Addendum One.pdf

PDF 2 MB Posted

Attached to
RFB-203-26 EDU KSD Middleton Exterior Repairs
Solicitation number
RFB 785 2600000405 3
Issued by
Boyd County, Kentucky

About this file

This is an Addendum One to an Invitation to Bid (RFB-203-26) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for exterior repairs to Middleton Hall Dormitory at the Kentucky School for the Deaf in Danville, Kentucky. The addendum, dated March 10, 2026, modifies the original bid documents dated January 29, 2026, and introduces changes to specifications and drawings that become binding upon contract issuance. Key modifications include a complete replacement of Specification 072100 (Spray-In-Place Thermal Insulation), additions to the Metal Wall Panel manufacturer list to include Classic Green Color and IMETCO Latitude Metal Wall Panel, and clarifications on structural steel and welding requirements per ASTM A572 and AWS D1.1 standards. The addendum references a site visit conducted on February 24, 2026, at 10 a.m., for which a sign-in sheet is attached.

The thermal insulation specification details require batt insulation with R-21 value and sprayed-in-place polyurethane foam systems at 2 lb. and 1/2 lb. densities for exterior cavity walls and openings. The specification mandates Air Barrier Association of America (ABAA) accreditation and certification for subcontractors and installers, with quality assurance inspections at 50 percent completion and mock-up wall construction requirements. Approved manufacturers for spray-applied systems include NCFI Polyurethanes, BASF, Carlisle, Huntsman, Gaco, Henry Company, JohnsManville, SWD Urethane, and Xcelus Building Systems. A preinstallation meeting is required to coordinate spray foam installation with masonry work, and all defective work must be promptly removed and replaced at no additional cost to the owner.

View the file

Other files

File Type Posted
Final_RFB_785_2600000405_3_SO_FORM.PDF PDF
Final_RFB_785_2600000405_2_SO_FORM.PDF PDF
Addendum Two.pdf PDF
Final_RFB_785_2600000405_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-203-26

FOR: Exterior Repairs Middleton Hall Dormitory Kentucky School for the Deaf Danville, Kentucky

DATE: March 10, 2026

RFB-785-2600000405

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-203-26 For: Exterior Repairs Middleton Hall Dormitory Kentucky School for the Deaf Danville, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

ADDENDUM No. 1 PAGE 1

ADDENDUM NO. 1

TO THE DRAWINGS AND SPECIFICATIONS

FOR THE

KSD Middleton Hall Dormitory Envelope Danville, Kentucky

Account No. 540-CC6C-SD67-00

RTA 23025

March 09, 2026

To All Plan Holders of Record:

This Addendum modifies bid documents dated 01/29/2026 for the above project and shall become part of said documents in the preparation of proposals and execution of work of the subject project.

General:

1. Refer to the attached sign-in sheet from the site visit on 02/24/26 at 10 am.

Specifications:

1. Refer to Specification 072100 – Spray-In-Place Thermal Insulation.

a) Replace Specification 072100 in its entirety with the attached revised specification 072100.

2. Refer to Specification 074213 – Metal Wall Panel

a) Refer to Part 2 Products, 2.01 Manufacturers,

i) B.2.a. Add Classic Green Color

ii) C. Add IMETCO Latitude Metal Wall Panel to the manufacturer list.

Drawings:

1. Clarification on the structural drawings:

a) Where products are not otherwise listed in structural specifications, clarify products as follows:

i) Steel plate: ASTM A572. 50 ksi. Steel to be new, unused and perfect stock, free from millscale, rust, flake, pitting, and imperfections, without bends, kinks, and distortions. Provide holes required for securing other work to structural steel framing, and for attaching connections and embeds to other work. Clean surfaces to be painted. Remove dirt, loose rust, loose mill scale, and spatter, slag, or flux deposits. Wipe steel surfaces with solvent to remove rolling oils that impair primer bond.

Prepare surfaces according to SSPC specifications per SSPC-SP 2 “Hand Tool Cleaning.” Shop prime with fabricator’s standard lead- and chromate-free, non-asphaltic, rust-inhibiting primer.

ii) Welding: Qualify procedures and personnel in accordance with applicable provisions of AWS D1.1 “Structural Welding Code – Steel” and AISC 360. All field welding shall be performed by personnel qualified by AWS procedure and who have engaged in the necessary processes of welding during each six-month period since the latest qualification. Comply with AWS D1.1 for procedures, appearance and quality of welds, and methods used in correcting welding work. Remove all cracks, pores, slag inclusions, incomplete fusions, and incomplete penetrations over ½” long in any weld and reweld.

RTA 23025

Account No. 540-CALK-SD19-00

THERMAL INSULATION 072100 - 1

SECTION 072100 - THERMAL INSULATION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Batt insulation in exterior wall construction.

B. Sprayed-in-place thermal insulation (2 lb.) air barrier system at all exterior cavity wall construction.

C. Sprayed-in-place thermal insulation (1/2 lb.) at all exterior cavity wall openings with metal stud box/beam constructed headers, jambs, and sills.

1.02 RELATED REQUIREMENTS

A. Section 042000 - Unit Masonry: Supporting construction for insulation..

B. Section 054100 - Cold-Formed Exterior Steel Stud Framing: Supporting construction for sprayed-in-place and batt insulation.

C. Section 061000 - Rough Carpentry: Supporting construction for batt insulation.

D. Section 075200 - Modified Bituminous Membrane Roofing: Installation requirements for board insulation over low slope roof deck.

E. Section 075400 - Thermoplastic Membrane Roofing: Installation requirements for board insulation over low slope roof deck.

F. Section 092116 - Gypsum Board Assemblies: Acoustic insulation inside walls and partitions.

1.03 REFERENCE STANDARDS

A. ASTM C665 - Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame

Construction and Manufactured Housing; 2012.

B. ASTM E136 - Standard Test Method for Behavior of Materials in a Vertical Tube Furnace At 750

Degrees C; 2012.

