per day), and Storage Allotment #4 at $3,712.50 for 66 days ($56.25 per day), with the contractor responsible for any costs exceeding the allotted time durations. The addendum clarifies specifications and drawing discrepancies regarding flooring materials across multiple sheets, designating specific carpet tile types (CPT-1, CPT-2, CPT-3) and luxury vinyl tile (LVT-1) for various room types including student rooms, classrooms, corridors, vestibules, and lounges. Additional clarifications address corner guard and rub rail installations, radiant floor panel temporary removal and reinstallation responsibilities, and the specification of JES Lighting Vantage Series RT52-RS1 free-standing lamps with existing electrical infrastructure at each location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000471_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000471_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-232-26
FOR: Schwendeman Interior Refurbishment Thompson Hall Department of Criminal Justice Training Richmond, Kentucky
DATE: April 7, 2026
RFB-785-2600000471
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-232-26 For: Schwendeman Interior Refurbishment Thompson Hall Department of Criminal Justice Training Richmond, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Addendum 1 Page 1 of 3
201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538
Addendum No. 1 For the DOCJT Schwendeman Interior Refurbishment
Richmond, Kentucky Invitation to Bid NO: RFB-232-26
April 15th, 2026
The following addendum items officially modify the construction documents and become binding to the contract for construction (Contractor is to note receipt of all addendums on their bid form of proposal):
1. General:
1.1. Allowance – Furniture Storage Allotment by ORI (Office Resources Inc.), contractor will be responsible for any days over the allotted time durations:
1.1.1. Storage allotment #1(73 days) = $16,425 ($225 per day)
1.1.2. Storage allotment #2 (66 days) = $11,137.50 ($168.75 per day)
1.1.3. Storage allotment #3 (66 days) = $7,425 ($112.50 per day)
1.1.4. Storage allotment #4 (66 days) = $3,712.50 ($56.25 per day)
1.2. Proposed Project schedule:
Furniture Order April 10, 2026
Bidding / contract 60 May 14, 2026
Shop Drawings / Coordination 30 June 13, 2026
FF&E procurement / Lead time 126 August 14, 2026
Carpet Lead Time 42 July 25, 2026
LVT Lead Time 84 September 5, 2026
Construction Floors 1 59 July 25, 2026 September 22, Demo 10
Slab Jack 7
Painting 14
Carpet 14
Furniture 14
Construction Floors 4 52 September 22, November 13, Construction Floors 3 52 November 13, 2026 January 4, 2027
Construction Floors 2 52 January 4, 2027 February 25, 2027
Substantial Completion February 25, 2027
Final Completion 30 March 27, 2027
Days of Construction 287
Addendum 1 Page 2 of 3
2. Architectural:
Drawing:
2.1. Sheets 2A801A, 2A801B, 2A802A, 2A802B, 2A803A, 2A803B, 2A804A, 2A804B:
2.1.1. Corner Guard Locations are indicated.
2.1.2. Contractor is responsible for temporary removal and re-installation of radiant floor panels as necessary to facilitate demo and new flooring install. Locations are indicated on plans.
3. Bidders Questions:
3.1. Question: Drawing 2A801A depicts CPT-2 being installed in certain corridors, while Drawing
2A804C depicts CPT-1 in those same areas.
Answer: CPT-2 is the same tile as CPT-1B. Please use 2A804C as reference for design intent.
3.2. Question: Drawing 2A802A depicts CPT-2 being installed in rooms titled Classroom, while Drawing
2A804D depicts CPT-1A going into those areas.
Answer: Classroom areas should be CPT-2.
3.3. Question: Drawing 2A802A depicts CPT-3 being installed in the vestibules, while Drawing 2A804D depicts LVT-1 there.
Answer: Vestibules should be CPT-3.
3.4. Question: Drawing 2A802A depicts LVT-1 being installed in the northeast corridor, while Drawing 2A804D depicts a combination of CPT-1A, CPT-1B, and CPT-1C in that same area.
