About this file

This is Addendum No. Two issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration for the Business Office Renovation project at General Butler State Park in Carrollton, Kentucky (RFB-146-25, RFB-785-2500000288) dated December 10, 2024. The addendum provides several clarifications including that all warranties must begin upon project substantial completion rather than installation/shipping dates, the general contractor is responsible for providing dumpsters and portable toilets, and tongue and groove linear solid wood wall planks must be provided by the contractor per architectural drawings and specifications.

The addendum includes technical clarifications regarding MEP drawings, specifically allowing the use of MC (Metal Clad) cables for circuits from panel to all locations with minimum 20 Amp 2#12's with 1#12 ground specifications. Additional clarifications address underground circuits from IT room to main building mechanical room, including requirements for conduit exposure, sidewalk patching, and circuit transitions above ceiling. The document is distributed by Lynn Imaging and modifies the original Project Manual and Construction Drawings dated November 12, 2024.

View the file

Other files

File Type Posted
Final_RFB_785_2500000288_2_SO_FORM.PDF PDF
Final_RFB_785_2500000288_3_SO_FORM.PDF PDF
addendum no 1.pdf PDF
Final_RFB_785_2500000288_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-146-25

FOR: Business Office Renovation General Butler State Park Department of Parks Carrollton, Kentucky

DATE: December 10, 2024

RFB-785-2500000288

ADDENDUM NO. Two (2)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-146-25 For: Business Office Renovation General Butler State Park Department of Parks Carrollton, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

Dif f erent b y Des i gn – B u i l t on Expe r i enc e

BUSINESS OFFICE DAMAGE REPAIRS

General Butler State Resort Lodge

1608 KY-227

Carrollton, KY 41008

Addendum Number Two

10 December 2024

Project #: 670-CAYB-GB33-00 (DECA017)

TO ALL BIDDERS OF RECORD AND ALL REGULATORY AGENCIES

This Addendum forms part of the Contract Documents and modifies the Project Manual and the Construction Drawings dated 12 November 2024. Acknowledge receipt of this Addendum in Proposal. Failure to do so may subject Bidder to disqualification.

1.1 Reference: General Information – Warranties.

Clarification: All warranties shall begin upon the PROJECT SUBSTANTIAL COMPLETION date, not installation or shipping dates.

1.2 Reference: General Information

Clarification 1: General Contractor shall be responsible for providing dumpsters and portable toilets.

1.3 Reference: Drawings

MEP Drawings

Clarification 1: Sheets E101 and E201 – It will be acceptable to use MC (Metal Clad) cables for circuits from panel to all locations. Minimum circuit size shall be 20 Amp 2#12’s with 1#12 ground.

Clarification 2: Sheet E202 – Add sheet note description 5 as follows – “Circuits from IT room to main building mechanical room shall be underground. Conduits can be exposed at penetration into main building exterior wall. Patch existing sidewalk and exterior building as required to match existing conditions. Circuits to transition up interior wall to above ceiling.”

Clarification 3: Sheet E202 – Provide sheet note no. 5 tag to conduits between buildings.

1.4 Reference: Contractor Questions

Question 1: Tongue and groove wall planks to be provided by owner or general contractor?

Clarification: Tongue and groove linear solid wood wall planks to be provided by contractor per the architecture drawings and specifications.

Shane D Wiles, AIA, LEED AP BD+C Architect 713 Architects, PLLC

Addendum No Two.pdf
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM