This Addendum One modifies the construction documents for the Schwendeman Interior Refurbishment project at Thompson Hall under the Department of Criminal Justice Training in Richmond, Kentucky, issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration under Invitation to Bid No. RFB-232-26. The project encompasses interior refurbishment work across four floors of Thompson Hall, including demolition, flooring installation (carpet tile and luxury vinyl tile), painting, radiant floor panel work, furniture installation, and related finishes. The proposed project schedule begins with a furniture order on April 10, 2026, followed by a bidding and contract phase of 60 days ending May 14, 2026, shop drawings and coordination lasting 30 days through June 13, 2026, and procurement phases with lead times extending through September 5, 2026. Construction is scheduled to commence on July 25, 2026, with floor-by-floor phasing through February 25, 2027, when substantial completion is targeted, followed by a 30-day final completion period concluding March 27, 2027. The total construction duration is 287 days.

The addendum establishes furniture storage allowances through Office Resources Inc. with four tiered cost structures: Storage Allotment #1 at $16,425 for 73 days ($225 per day), Storage Allotment #2 at $11,137.50 for 66 days ($168.75 per day), Storage Allotment #3 at $7,425 for 66 days ($112.50 per day), and Storage Allotment #4 at $3,712.50 for 66 days ($56.25 per day), with the contractor responsible for any costs exceeding the allotted time durations. The addendum clarifies specifications and drawing discrepancies regarding flooring materials across multiple sheets, designating specific carpet tile types (CPT-1, CPT-2, CPT-3) and luxury vinyl tile (LVT-1) for various room types including student rooms, classrooms, corridors, vestibules, and lounges. Additional clarifications address corner guard and rub rail installations, radiant floor panel temporary removal and reinstallation responsibilities, and the specification of JES Lighting Vantage Series RT52-RS1 free-standing lamps with existing electrical infrastructure at each location.

View the file

Other files

File Type Posted
Final_RFB_785_2600000471_1_SO_FORM.PDF PDF
Final_RFB_785_2600000471_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-232-26

FOR: Schwendeman Interior Refurbishment Thompson Hall Department of Criminal Justice Training Richmond, Kentucky

DATE: April 7, 2026

RFB-785-2600000471

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-232-26 For: Schwendeman Interior Refurbishment Thompson Hall Department of Criminal Justice Training Richmond, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Addendum 1 Page 1 of 3

201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538

Addendum No. 1 For the DOCJT Schwendeman Interior Refurbishment

Richmond, Kentucky Invitation to Bid NO: RFB-232-26

April 15th, 2026

The following addendum items officially modify the construction documents and become binding to the contract for construction (Contractor is to note receipt of all addendums on their bid form of proposal):

1. General:

1.1. Allowance – Furniture Storage Allotment by ORI (Office Resources Inc.), contractor will be responsible for any days over the allotted time durations:

1.1.1. Storage allotment #1(73 days) = $16,425 ($225 per day)

1.1.2. Storage allotment #2 (66 days) = $11,137.50 ($168.75 per day)

1.1.3. Storage allotment #3 (66 days) = $7,425 ($112.50 per day)

1.1.4. Storage allotment #4 (66 days) = $3,712.50 ($56.25 per day)

1.2. Proposed Project schedule:

Furniture Order April 10, 2026

Bidding / contract 60 May 14, 2026

Shop Drawings / Coordination 30 June 13, 2026

FF&E procurement / Lead time 126 August 14, 2026

Carpet Lead Time 42 July 25, 2026

LVT Lead Time 84 September 5, 2026

Construction Floors 1 59 July 25, 2026 September 22, Demo 10

Slab Jack 7

Painting 14

Carpet 14

Furniture 14

Construction Floors 4 52 September 22, November 13, Construction Floors 3 52 November 13, 2026 January 4, 2027

Construction Floors 2 52 January 4, 2027 February 25, 2027

Substantial Completion February 25, 2027

Final Completion 30 March 27, 2027

Days of Construction 287

Addendum 1 Page 2 of 3

2. Architectural:

Drawing:

2.1. Sheets 2A801A, 2A801B, 2A802A, 2A802B, 2A803A, 2A803B, 2A804A, 2A804B:

2.1.1. Corner Guard Locations are indicated.

2.1.2. Contractor is responsible for temporary removal and re-installation of radiant floor panels as necessary to facilitate demo and new flooring install. Locations are indicated on plans.

3. Bidders Questions:

3.1. Question: Drawing 2A801A depicts CPT-2 being installed in certain corridors, while Drawing

2A804C depicts CPT-1 in those same areas.

Answer: CPT-2 is the same tile as CPT-1B. Please use 2A804C as reference for design intent.