C. ASTM E2357 - Standard Test Method for Determining Air Leakage of Air Barrier Assemblies.

1.04 SUBMITTALS

A. Product Data: Provide data on product characteristics, performance criteria, and product limitations.

B. Sprayed-in-Place Thermal Insulation:

1. Provide data on product characteristics, product testing, product performance criteria, and product limitations.

a. Provide specific data that product is approved for direct application on cmu substrate as part of cmu/masonry veneer cavity wall and/or exterior sheathing as part of the metal stud/sheathing/masonry veneer cavity wall construction.

b. Provide product data on all auxiliary components; primer, seam tape and transition strip materials.

c. Provide specific data that product has been tested and is approved for use as an air barrier.

d. Provide hydrostatic water resistance pressure test results.

e. Shop Drawings: Indicate locations and extent of sprayed-in-place thermal insulation air barrier system assemblies and details of all typical conditions, intersections with other envelope assemblies and materials, membrane counter-flashings, and details showing how gaps in construction will be bridged, how inside and outside corners are negotiated, how materials that cover the insulation are secured, how air-tight conditions are maintained, and how miscellaneous penetrations such as conduits, pipes, electric boxes and similar items are sealed.

THERMAL INSULATION 072100 - 2

2. Quality Assurance Program: Provide evidence of current accreditation of the subcontractor and certification of installers under the Air Barrier Association of America's (ABAA)

Quality Assurance Program. Provide accreditation and certification information on the form included in the Form of Proposal.

C. Manufacturer certificate, located at the end of this section, to be submitted within 24 hours of the bid, for the proposed sprayed-in-place thermal insulation system confirming that the sprayed-in-place thermal insulation system installer is approved to install the proposed sprayed-in-place thermal insulation system.

1.05 FIELD CONDITIONS

A. Do not install insulation adhesives when temperature or weather conditions are detrimental to successful installation.

1.06 QUALITY ASSURANCE

A. Source Limitations: Obtain each type of building insulation through one source.

B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.

1. Surface - Burning Characteristics: ASTM E 84.

2. Fire - Resistance Ratings: ASTM E 119.

3. Combustion Characteristics: ASTM E 136.

C. Sprayed-In-Place Thermal Insulation: Current accreditation of the subcontractor and certification of installers in accordance with the Air Barrier Association of America's (ABAA) Quality Assurance

Program.

1. Install in accordance with ABAA and training requirements outlined in ULC S705.2-05

Installation Standard.

D. Sprayed-In-Place Thermal Insulation Field Quality Control:

1. ABAA Site Inspections: ABAA to verify conformance with the manufacturers instructions, the ULC S705.2 Installation Standard, the ABAA Quality Assurance Program and requirements of this specification.

a. Inspections and testing shall be carried out at 50 percent of sprayed-in-place thermal insulation completion. Forward written inspection reports to the Architect within 10 working days of the inspection and test being performed.

b. If the tests reveal any defects, promptly remove and replace defective work at no additional expense to the Owner.

1) If the preliminary or final written inspection report indicates the system will not or has not passed then an additional ABAA inspection shall be conducted to ensure defects and deficiencies have been corrected and a passing ABAA report can be obtained.

1.07 PRE-INSTALLATION MEETING

A. Preinstallation Meeting: Per Section 042000 - Unit Masonry the general contractor/construction manager will conduct a preinstallation conference prior to the masonry installation occuring. The sprayed-in-place thermal insulation installer is to attend this preinstallation conference too coordinate the installation of the sprayed-in-place insulation with the masonry subcontractor.

1. Review foreseeable methods and procedures related to sprayed-in-place thermal insulation installation, including but not necessarily limited to the following:

a. Protection of through wall flashing.

b. Spray around horizontal reinforcing eyes.

c. Hot and cold weather protection.

THERMAL INSULATION 072100 - 3

d. Protection of work in process and installed.

e. Sequencing of work with masonry installation.

f. Review percentages of completion when ABAA testing will be conducted.

g. Has the project been registered with the ABAA for testing?

1) If registered has the ABAA testing agent been notified?

1.08 MOCK-UP

A. Sprayed-in-place thermal insulation to be included in the mock-up wall construction.

PART 2 PRODUCTS

2.01 BATT INSULATION MATERIALS

A. Glass Fiber Batt Insulation: Flexible preformed batt or blanket, complying with ASTM C665;

friction fit.

1. Surface Burning Characteristics: Flame spread index of 25 or less; smoke developed index of 450 or less, when tested in accordance with ASTM E 84.

2. Combustibility: Non-combustible, when tested in accordance with ASTM E136, except for facing, if any.

3. Formaldehyde Content: Zero.

4. Thermal Resistance: R-value of 21.

5. Thickness: 5-1/2 inch.

6. Facing: Unfaced.

7. Recycled Content: Give preference to products having recycled content.

8. Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include;

a. Johns Manville: www.jm.com.

b. Knauf Insulation GmbH: www.knaufinsulation.us.

c. Owens Corning Corp: www.owenscorning.com.

2.02 SPRAYED-IN-PLACE THERMAL INSULATION

A. Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include, but are not limited to the following:

1. Basis of Design: Design concept and the drawings indicate the size, profiles, dimensional requirements and aesthetics of the following:

a. NCFI Polyurethanes, Division of BMC: InsulBloc 2 lb. Spray Foam System 11-017.

b. NCFI Polyurethanes, Division of BMC: InsulStar Light 1/2 lb. Spray Foam System.

2. Products by other manufacturers (listed below) may be considered, provided deviations in dimensions, profiles, and formulations are minor and do not change the design concept as judged by the Architect.

a. NCFI Polyurethanes, Division of BMC: InsulBloc 2 lb. Spray Foam System 11-017:

www.ncfi.com

b. BASF Polyurethane Foam Enterprises, LLC: Walltite 2 lb.Air Barrier System:

www.basf-pfe.com

c. Carlisle Spray Foam Insulation: SealTite Pro Closed Cell: www.carlislefi.com

d. Huntsman Building Solutions/ formerly Demilec USA, LLC: Heatlok Soya HFO:

www.demilecusa.com

e. Gaco (Holcim): Gaco WallFoam 183M 2 lb.: www.gaco.com

f. Henry Company: Permax 2.0: www.henry.com

g. Huntsman Building Solutions/ formerly Icynene-Lapolla Inc.: ProSeal LE 2 lb.