Answer: Reference 2802A for finish limits. 2A804D should be used as reference only as it pertains to CPT-1 pattern installations.
3.5. Question: Drawing 2A803A depicts CPT-2 being installed in rooms titled Classroom, while Drawing 2A804E depicts CPT-1A going in those areas.
Answer: Classroom areas should be CPT-2.
3.6. Question: Drawing 2A804A depicts CPT-2 being installed in rooms titled Copy/Fax, while Drawing
2A804E depicts CPT-1 in those same areas.
Answer: Reference 2802A for finish limits. 2A804D should be used as reference only as it pertains to CPT-1 pattern installations.
3.7. Question: Is CPT-1C supposed to be CPT-2, and CPT-2 supposed to be CPT-1C? Sizes don’t match to create pattern desired.
Addendum 1 Page 3 of 3
Answer: CPT-2 is the same tile as CPT-1B; they have been separated to communicate installation at areas such as the classroom, where CPT-1 patterns are not present. CPT-1C is a
3.8. Question: Sheet 2A810 calls for us to provide lamps. We have the following questions on those lamps:
3.8.1. Do you have the model number?
3.8.2. Will these be free standing or bolted down?
3.8.3. Is there existing electric at each lamp location?
Answer: Lamps will be free standing. There is existing electric at each lamp location. Basis of Design is JES Lighting, Vantage Series, RT52-RS1.
3.9. Question: Incorrect scale indicated on Plan, whereas no dimension are provided on the Installation Plan for calibration. Only, dimension are available on the S2.1 Existing Slab on Grade Plan, and the Installation Plan scale has been calibrated based on a 3'-0" SDNT room door size. It is also to be noted that the drawings received are dated 4/25/24. Please Clarify
Answer: Floor Elevation Analysis plans by Ayoroa I Simmons are slab survey elevations for reference only. Structural Drawing S2.1 indicates limits of slab jacking and is to scale.
3.10. Question: Section 102600 - Wall and Door Protection. Corner guards are listed in the specs
(pg. 149) and listed in the finish legend, however I don't see a mark in the plans indicating where they are to be installed. Please clarify.
Answer: See attached revised sheets 2A801A, 2A801B, 2A802A, 2A802B, 2A803A, 2A803B, 2A804A, 2A804B, for corner guard locations.
END OF ADDENDUM
CPT-1 (1A,1B,&1C COMBINED)
CPT-2
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
LOUNGE
LVT-1
EXISTING
EXISTING
CPT-2
CPT-2
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR 1A
CPT-2
CPT-3
LVT-1
1 1
1 1 1
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:2
AM
2A801A
1ST FLOOR FINISH PLAN - SECTOR A
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A801A1 FINISH PLAN
1 ADDENDUM #1 4/6/2026
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC.SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
TYP. ADA ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
SDNT.ROOM
CPT-2
RB-1
PT-1
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
TYP. SDNT ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CORRIDOR 1D
CPT-1
RB-1
PT-1, RR-1
CPT-3 CPT-3
2A810
2A810
FLOOR:
BASE:
WALL:
BREAK ROOM
LVT-1
RB-1
PT-1
1 1
1 1 1 1 1
CPT-1 (1A,1B,&1C COMBINED)
CPT-2
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A801B
1ST FLOOR FINISH PLAN - SECTOR B
AM
BJ
SCALE: 1/8" = 1'-0"2A801B1 FINISH PLAN
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
VEND.
FLOOR:
BASE:
WALL:
LOUNGE
LVT-1
EXISTING
EXISTING
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
COURT
ROOM/CLASSROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
CLASSROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
CLASSROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
CLASSROOM
FLOOR:
BASE:
WALL:
VEST.
CPT-3
RB-1
PT-1, RR-1
FLOOR:
BASE:
WALL:
VEST.