3.2. Question: Drawing 2A802A depicts CPT-2 being installed in rooms titled Classroom, while Drawing

2A804D depicts CPT-1A going into those areas.

Answer: Classroom areas should be CPT-2.

3.3. Question: Drawing 2A802A depicts CPT-3 being installed in the vestibules, while Drawing 2A804D depicts LVT-1 there.

Answer: Vestibules should be CPT-3.

3.4. Question: Drawing 2A802A depicts LVT-1 being installed in the northeast corridor, while Drawing 2A804D depicts a combination of CPT-1A, CPT-1B, and CPT-1C in that same area.

Answer: Reference 2802A for finish limits. 2A804D should be used as reference only as it pertains to CPT-1 pattern installations.

3.5. Question: Drawing 2A803A depicts CPT-2 being installed in rooms titled Classroom, while Drawing 2A804E depicts CPT-1A going in those areas.

Answer: Classroom areas should be CPT-2.

3.6. Question: Drawing 2A804A depicts CPT-2 being installed in rooms titled Copy/Fax, while Drawing

2A804E depicts CPT-1 in those same areas.

Answer: Reference 2802A for finish limits. 2A804D should be used as reference only as it pertains to CPT-1 pattern installations.

3.7. Question: Is CPT-1C supposed to be CPT-2, and CPT-2 supposed to be CPT-1C? Sizes don’t match to create pattern desired.

Addendum 1 Page 3 of 3

Answer: CPT-2 is the same tile as CPT-1B; they have been separated to communicate installation at areas such as the classroom, where CPT-1 patterns are not present. CPT-1C is a

3.8. Question: Sheet 2A810 calls for us to provide lamps. We have the following questions on those lamps:

3.8.1. Do you have the model number?

3.8.2. Will these be free standing or bolted down?

3.8.3. Is there existing electric at each lamp location?

Answer: Lamps will be free standing. There is existing electric at each lamp location. Basis of Design is JES Lighting, Vantage Series, RT52-RS1.

3.9. Question: Incorrect scale indicated on Plan, whereas no dimension are provided on the Installation Plan for calibration. Only, dimension are available on the S2.1 Existing Slab on Grade Plan, and the Installation Plan scale has been calibrated based on a 3'-0" SDNT room door size. It is also to be noted that the drawings received are dated 4/25/24. Please Clarify

Answer: Floor Elevation Analysis plans by Ayoroa I Simmons are slab survey elevations for reference only. Structural Drawing S2.1 indicates limits of slab jacking and is to scale.

3.10. Question: Section 102600 - Wall and Door Protection. Corner guards are listed in the specs

(pg. 149) and listed in the finish legend, however I don't see a mark in the plans indicating where they are to be installed. Please clarify.

Answer: See attached revised sheets 2A801A, 2A801B, 2A802A, 2A802B, 2A803A, 2A803B, 2A804A, 2A804B, for corner guard locations.

END OF ADDENDUM

CPT-1 (1A,1B,&1C COMBINED)

CPT-2

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

LOUNGE

LVT-1

EXISTING

EXISTING

CPT-2

CPT-2

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR 1A

CPT-2

CPT-3

LVT-1

1 1

1 1 1

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:2

AM

2A801A

1ST FLOOR FINISH PLAN - SECTOR A

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A801A1 FINISH PLAN

1 ADDENDUM #1 4/6/2026

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC.SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

TYP. ADA ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

SDNT.ROOM

CPT-2

RB-1

PT-1

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

TYP. SDNT ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CORRIDOR 1D

CPT-1

RB-1

PT-1, RR-1

CPT-3 CPT-3

2A810

2A810

FLOOR:

BASE:

WALL:

BREAK ROOM

LVT-1

RB-1

PT-1

1 1

1 1 1 1 1

CPT-1 (1A,1B,&1C COMBINED)

CPT-2

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A801B

1ST FLOOR FINISH PLAN - SECTOR B

AM

BJ

SCALE: 1/8" = 1'-0"2A801B1 FINISH PLAN

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

VEND.

FLOOR:

BASE:

WALL:

LOUNGE

LVT-1

EXISTING

EXISTING

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

COURT

ROOM/CLASSROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

CLASSROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

CLASSROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

CLASSROOM

FLOOR:

BASE:

WALL:

VEST.

CPT-3

RB-1

PT-1, RR-1

FLOOR:

BASE:

WALL:

VEST.

CPT-3

RB-1

PT-1

FLOOR:

BASE:

WALL:

LVT-1

RB-1

PT-1, RR-1

CORRIDOR

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

CPT-1

2A805

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A802A

2ND FLOOR FINISH PLAN - SECTOR A

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A802A1 FINISH PLAN

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC. SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC. SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

1 1

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A802B

2ND FLOOR FINISH PLAN - SECTOR B

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A802B1 FINISH PLAN

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

CLASSROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

CLASSROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

EXISTING

BREATH TEST

CLASSROOM

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

COPY/FAX

VEND.

FLOOR:

BASE:

WALL:

LVT-1

RB-1

PT-1, RR-1

LOUNGE

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

LVT-1

CPT-1

1 1

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A803A

3RD FLOOR FINISH PLAN - SECTOR A

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A803A1 FINISH PLAN 1 ADDENDUM #1 4/6/2026

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC. SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC. SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A803B

3RD FLOOR FINISH PLAN - SECTOR B

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A803B1 FINISH PLAN

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

LVT-1

RB-1

PT-1, RR-1

LOUNGE

FLOOR:

BASE:

WALL:

LVT-1

RB-1

PT-1, RR-1

CONFERENCE

FLOOR:

BASE:

WALL:

COPY/FAX

CPT-2

RB-1

PT-1, RR-1

FLOOR:

BASE:

WALL:

COPY/FAX

CPT-2

RB-1

PT-1, RR-1

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

LVT-1

CPT-1

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:3

AM

2A804A

4TH FLOOR FINISH PLAN - SECTOR A

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A804A1 FINISH PLAN

GRAPHIC FINISH LEGEND

CPT-3

LVT-1

OUT OF SCOPE.

EXISTING TO

REMAIN.

NEW PAINT, PT-1

NEW RUB RAIL, RR-1

NEW CORNER GUARD, CG-1

TEMPORARILY REMOVE AND

RE-INSTALL RADIANT FLOOR

PANELS AS NECESSARY TO

FACILIATE FLOOR DEMO AND

NEW FLOORING INSTALL.

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

HC.SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-2

RB-1

PT-1

SDNT.ROOM

FLOOR:

BASE:

WALL:

CPT-1

RB-1

PT-1, RR-1

CORRIDOR

C

COMMONWEALTH

T

RE

R

A

HC

I

N

KE UT

OF

B

3 87

I

REG

No.

TS E

NT U

CE

YK T

NER

DER

RB

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

CJT - THOMPSON HALL

SCHWENDEMAN INTERIOR REFURBISHMENT

FEBRUARY 2026

525CAVKCJ3700

{RECORD DWG. DATE}

RTA

2024/04/25

4/ 7/

0:

:4

AM

2A804B

4TH FLOOR FINISH PLAN - SECTOR B

AM

BJ

FINISH LEGEND

NAME MANUFACTURER PRODUCT COLLECTION COLOR / PATTERN COLOR NUMBER SIZE INSTALLATION COMMENTS CPT-1A SHAWCONTRACT CARPET TILE CHROMATONE TILE CHARCOAL BLACK 07505 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1B SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-1C SHAWCONTRACT CARPET TILE COLOR AT WORK II BLUE 07486 9" X 36' SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-2 SHAWCONTRACT CARPET TILE CHROMATONE TILE BLUE BLACK 07486 18" X 36" SEE MANUFACTURER INSTALLATION

PLANS

SEE MANUFACTURER INSTALLATION PLANS

CPT-3 SHAWCONTRACT WALK-OFF CARPET TILE SWIFT TILE STEP 14549 24"X 24" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

LVT-1 SHAWCONTRACT LUXURY VINYL TILE EON OBSIDIAN 12595 20"X20" MONOLITHIC SEE MANUFACTURER INSTALLATION PLANS

PT-1 SHERWIN WILLIAMS PAINT N/A SEE SPECS SEE SPECS N/A N/A TO MATCH EXISTING. FIELD VERIFY

RB-1 JOHNSONITE RUBBER WALL BASE 6" X VARIES

CG-1 INPRO CORNER GUARD 1.5" x 8' SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH CORNER GUARDS.

RR-1 INPRO RUB RAIL 2' X VARIES SEE MANUFACTURER INSTALLATION

PLANS

TO MATCH WALLS. FIELD VERIFY

SCALE: 1/8" = 1'-0"2A804B1 FINISH PLAN

Addendum One
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
2353_Addendum 01_
2353_DOCJT_Sch-Thomp_Addendum01 (002)
2A801A - 1ST FLOOR FINISH PLAN - SECTOR A
2A801B - 1ST FLOOR FINISH PLAN - SECTOR B
2A802A - 2ND FLOOR FINISH PLAN - SECTOR A
2A802B - 2ND FLOOR FINISH PLAN - SECTOR B
2A803A - 3RD FLOOR FINISH PLAN - SECTOR A
2A803B - 3RD FLOOR FINISH PLAN - SECTOR B
2A804A - 4TH FLOOR FINISH PLAN - SECTOR A
2A804B - 4TH FLOOR FINISH PLAN - SECTOR B

File details come from the government source that posted it. Updated .