Spray Foam Insulation: www.icynene.com

h. JohnsManville Insulation Systems: JM Corbond III 2 lb.: www.jm.com

i. SWD Urethane: Quik-Shield 112-XC: www.swdurethane.com

j. Xcelus Building Systems, Inc.: Xcelus XLS 2000: www.xcelusbuildingsystems.com

THERMAL INSULATION 072100 - 4

3. Products by other manufacturers (listed below) may be considered, provided deviations in dimensions, profiles, and formulations are minor and do not change the design concept as judged by the Architect.

a. NCFI Polyurethanes, Division of BMC: InsulStarLight 1/2 lb. Spray Foam System

11-017: www.ncfi.com

b. BASF Polyurethane Foam Enterprises, LLC: Enertite 1/2 lb.Air Barrier System:

www.basf-pfe.com

c. Huntsman Building Solutions/ formerly Demilec APX 1.2: www.demilecusa.com

d. Gaco (Holcim): Gaco WallFoam Open Cell Foam 052N 1/2 lb.:

www.gacowallfoam.com

e. Huntsman Building Solutions/ formerly Icynene-Lapolla Inc.: LD-R-50 1/2 lb.

Spray Foam Insulation: www.icynene.com

f. JohnsManville Insulation Systems: JM ocSPF 1/2 lb.: www.jm.com

B. Spray applied closed cell, 2 lb. polyurethane foam insulation, air seal and water repellent treatment for

CMU cavity wall and cold formed metal stud framed walls throughout the project.

1. Physical material properties shall be:

2. Core Density 1.9-2.2 lb/ft per ASTM D-1622

3. Water Vapor Transmission <1.0 @ 2" thick /perms per ASTM E-96

4. R-Value 6.7 minimum at 1inch thick per ASTM C-518

5. R-Value Aged: 6.4 minimum at 1 inch thick per ASTM C-1029

6. Compressive Strength 25 (min) psi per ASTM D-1621

7. Flame Spread <25 per ASTM E-84

8. Smoke Developed <450 per ASTM E-84

9. Air Leakage - Infiltration: 0.00 @ 1.57 psf/cfm/ft2 per ASTM E-283

10. Air Leakage - Exfiltration: 0.00 @ 1.57 psf/cfm/ft2 per ASTM E-283

11. Air Barrier System Test: ASTM E 2357 and NFPA 285

12. Tensile Bond Strength >45 for masonry psi per ASTM D-1623

13. Hydrostatic Water Pressure Resistance Test: No failure at 56.5 feet head pressure per

AATCC 127-1998.

C. Spray applied open cell, 1/2 lb. polyurethane foam insulation, air seal and water repellent treatment for boxed/beam headers, jambs, and sills at openings in exterior metal stud framed walls throughout the project.

1. Physical material properties shall be:

2. Core Density 0.5 lb/ft per ASTM D-1622

3. Water Vapor Transmission 15 /perms at 1 inch per ASTM E-96

4. R-Value 4.1 minimum at 1 inch thick per ASTM C-518

5. Flame Spread <25 per ASTM E-84

6. Smoke Developed <450 per ASTM E-84

7. Air Leakage - Infiltration: 0.00 @ 1.57 psf/cfm/ft2 per ASTM E-283

8. Air Leakage - Exfiltration: 0.00 @ 1.57 psf/cfm/ft2 per ASTM E-283

9. Air Barrier System Test: ASTM E 2357 and NFPA 285

D. Refer to the wall types on the A0.1 drawing sheet for thickness of spray polyurethane material required.

E. Apply spray polyurethane foam directly to the masonry block or exterior sheathing in accordance with the manufacturers installation instructions. All surfaces to be sprayed with foam must be free of moisture and ice.

F. Do not apply spray polyurethane foam during inclement weather or when ambient temperatures and humidity are outside the ranges prescribed by the manufacturer.

1. Optimum Adhesion: Sprayed-In-Place Thermal Insulation Installer to determine appropriate grade of adhesive material to be used on project based on; project type, substrate type, time of year of installation, average daily temperatures forecasted during installation, and other factors, as determined by the sprayed-in-place thermal insulation manufacturer to maintain

THERMAL INSULATION 072100 - 5

the specified requirements. No additional compensation will be considered, or due, the sprayed-in-place thermal insulation contractor if the sprayed-in-place thermal insulation manufacturer requires a tack coat, or the type or grade of adhesive, originally bid, to be changed due to project type, environmental and/or temperature factors, to maintain the specified requirements and construction schedule.

G. Materials:

1. Transition Strip and Seam Tape Primer:

a. Primer to facilitate adhesion of flashings to fiberglass faced sheathing, concrete and masonry substrates.

1) Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include, but are not limited to the following:

(a) Grace Construction Products: Perm-A-Barrier WB Primer

(b) W. R. Meadows, Inc.: Mel-Prime

(c) Product approved for use by sprayed-in-place thermal insulation manufacturer.

2. Seam Tape:

a. Self-adhered flashing with cross-laminated, high density polyethylene sheet backed with pressure-sensitive rubberized asphalt adhesive.

1) Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include, but are not limited to the following:

(a) Grace Construction Products: Vycor Plus

(b) W. R. Meadows, Inc.: Air-Shield 25 mil Flashing Tape

(c) Product approved for use by sprayed-in-place thermal insulation manufacturer.

3. Transition Strip Materials:

a. Contractor option to use self-adhered sheet product or fluid applied product for the transition strip materials.

b. Self-adhered Transition Strip Material: Minimum 1 mm self-adhered flashing sheet with cross-laminated, high density polyethylene sheet backed with pressure-sensitive rubberized asphalt adhesive. Install transition strip materials at all wall openings, transitions in substrate and connections to adjacent elements:

1) Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include, but are not limited to the following:

(a) Carlisle Coatings and Waterproofing: CCW-705 TWF

(b) Grace Construction Products: Perm-A-Barrier Flashing

(c) Henry: Blueskin SA

(d) Protective Coatings Technology, Inc.: Poly-Wall Crack Guard

(e) Tremco, Inc.; ExoAir 110

(f) W. R. Meadows, Inc.: Air Shield

c. Fluid-applied Transition Strip Material System: One component rubberized air barrier material. Suitable for spray, roller or brush application direct to substrate.

Install by roller/brush in two minimum 13 mil wet thickness applications, or one 26 mil wet thickness application by spray. Provide all additional auxiliary materials necessary to complete the entire system: Reinforced, nonwoven, polyester sheathing joint fabric with preformed corners, polyester-faced 30-mil thick, self-sealing, rubberized asphalt membrane, and water-based primer.

1) Manufacturers: Subject to compliance with requirements, manufacturers offering the following products that may be incorporated into the work include, but are not limited to the following:

(a) BASF: Enershield-1, Quick Corner 6, TF Membrane, WS

Flashing Primer: www.enershield.basf.com

THERMAL INSULATION 072100 - 6

(b) Prosoco - R-Guard Fast Flash

(c) W. R. Meadows, Inc.: Air Shield LM

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that substrate, adjacent materials, and insulation materials are dry and that substrates are ready to receive insulation.

B. Verify substrate surfaces are flat, free of honeycomb, fins, irregularities, or materials or substances that may impede adhesive bond.

3.02 BATT INSTALLATION

A. Install insulation in accordance with manufacturer's instructions.

B. Install in exterior wall spaces without gaps or voids. Do not compress insulation.

C. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.

D. Fit insulation tightly in cavities and tightly to exterior side of mechanical and electrical services within the plane of the insulation.

3.03 SPRAYED-IN-PLACE THERMAL INSULATION AIR BARRIER SYSTEM

A. Equipment used to spray insulation shall comply with ABAA ULC S705.2 and the manufacturer's recommendations.

B. Record equipment settings daily as required by the ABAA ULC S705.2 installation standard.

C. Apply in consecutive passes as recommended by manufacturer and thickness indicated on drawings.

Passes shall not be less than 1/2 inch and not greater than 2 inches.

D. Install within manufacturer's tolerances, but not more than minus 1/4 inch or plus 1/2 inch.

1. The total average thickness, tested and provided on the final ABAA Audit Report, for the sprayed insulation installed on the wall in the field shall be the minimum thickness indicated, for the various wall types, as shown on the drawings.

E. Surface of foam insulation to be free of voids and embedded foreign objects.

F. Remove masking materials and overspray from adjacent areas immediately after foam surface has hardened. Ensure cleaning methods do not damage work performed by other sections.

G. Trim as required, any excess thickness that would interfere with the application of cladding/covering system by other trades.

H. Complete connections to other components and repair any gaps, holes or other damage using material which conforms to ABAA ULC S710.1 or ABAA ULC S711.1 and installed in accordance with

ABAA ULC S710.2 or ABAA ULC S711.2 as applicable.

I. Fill exterior metal stud boxed/beam headers, jambs, and sills at all openings completely with 0.5 lb.

spray insulation.

J. Transition Strip and/or Fluid-Applied Material Installation: Install transition strip/fluid-applied materials to provide continuity throughout the building envelope. Install materials in accordance with manufacturer's recommendations and the following:

1. Priming, seam tape/fluid-applied material, and transition strips are required by RossTarrant whether or not they are required by a manufacturer to meet the ABAA air leakage requirements of ASTM E2357.

2. Apply primer for seam tape and transition strips. Allow primer to dry completely before transition strip application. Apply as many coats as necessary for proper adhesion.

THERMAL INSULATION 072100 - 7

3. Position subsequent sheets of transition strips applied above so that membrane overlaps the membrane sheet below by a minimum of 2 inches, unless greater overlap is required by manufacturer. Roll into place with roller.

4. Overlap horizontally adjacent pieces of transition strips a minimum of 2 inches, unless greater overlap is required. Roll seams with roller.

5. Seal around all penetrations with a transition strip or other procedure.

6. At changes in substrate plane, provide transition material to make a smooth transition from one place to another.

7. Provide mechanically fastened non-corrosive metal sheet to span gaps in substrate plane and to make a smooth transition from one plane to another. Membrane shall be continuously supported by substrate.

8. At through-wall flashings, provide an additional 6 inch wide strip of membrane counterflashing to seal top of through-wall flashing to membrane. Seal exposed top edge of strip with bead of mastic.

9. At deflection and control joints, provide backup for the membrane to accommodate anticipated movement.

10. At expansion and seismic joints provide transition to the joint assemblies.

11. At the top of parapet walls, provide transition material over top of parapet to transition with roof membrane.

12. Do not allow materials to come into contact with chemically incompatible materials.

13. Do not expose transition membrane to sunlight longer than recommended by manufacturer.

14. Inspect installation prior to enclosing assembly and repair damaged areas with sprayed-in-place thermal insulation air barrier system.

3.04 PROTECTION

A. Do not permit installed insulation to be damaged prior to its concealment.

END OF SECTION 072100

SPRAYED-IN-PLACE THERMAL INSULATION (072100)

INSTALLER'S CERTIFICATION

072100.01 - 1

SECTION 072100.01 - SPRAYED-IN-PLACE THERMAL INSULATION (072100) INSTALLER'S

CERTIFICATION

SPRAYED-IN-PLACE THERMAL INSULATION (072100) INSTALLER'S CERTIFICATION

This certification must be completed and submitted as outlined in the Supplemental Instructions to Bidders. Failure to submit this completed certification may be cause for rejection of the bidder's proposal. Upon submittal of this form RossTarrant will verify from the ABAA website (www.airbarrier.org) the listed installers current and valid certification, at the time of bid, with the ABAA. Installers listed without current and valid ABAA certification will be rejected.

This certification must be completed and submitted within 24 hours after bids are received.

Date Submitted:________________________

Name & Address of Sprayed-In-Place Thermal Insulation Installer:

I certify that _____________________________ (Name of Sprayed-In-Place Thermal Insulation Installer) has achieved ABAA Accreditation for sprayed-in-place thermal insulation installation, and is a member with current and valid ABAA Certification.

ABAA Accreditation Number___________________________________________

I certify that _____________________________ (Name of Sprayed-In-Place Thermal Insulation Subcontractor) installers have achieved ABAA Certification for sprayed-in-place thermal insulation installation, and is a member with current and valid ABAA Certification.

