This is an Addendum No. 1 to Invitation to Bid (RFB-253-24) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Hubert Spence Drainage Abandoned Mine Lands (AML) Reclamation Project in Martin County, Kentucky. The project involves comprehensive drainage remediation and site restoration work at multiple residential properties impacted by eligible mine drainage. Primary services include subdrain installation, mine portal closure, gabion retaining wall construction, concrete swale ditch construction, erosion and sediment control measures, utility relocation and replacement, landscape restoration, revegetation, and roadway repairs. The revised bid schedule itemizes 40 line items including mobilization/demobilization, utility relocation, landscape allowance, traffic control, structure removal and replacement, site preparation, reinforcing steel, concrete, filter fabric, geogrid, various stone backfill materials, silt barriers, excavation equipment, earthwork, erosion control blankets, subdrain systems, HDPE pipe installation, drop boxes, concrete headwalls, railroad rail barriers, gabion retaining walls, portal closures, seedbed preparation, agricultural limestone, fertilizer, seed, mulch, topsoil, cover crop, residential seeding, roadway stone, bituminous repair, and chain-link fencing. Contract completion is required within 120 calendar days from the award date. A pre-construction conference will be held prior to mobilization.
All unit prices and lump sum prices are subject to Allowable Price Limit (APL) ranges specified on the bid schedule, with prices outside these ranges potentially considered unbalanced bids requiring written justification. Payment for actual documented costs items such as utility relocation/replacement, landscape allowance, and structure removal/replacement will be reimbursed directly upon engineer approval. Contractors must submit the AML Contractor/Subcontractor Information Form with their bid or face rejection as non-responsive. Davis-Bacon scale wages apply to all contractors and subcontractors, with contractors responsible for determining missing wage categories and requesting specific rates from the Department of Labor post-award. The Commonwealth will obtain KYTC Encroachment Permits, KY Division of Water permits, and USACE permits; all other permits and associated fees are the contractor's responsibility. A valid Stream Construction Permit has already been obtained for floodplain work. The project is subject to comprehensive erosion and sediment control Best Management Practices, weekly inspections by the DAML Resident Inspector, and strict environmental compliance including concrete washout location restrictions, petroleum product storage limitations (1,300 gallons maximum on-site), and immediate spill cleanup protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2400000677_3_SO_FORM.PDF | ||
| Final_RFB_785_2400000677_1_SO_FORM.PDF | ||
| Final_RFB_785_2400000677_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-253-24
FOR: Hubert Spence Drainage AML Project Martin County, Kentucky
DATE: May 23, 2024
RFB-785-2400000677
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to Official Bid Documents; Bid Schedule; Replace with attached revised Bid Schedule.
Item 2: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-253-24 For: Hubert Spence Drainage AML Project Martin County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1.0 X NA ≤ NA = 25,000.00$
2 UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 5,000.0 X NA ≤ 1.00$ = 5,000.00$
3 LANDSCAPE ALLOWANCE A.C.U. A.C.U. 5,000.0 X NA ≤ 1.00$ = 5,000.00$
4 TRAFFIC CONTROL L.S. L.S. 1.0 X $500.00 ≤ NA = $
5 STRUCTURE REMOVAL/REPLACEMENT A.C.U. A.C.U. 15,000.0 X NA ≤ 1.00$ = 15,000.00$
6 SITE PREPARATION U.P. ACRE 3.0 X $750.00 ≤ $ = $