CPT-3
RB-1
PT-1
FLOOR:
BASE:
WALL:
LVT-1
RB-1
PT-1, RR-1
CORRIDOR
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
CPT-1
2A805
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A802A
2ND FLOOR FINISH PLAN - SECTOR A
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A802A1 FINISH PLAN
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC. SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC. SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
1 1
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A802B
2ND FLOOR FINISH PLAN - SECTOR B
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A802B1 FINISH PLAN
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
CLASSROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
CLASSROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
EXISTING
BREATH TEST
CLASSROOM
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
COPY/FAX
VEND.
FLOOR:
BASE:
WALL:
LVT-1
RB-1
PT-1, RR-1
LOUNGE
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
LVT-1
CPT-1
1 1
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A803A
3RD FLOOR FINISH PLAN - SECTOR A
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A803A1 FINISH PLAN 1 ADDENDUM #1 4/6/2026
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC. SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC. SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A803B
3RD FLOOR FINISH PLAN - SECTOR B
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A803B1 FINISH PLAN
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
LVT-1
RB-1
PT-1, RR-1
LOUNGE
FLOOR:
BASE:
WALL:
LVT-1
RB-1
PT-1, RR-1
CONFERENCE
FLOOR:
BASE:
WALL:
COPY/FAX
CPT-2
RB-1
PT-1, RR-1
FLOOR:
BASE:
WALL:
COPY/FAX
CPT-2
RB-1
PT-1, RR-1
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
LVT-1
CPT-1
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:3
AM
2A804A
4TH FLOOR FINISH PLAN - SECTOR A
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A804A1 FINISH PLAN
GRAPHIC FINISH LEGEND
CPT-3
LVT-1
OUT OF SCOPE.
EXISTING TO
REMAIN.
NEW PAINT, PT-1
NEW RUB RAIL, RR-1
NEW CORNER GUARD, CG-1
TEMPORARILY REMOVE AND
RE-INSTALL RADIANT FLOOR
PANELS AS NECESSARY TO
FACILIATE FLOOR DEMO AND
NEW FLOORING INSTALL.
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
HC.SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-2
RB-1
PT-1
SDNT.ROOM
FLOOR:
BASE:
WALL:
CPT-1
RB-1
PT-1, RR-1
CORRIDOR
C
COMMONWEALTH
T
RE
R
A
HC
I
N
KE UT
OF
B
3 87
I
REG
No.
TS E
NT U
CE
YK T
NER
DER
RB
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
CJT - THOMPSON HALL
SCHWENDEMAN INTERIOR REFURBISHMENT
FEBRUARY 2026
525CAVKCJ3700
{RECORD DWG. DATE}
RTA
2024/04/25
4/ 7/
0:
:4
AM
2A804B
4TH FLOOR FINISH PLAN - SECTOR B
AM
BJ
FINISH LEGEND
NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION
PLANS
SEE MANUFACTURER INSTALLATION PLANS
CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS
PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY
RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES
CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH CORNER GUARDS.
RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION
PLANS
TO MATCH WALLS. FIELD VERIFY
SCALE: 1/8" = 1'-0"2A804B1 FINISH PLAN
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
| 2353_Addendum 01_ |
| 2353_DOCJT_Sch-Thomp_Addendum01 (002) |
| 2A801A - 1ST FLOOR FINISH PLAN - SECTOR A |
| 2A801B - 1ST FLOOR FINISH PLAN - SECTOR B |
| 2A802A - 2ND FLOOR FINISH PLAN - SECTOR A |
| 2A802B - 2ND FLOOR FINISH PLAN - SECTOR B |
| 2A803A - 3RD FLOOR FINISH PLAN - SECTOR A |
| 2A803B - 3RD FLOOR FINISH PLAN - SECTOR B |
| 2A804A - 4TH FLOOR FINISH PLAN - SECTOR A |
| 2A804B - 4TH FLOOR FINISH PLAN - SECTOR B |
File details come from the government source that posted it. Updated .