ABAA Certification Numbers___________________________________________

Signed:_________________________________Title: ___________________

UP

B D F G H L N S W Y Z

KJ M

PEC

TQ R

U V X

A

D4.2 I

D4.2 F

D4.2 E D4.2

G

D4.2 N

D4.2 O

D4.2 P

D4.2 S

D4.2 T

D4.2 H

D4.2 K

D4.2 L

D4.2 U

D4.2 Y

D4.2 X

D4.2 V

D4.2 W

D4.1 A

D4.1 B

D4.1 C

D4.1 D

W-2 W-2W-1 W-1 W-1

W-1

W-1 W-1 W-1

W-1 W-1

W-1

W-2

W-2 W-2 W-2

W-2

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-2

W-1

W-1

W-1

W-1

W-1

W-1

W-1

P-3

M-2

M-8

M-3

M-3

W-1

W-1

D-1

D-1

M-5

A4.2 Q

A4.2 R

A4.2 M

D4.2 M

D4.2 R

M-7

D-1

D-1

M-6

R-2 R-2 R-2

R-2 R-2

R-2 R-2

M-8

M-8

B D F G H L N S W Y Z

KJ

PEC

TQ R

U V X

A

D4.2 I

D4.2 F

D4.2 E D4.2

G

D4.2 H

D4.2 J

D4.1 A

D4.1 B

W-1 W-1 W-1 W-1 W-1 W-1

W-1

W-1 W-1

W-1

W-2

D-1

M-8

LIVING

ROOM

BATH

134A

BED/STUDY

134C

BED/STUDY

134D

BED/STUDY

133E

BED/STUDY

133D

BED/STUDY

132C

BED/STUDY

132D

LIVING

ROOM

VENDING

MECH.

104A

LAUNDRY

OFFICE

105A

MECH.

133B

BATH

133A

TOILET

133C

TOILET

132B

BATH

132A

LIVING

ROOM

LIVING

ROOM

BED/STUDY

135D

BED/STUDY

135C

BED/STUDY

136D

BED/STUDY

136E

LIVING

ROOM

LIVING

ROOM

BED/STUDY

137D

BED/STUDY

137C

BED/STUDY

138D

BED/STUDY

138E

BATH

137A

TOILET

137B

WOMENS

MECH.

138B

ALCOVE

MONITOR

BATH

135A

TOILET

135B TOILET

136C

MECH.

136B

BATH

136A

STAIR

NO. 2

S2

CORRIDOR

117A

LINEN

102A

HOUSEKEEPING

101A

JANITOR

COAT

ROOM

107 CONVERSATION

LOBBY

LIVING

ROOM

TOILET

138C

BATH

138A

COAT

ROOM

MULTI-PURPOSE

ROOM

WAREWASHING

123LAUNDRY

VENDING

CORRIDOR

LIVING

ROOM

MECH.

MEN'S

TOILET

BED/STUDY

127D

BED/STUDY

127C

BED/STUDY

128D

BATH

127A

TOILET

127B

MECH

128B

OFFICE

105B

BED/STUDY

128E

LIVING

ROOM

BATH

128A TOILET

128C

LIVING

ROOM

BED/STUDY

129D

BED/STUDY

129C

CLOSET

129B

BATH

129A

MECH

104B

LINEN

STORAGE

102B

STAIR

NO. 3

S3

LIVING

ROOM

BED/STUDY

131E

BED/STUDY

131D

BED/STUDY

130C

BED/STUDY

130D

MECH

131B

TOILET

131C BATH

131A

LIVING

ROOM

BATH

130A

TOILET

130B

CORRIDOR

117B

HOUSEKEEPING

101B

STAIR

NO. 1

S1

CLOSET

134B

ALCOVE

STORAGE

HOLDING

BED/STUDY

011D

BED/STUDY

011C

BED/STUDY

010D

BED/STUDY

010E

STAIR

NO. 2

S2

LIVING

ROOM

BATH

011A

TOILET

011B

MECH.

010B

BATH

010A

TOILET

010C

LIVING

ROOM

LINEN

STORAGE

LIVING

ROOM

BED/STUDY

009E

LAUNDRY

BED/STUDY

009D

BED/STUDY

008C

BED/STUDY

008D

MECH.

009B

BATH

009A

TOILET

009C

LIVING

ROOM

JANITOR

BATH

008A

TOILET

008B

HOUSEKEEPING

CORRIDOR

RECREATION

ROOM

PASSAGE

STAIR

NO. 1

S1

STORAGE

MECH.

ALCOVE

HOLDING

REMOVE EXISTING WINDOW ASSEMBLY,

INCLUDING SOLID SURFACE SILL, BRICK

VENEER, AND 4" CMU BLOCK BELOW

WINDOW SILL, AS REQUIRED FOR NEW

WORK. REFER TO ARCHITECTURAL DETAILS.

GENERAL DEMOLITION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

THESE DEMOLITION PLANS ARE MEANT TO BE A

CONVENIENCE TO THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION

NECESSARY FOR INSTALLATION OF NEW WORK

WHETHER SHOWN HERE OR NOT.

REFER TO SECTIONS AND DETAILS FOR ADDITIONAL

DEMOLITION WORK REQUIRED IN SPECIFIC AREAS

OF WORK.

CONTRACTOR SHALL VERIFY LOAD BEARING

CONDITIONS OF WALLS PRIOR TO THEIR

DEMOLITION. ANY WALL FOUND TO BE LOAD

BEARING WHICH IS NOT SO NOTED SHALL PROMPTLY

BE BROUGHT TO THE ATTENTION OF THE ARCHITECT

PRIOR TO ITS DEMOLITION.

WHERE WALLS OR OTHER ITEMS ARE REMOVED,

CLEAN AND REPAIR FLOORS TO FLUSH CONDITION

SUITABLE TO RECEIVE FLOOR FINISH. WHERE

MASONRY WALLS EXTEND THROUGH SLAB AND REST

ON FOOTING, REMOVE BLOCK TO MINIMUM OF 4"

BELOW FINISH FLOOR. FILL FLUSH WITH CONCRETE.

PROVIDE MIN. 4" CONCRETE FILL AT ABANDONED

PIPES OR OTHER OPENINGS IN THE FLOOR SLABS

WHICH ARE EXPOSED OR CREATED BY OTHER

DEMOLITION. GRIND TO FLUSH AS RQD.