7 SITE PREPARATION- WASTE AREAS U.P. ACRE 0.5 X $750.00 ≤ $ = $
8 60 KSI REINFORCING STEEL U.P. LBS 2,300.0 X $0.75 ≤ $ = $
9 CONCRETE- FORMED & FINISHED U.P. CY 45.0 X $170.00 ≤ $ = $
10 FILTER FABRIC U.P. SY 1,100.0 X $0.50 ≤ $ = $
11 GEO-GRID U.P. SY 1,200.0 X $2.00 ≤ $ = $
12 NO. 2 STONE BACKFILL U.P. TON 100.0 X $15.00 ≤ $ = $
13 CLASS II BACKFILL U.P. TON 300.0 X $20.00 ≤ $ = $
14 SILT BARRIER - BALES & FENCE U.P. LF 800.0 X $1.00 ≤ $ = $
15 HOE RAM U.P. HOUR 20.0 X $60.00 ≤ $ = $
16 EARTHWORK (PLAN QUANTITY) P.Q. CY 1,000.0 X $1.00 ≤ $ = $
17 EARTHWORK - GRADEWORK U.P. ACRE 0.5 X $2,500.00 ≤ $ = $
18 EROSION CONTROL BLANKET- ECB U.P. SY 900.0 X $0.75 ≤ $ = $
19 CLASS II / III U.P. TON 300.0 X $20.00 ≤ $ = $
20 RETAINING WALL SUBDRAIN U.P. LF 95.0 X $15.00 ≤ $ = $
21 SUBDRAIN(12" DIA.) U.P. LF 350.0 X $15.00 ≤ $ = $
22 SUBDRAIN CONCRETE COLLARS U.P. EACH 2.0 X $50.00 ≤ $ = $
23 12" DIA. HDPE PIPE- STANDARD U.P. LF 180.0 X $0.00 ≤ $ = $
24 15" DIA. HDPE PIPE- STANDARD U.P. LF 40.0 X $10.00 ≤ $ = $
25 DROP BOX- CONCRETE U.P. EACH 1.0 X $1,250.00 ≤ $ = $
26 CONCRETE HEADWALL- PIPES ≤36" DIA. U.P. EACH 1.0 X $900.00 ≤ $ = $
27 RAILROAD RAILS- 130 LBS./YD. U.P. LF 60.0 X $10.00 ≤ $ = $
28 GABION RETAINING WALL U.P. CY 113.0 X $75.00 ≤ $ = $
29 PORTAL CLOSURE U.P. EACH 2.0 X $1,000.00 ≤ $ = $
30 SEEDBED PREPARATION U.P. ACRE 1.5 X $75.00 ≤ $ = $
31 AGRICULTURAL LIMESTONE U.P. TON 10.0 X $20.00 ≤ $ = $
32 FERTILIZER U.P. TON 1.0 X $600.00 ≤ $ = $
33 SEED U.P. LBS 120.0 X $4.00 ≤ $ = $
23073AMLBAML HUBERT SPENCE DRAINAGE (AML) RECLAMATION PROJECT
MARTIN COUNTY, KENTUCKY
BID SCHEDULE - REVISED ADDENDUM #1
34 MULCH- STRAW & HAY U.P. ACRE 1.5 X $100.00 ≤ $ = $
35 TOPSOIL U.P. CY 150.0 X $20.00 ≤ $ = $
36 COVER CROP U.P. BUSHEL 2.0 X $10.00 ≤ $ = $
37 RESIDENTIAL SEEDING U.P. ACRE 1.5 X $500.00 ≤ $ = $
38 ROADWAY STONE U.P. TON 450.0 X $20.00 ≤ $ = $
39 BITUMINOUS REPAIR U.P. TON 400.0 X $90.00 ≤ $ = $
40 CHAIN-LINK FENCE U.P. LF 70.0 X $15.00 ≤ $ = $
BID TOTAL = $
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL BID
AMOUNT TO BE VALID.
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
Revised 5/10/2023
COR & BID & BMP 1
23073AMLBAML HUBERT SPENCE DRAINAGE (AML) RECLAMATION PROJECT
MARTIN COUNTY, KENTUCKY
Written Location Directions: GPS Location 37° 55’ 0.77”N, 82° 32’ 42.72”W. From the intersection of
US-23 and KY-3 near Prestonsburg: Travel East on KY-3 (Bays Branch Road) 2.6 miles and turn right onto KY-3N. Travel 16 miles and take the ramp (on right) to the intersection with KY-645W. Travel 4.2 miles and turn right onto KY-3411 (Fitch Branch Road). Travel 0.5 miles and turn left onto KY-3 at the intersection. Travel KY-3N 2.1 miles and turn right onto Big Lick Branch Road. Project site is on
Spence Mountain Road (First road on left on Big Lick Branch Road).
Basic Project Description: The Hubert Spence residence is being impacted by drainage from an eligible mine immediately upslope. The Cubert Spence residence is immediately downslope of the Hubert Spence residence with a gabion wall between the residence and Big Lick Branch Road. This wall was recently addressed as part of the Cubert Spence Soil Nails project and this project will remediate issues left after completion of the previous soil nail project. Neighboring residences with drainage addressed under the
Stepp-Webb AML Reclamation Project will require gradework to address settling issues after that project’s completion.
At the Hubert Spence residence, subdrain will be installed between the residence and eligible mine works, 2 portals will be closed with non-wildlife aceessible portal closures and Class II surface ditch will collect drainage. Collected drainage will be routed to the existing installed drains to the north and south of the residence.