ALL CONCRETE BLOCK, AND/OR BRICK VENEER

INFILL OR PATCHES IN EXISTING MASONRY SHALL BE

TOOTHED INTO ADJACENT SOUND MASONRY IN

FULL UNITS U.N.O. PARTIAL MASONRY UNITS

ADJACENT TO OPENINGS SHALL BE REMOVED AS

RQD. TO ALLOW TOOTHING. WHERE NEW MASONRY

CONSTRUCTION JOINS EXISTING MASONRY WALLS,

REMOVE MASONRY UNITS AT CONNECTIONS AS

NECESSARY TO PERMIT TOOTHING OF NEW

CONSTRUCTION WHETHER OR NOT SUCH

DEMOLITION IS SPECIFICALLY SHOWN ON

DEMOLITION PLANS. OVER-DEMOLISH EXISTING

MASONRY UNITS TO PROVIDE FINISHED OPENING.

PROVIDE NEW MASONRY TIES AND HORIZONTAL

JOINT REINFORCING PER SPECIFICATIONS. NEW

MASONRY CONSTRUCTION SHALL PRECISELY

MATCH ADJACENT EXISTING MASONRY IN COLOR,

TEXTURE, PATTERN AND FINISH, U.N.O.

ALL HVAC GRILLES, LOUVERS, AND OTHER

MECHANICAL, ELECTRICAL, AND PLUMBING

EQUIPMENT WHICH ARE ABANDONED AND/OR

CALLED OUT TO BE REMOVED SHALL BE

COMPLETELY REMOVED. OPENINGS SHALL BE

INFILLED WITH NEW CONSTRUCTION MATCHING

EXISTING ADJACENT CONSTRUCTION. REFER TO

NOTE '1' ABOVE AND MEP DRAWINGS OF RELATED

ITEMS.

EXISTING DOORS AND FRAMES SHOWN IN WALL TO

BE DEMOLISHED SHALL BE REMOVED. PATCH AS

NOTED. REMOVE ALL OTHER MATERIALS

ASSOCIATED WITH DOOR THAT WILL NOT BE USED.

REMOVE ALL WALL MOUNTED ITEMS WHICH ARE

NOT SPECIFICALLY INDICATED TO BE REMOVED BUT

WHICH INTERFERE WITH, OR ARE NOT PART OF

FINISHED CONSTRUCTION. OTHER SALVAGED ITEMS

WHICH ARE NOT INDICATED TO BE REUSED IN THE

RENOVATION OR RETURNED TO THE OWNER MAY BE

SALVAGED BY THE CONTRACTOR AND REMOVED

FROM THE SITE.

SEE NEW WORK PLANS FOR NEW WORK TO BE

INSTALLED.

1/8" = 1'-0" D1.1

BGROUND FLOOR DEMOLITION PLAN

E G I S

DEE R

No.

T

R

COMMONWEALTH

E

K OF Y

KCUTN

CR

A

H I T E C

T

SA

RAH J. LAMERE

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SERVICES SUPPORT

DIVISION OF ENGINEERING AND CONTRACT

ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

DECA LOG #

DECA REVIEWED

FOR INTENT ONLY

DRAWING NO.

COMMONWEALTH OF KENTUCKY

101 old lafayette avenue lexington, kentucky 40502 p 859.254.4018 Copyright 2026

PHASE

DESCRIPTION OF REVISIONS

DATE1

RTA

REVISION HISTORY OF THIS DRAWING

DESCRIPTION OF REVISIONS

DATE

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

RTA DATE

DRAWING INFORMATION

D1.1

MIDDLETON HALL EXTERIOR REPAIRS

GROUND & FIRST FLOOR DEMOLITION PLANS

KENTUCKY SCHOOL FOR THE DEAF

Addendum #1 03/09/26

540-CC6C-SD67-00

540-CC6C-SD67-00

SJL, FB

HRR

01/29/2026

23025

01/14/2026

DEMOLITION NOTES

DOOR DEMOLITION NOTES:

D-1 REMOVE EXISTING DOORS, METAL FRAME AND

HARDWARE IN ITS ENTIRETY. REFER TO PLANS FOR NEW

WORK.

MISCELLANEOUS DEMOLITION:

M-1 REMOVE EXISTING BRICK VENEER, RIGID INSULATION,

AND ALL MASONRY ANCHORS IN THEIR ENTIRETY.

PREPARE EXISTING CMU SURFACE TO BE CLEAN AND

READY TO RECEIVE NEW SPRAY FOAM. EXISTING FASCIA

TO REMAIN IN PLACE.

M-2 EXISITING HANDRAIL TO REMAIN. REFER TO NEW WORK

FOR MORE INFORMATION.

M-3 EXISTING METAL PANEL SOFFIT TO REMAIN.

M-4 REMOVE EXISTING METAL PANEL AND ASSOCIATED

FRAMING IN ITS ENTIRETY.

M-5 EXISTING GUARDRAIL AND RAMP TO REAMIN.

M-6 EXISTING BRICK VENEER TO REAMIN. REFER TO NEW

WORK FOR MORE INFORMATION.

M-7 REMOVE EXISTING GUARDRAIL ITS ENTIRETY.

M-8 DEMOLISH EXISTING METAL CEILING SYSTEM, INCLUDING

PANELS AND SUPPORT FRAMING. COORDINATE WITH

NEW WORK AND ADJACENT FINISHES.

PARTITION DEMOLITION NOTES:

P-1 REMOVE PORTION OF EXISITING CMU WALL AS

REQUIRED TO ACCOMODATE NEW WINDOW OPENING.

COORDINATE WITH NEW WINDOW SIZE.

P-2 REMOVE A PORTION OF THE EXISTING CMU WALL

BETWEEN STEEL BEAMS, AS INDICATED IN THE

DRAWINGS. COORDINATE WITH NEW WORK. THIS MAY

BE A BEARING WALL; PROVIDE SHORING AND BRACING

AS REQUIRED PRIOR TO DEMOLITION.

P-3 REMOVE EXISTING MASONRY WALL IN ITS ENTIRETY.

ROOF DEMOLITION CATEGORY:

R-1 REMOVE EXISITING GUTTER AND EDGE TRIM IN ENTIRETY.

R-2 REMOVE EXISITING DOWNSPOUT IN ENTIRETY.

R-3 REMOVE PORTION OF EXISTING COPING AND

ASSOCIATED WOOD BLOCKING AS REQUIRED FOR NEW

WORK. REFER TO NEW WORK FOR ADDITIONAL

INFORMATION.

R-4 REMOVE EXISTING RAKE BOARD AND/OR METAL EDGE

TRIM IN ITS ENTIRETY.

R-5 REMOVE PORTION OF THE EXISTING PVC ROOF ASSEMBL

AS REQUIRED FOR INSTALLATION OF NEW EXTERIOR

FRAMING. COORDINATE NEW WORK WITH

ARCHITECTURAL DETAILS AND STRUCTURAL DRAWINGS.

R-6 REMOVE A PORTION OF THE EXISTING SBS ROOF

ASSEMBLY DOWN TO THE DECK AS REQUIRED FOR

INSTALLATION OF KICKERS. COORDINATE WITH

ARCHITECTURAL DETAILS AND STRUCTURAL DRAWINGS.

R-7 REMOVE EXISTING PVC ROOF MEMBRANE AS REQUIRED

TO FACILITATE REMOVAL OF EXISTING GUTTER AND

RAKE.

WINDOW DEMOLITION NOTES:

W-1 REMOVE EXISTING WINDOW/STOREFRONT AND DOOR,

INCLUDING FRAMES, GLAZING, HARDWARE, AND TRIM,

IN ITS ENTIRETY. PREPARE OPENING FOR INSTALLATION

OF NEW WINDOW/STOREFRONT SYSTEM AS SHOWN.

W-2 REMOVE EXISITING WINDOW IN ENTIRETY. MODIFY

OPENING AS REQUIRED FOR INSTALLATION OF NEW

WINDOW. COORDINATE WITH NEW WINDOW SIZE.

1/8" = 1'-0" D1.1

AFIRST FLOOR DEMOLITION PLAN

KEY PLAN

SCALE: NTS

N

A4.1 D

A4.1 C

B

G

A4.2 K

WY

A4.2 F

V

N

P

T

O

U

A4.2 L

I

A4.2 J

A4.2 E

A4.1

A4.1 A

A4.2 A4.2

A4.1 H

A4.2

A4.2

A4.2

A4.2

A4.2

A4.2 A4.2

S A4.2

X A4.2A4.2

A4.2 Q

R A4.2

M A4.2

1 1/2" = 1'-0" D1.1

CWINDOW SILL DEMOLITION DETAIL

REVISIONS

# DATE DESCRIPTION

1 03/09/26 ADDENDUM#1

UP

W D

UPUP

W D W/D W/D W/D

D W

DW DW

D W

UP

B D F G H L N S W Y Z

KJ M

PEC

TQ R

U V X

A4.1 B

RESTROOM

LINEN

STORAGE

HOUSEKEEPING

OFFICE

LAUNDRY

TOILET

105C

TOILET

102C

BATH

102D

BATH

105D

JANITOR

CLOSET

MECH.

BATH

108C

BED/STUDY

108A

BED/STUDY

108B

BATH

110D

TOILET

110C

TOILET

109C

BATH

109D

MECH.

110D-1

STAIR

SC

STAIR

SB

BED/STUDY

128A

BED/STUDY

128B

BATH

128C

MECH.

LINEN

STORAGE

OFFICE

BATH

129D

MECH.

130C-1

BATH

130C

TOILET

129C

HOUSEKEEPING

RESTROOM

MECH.

124A

BATH

121D

BATH

125D

TOILET

125C

TOILET

121C

BED/STUDY

121A

BED/STUDY

121B

MECH.

MULTI-PURPOSE

ROOM

CUST./STORAGE

118A

COMMUNITY

KITCHEN

BATHROOM

113C

MECH.

CORRIDOR

CD1-A

CORRIDOR

CD1-B LIVING

ROOM

MECH.

105D-1

BREAK

ROOM

116A

SENSORY

116B

BED/STUDY

113B

BED/STUDY

110B

BED/STUDY

109B

BED/STUDY

109A

LIVING

ROOM

BED/STUDY

113A

BED/STUDY

110A

LIVING

ROOM

LIVING

ROOM

LIVING

ROOM

BED/STUDY

105B

BED/STUDY

105A

BED/STUDY

102B

BED/STUDY

102A

LIVING

ROOM

LIVING

ROOM

LIVING

ROOM

BED/STUDY

130A

BED/STUDY

130B

BED/STUDY

129B

BED/STUDY

129A

LIVING

ROOM

LIVING

ROOM

BED/STUDY

125A

BED/STUDY

125B

LIVING

ROOM

COMMON

SPACE

CONVERSATION

117A

COAT

ROOM

COMMONS

VENDING

LOBBY

LA

ALCOVE

VESTIBULE

VA

CORRIDOR

CD1-C

STAIR

SA

A

ELEVATOR

EL

A4.1 D

B A5.1

AC

AABA

B

AAAB

B B

A

A

A

B

J

A

A

E

L

B

A4.1 C

G

B

A4.2 I

A4.2 F

A4.2 E

A4.2 G

A4.2 N

A4.2 O

A4.2 P

A4.2 S

A4.2 T

A4.2 H

A4.2 K

A4.2 L

A4.2 U

A4.2 Y

A4.2 X

A4.2 V

A4.2 W

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A1

WALL

TYPE

A1

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

B

A

A

A

A

A

A

K

B

F.

V

4'

3/ 4"

F.V

G

F

F

H

9.

A4.1 A

A A5.1

WALL

TYPE

D

099000.A

A1.1 C

A1.1 C

SIM.1

A1.1 C

SIM.

A1.1 C

SIM.

F.V.

4' - 3 1/2"

A1.2 D

A1.2 D

V A

.2

V A

.1

V A

.4

V A

.3

P

Q

A4.2 Q

A4.2 R

A4.2 M

1 1

6' - 0 5/8"

F.V.

1' - 8"

F.V.

5' - 4"

F.V.

4' - 5 7/8"

L LWALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

WALL

TYPE

B

F.V.

11 3/8"

A1.2 D

SIM

42' - 5 5/8" 13' - 2 5/8" 42' - 5 3/8" 13' - 4 3/8" 25' - 5 3/4" 50' - 2 7/8"

/8

/4

/8

/8

/4

9'

GENERAL PLAN NOTES

1.

2.

3.

4.

5.

6.

7.

8.

DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS

TAKE PRECEDENCE.

ALL DIMENSIONS ARE TO FACE OF STUDS, MASONRY

OR TO CENTERLINE OF STRUCT'L STEEL UNLESS

OTHERWISE NOTED. CONTACT ARCHITECT WITH ANY

QUESTIONS REGARDING DIMENSIONS.

MASONRY DIMENSIONS ARE ACTUAL. EXTERIOR

WALL DIMENSIONS ARE TO EXTERIOR FACE OF

VENEER.

ALL EXTERIOR WALLS ARE WALL TYPE 'A' U.N.O.

PROVIDE BULLNOSE UNITS AT ALL VERTICAL OUTSIDE

CONCRETE BLOCK CORNERS U.N.O.

REFER TO STRUCTURAL DRAWINGS FOR TYPES, SIZES,

LOCATIONS, CONNECTIONS, REINFORCEMENT AND

OTHER REQ. PERTAINING TO STRUCTURAL

COMPONENTS INDICATED.

REFER TO STRUCTURAL DRAWINGS FOR LINTEL

SCHEDULE. ALL EXTERIOR LINTELS ARE TO BE

GALVANIZED AND PAINTED.

MASONRY OPENINGS IN CMU WALLS FOR DOORS

ARE TYPICALLY LOCATED 8" FROM THE JAMB

OPENING TO THE ADJACENT WALL U.N.O.

B D F G H L N S W Y Z

KJ M

PEC

TQ R

U V X

A4.1 A

MECH.

010D-1

BATH

011D

BATH

010D

TOILET

010C

TOILET

011C

STORAGE

MECH.

007C-1

BATH

007C

TOILET

004C

BATH

004D

JANITOR

CLOSET

TRUNK

STORAGE

011A

MECHANICAL

ROOM

RECREATION

ROOM

PASSAGE

HOUSEKEEPING

BULK

STORAGE

LINEN

STORAGE

CORRIDOR

CA-001

BED/STUDY

004B

LIVING

ROOM

BED/STUDY

004A

LIVING

ROOM

BED/STUDY

010A

BED/STUDY

010B

BED/STUDY

011B

LIVING

ROOM

LIVING

ROOM

BED/STUDY

007B

ALCOVE

BED/STUDY

011A

STAIR

SC

STAIR

SA

CORRIDOR

CA-002

ELEVATOR

EL

A

BED/STUDY

007A

A4.1 D

B A5.1

A AAAA

AA

AAA

A

A4.2 I

A4.2 F

A4.2 E

A4.2 G

A4.2 H

A4.2 J

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

WALL

TYPE

A

SA

099000.A099000.A

F.

V

4'

3/ 8"

099000.A

WALL

TYPE

B

WALL

TYPE

B

J

A4.1 B

WALL

TYPE

A

074213.C

WALL

TYPE

A1

1/

2"

E G I S

DEE R

No.

T

R

COMMONWEALTH

E

K OF Y

KCUTN

CR

A

H I T E C

T

SA

RAH J. LAMERE

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SERVICES SUPPORT

DIVISION OF ENGINEERING AND CONTRACT

ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

DECA LOG #

DECA REVIEWED

FOR INTENT ONLY

DRAWING NO.

COMMONWEALTH OF KENTUCKY

101 old lafayette avenue lexington, kentucky 40502 p 859.254.4018 Copyright 2026

PHASE

DESCRIPTION OF REVISIONS

DATE1

RTA

REVISION HISTORY OF THIS DRAWING

DESCRIPTION OF REVISIONS

DATE

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

RTA DATE

DRAWING INFORMATION

A1.1

MIDDLETON HALL EXTERIOR REPAIRS

GROUND & FIRST FLOOR PLAN

KENTUCKY SCHOOL FOR THE DEAF

Addendum#1 03/09/26

540-CC6C-SD67-00

540-CALK-SD19-00

SJL, FB

HRR

01/29/2026

23025

01/14/2026

1/8" = 1'-0" A1.1

BGROUND FLOOR PLAN

1/8" = 1'-0" A1.1

AFIRST FLOOR PLAN

MATERIAL REFERENCE

074213.C Metal Wrap & Trim 099000.A Paint

KEY PLAN

SCALE: NTS

N

A4.1 D

A4.1 C

B

G

A4.2 K

WY

A4.2 F

V

N

P

T

O

U

A4.2 L

I

A4.2 J

A4.2 E

A4.1

A4.1 A

A4.2 A4.2

A4.1 H

A4.2

A4.2

A4.2

A4.2

A4.2

A4.2 A4.2

S A4.2

X A4.2A4.2

A4.2 Q

R A4.2

M A4.2

PLAN NOTES

1 INFILL EXISTING CMU WALL OPENING WITH METAL STUD

FRAMING AND GYPSUM BOARD. PAINT TO MATCH

ADJACENT WALL.

2 EXISTING HOLLOW METAL DOOR AND FRAME TO BE

PATCHED, REPAIRED, AND PAINTED. PREPARE SURFACES TO

RECEIVE NEW FINISH.

3 EXISTING STEEL ANGLES, STEP STRIPS, AND GUARDRAIL AT

LOADING DOCK TO BE CLEANED, PREPPED, AND PAINTED.

4 EXISTING EXPOSED MASONRY TO BE CLEANED, PREPPED,

AND PAINTED.

5 REPLACE ALL CRACKED, DAMAGED, OR LOOSE CMU

BELOW AND AROUND WINDOW OPENING TO ACHIEVE A

UNIFORM CMU WALL FINISH.

6 REMOVE EXISTING SOFFIT AS REQUIRED AND PROVIDE NEW

METAL SOFFIT. NEW SOFFIT TO MATCH EXISTING HEIGHT AND

ALIGN WITH ADJACENT CONDITIONS. SEE SECTION

074213.B.

1 1/2" = 1'-0" A1.1

CEXPANSION JOINT DETAIL

REVISIONS

# DATE DESCRIPTION

1 03/09/26 ADDENDUM#1

Addendum One
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Addendum-1 -23025
072100 -Thermal Insulation--ADD
072100_01 Sprayed-In-Place Thermal Insulation _072100_ Installer's Certification-
23025 - Addendum#1 drawings
D1.1 - GROUND & FIRST FLOOR DEMOLITION PLANS
A1.1 - GROUND & FIRST FLOOR PLAN