At the Cubert Spence residence, a gabion wall will be constructed to support the citizen’s driveway.
Drains installed in the existing gabion wall prior to shotcrete placement will be cut/shortened to prevent issues with passing traffic. The ditch between Big Lick Branch road and the gabion wall will be reconstructed with a 2’ Concrete Swale ditch. Grout that erupted to the surface during soil nail installation will be removed and the yard graded, topsoil placed and revegetated. Shotcrete application resulted in overspray on the metal outbuilding, which will be removed by cleaning or replacement.
Existing gabions at road level previously damaged by an auto accident will be repaired. The top of the gabions subject to shotcrete application will have excess reinforcing steel removed and receive a concrete top treatment. The residential gas line exposed and damaged from the soil nail installation running from the meter at the south end of the gabion walls to the Curtis Spence residence will be replaced and installed under the concrete swale ditch.
At the former Stepp-Webb project properties, the respective yards will be regraded and revegetated after settling around drainage installed as part of the original project and remediation of effects from storage/staging of equipment during the Cubert Spence Soil Nails project. 4” of topsoil for regrading yard areas has been included at the Stepp residence.
Waste generated by construction activities will be transported to an approved waste area approximately
0.2 miles from the project site. The project and waste sites have previously been disturbed by coal mining operations and residential development. Construction disturbances will be kept to a minimum utilizing the approved Best Management practices prior to beginning any major earth disturbance (excluding initial site preparation for access only) until all silt control measures will be installed. These include but are not limited to silt barriers (bales & silt fence). No trees greater than 3” diameter at breast height will need to be cut or removed for completion of the project. All disturbed areas (including waste areas) will be promptly revegetated at the end of construction. Cover crop is also provided in order to provide quick vegetative cover on any disturbed areas that will go undisturbed for at least two weeks, but not be ready for application of permanent revegetation. This project will affect Big Lick Branch stream as waste material will be placed in the floodplain. A valid Stream Construction Permit has been secured.
COR & BID & BMP 2
A. STANDARD DOCUMENTS
The AML Standard Details, Technical Specifications, and Bid Item Descriptions are posted on the
Division’s website at https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-
Lands/Pages/default.aspx
Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.
B. ALLOWABLE PRICE LIMIT
Allowable Price Limit (APL) is part of the contract documents and is stated on the Bid Schedule. The
Unit Price (UP) / Lump Sum Price (LS) has a low value defined for each item on the Bid Schedule. Any
Unit Price / Lump Sum Price outside this value may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid. The CONTRACTOR is also cautioned that other considerations for rejection, notwithstanding the APL, may be enforced (e.g.
total bid price being excessively over the ENGINEER’S ESTIMATE).
C. CONTRACT LENGTH
All work shall be completed within ONE HUNDRED TWENTY (120) calendar days from the effective date of the Award of Contract. Within the bounds of prudent project performance, it shall be the responsibility of the CONTRACTOR to plan and implement construction sequences which follow the intent of these CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special
Conditions and to protect any portion of the contract which may be completed before others.
D. CONTRACTOR’S INFORMATION SHEET
The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/SubContractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive”
E. SPECIAL CONDITIONS & PROJECT NOTES
- On occasion, a property owner may require a CONTRACTOR to add them on their General
Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the
CONTRACTOR when this requirement is being made by the property owner. In these cases, the
CONTRACTOR must submit to AML copies of their certificate of insurance documenting the
“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.
- Subdrain installed as part of this project is modified with 12” dia. HDPE pipe.
COR & BID & BMP 3
- The proposed waste area is within the 100-year floodplain, and a stream construction (floodplain) permit has been obtained. All permit restrictions must be observed and a copy of the permit available at the project site for review.
F. DAVIS BACON SCALE WAGES
The CONTRACTOR and all SUBCONTRACTORS are required to pay scale wages as defined in the contract documents. If all employment categories that may be used have not been listed and specified in the contract document, then the contractor must make his best determination of what the missing wage rate will be. Subsequently after the bid is awarded, the contractor must request the specific rate from the
Department of Labor. AML will not issue change orders for additional compensation if the wage rate determined by DOL is higher than the rate the contractor used to develop his bid. If wage rates are not included for a specific category, AML suggests that the contractor assume the highest operator or laborer wages that are listed when developing his bid.
G. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.
(Check all that apply)
☐KYTC Encroachment Permit
☒KY DOW Water Permits
☐USACE Permit
The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project. The
CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the CONTRACTOR. Please refer to
“General Provisions” in the AML Technical Specifications.
COR & BID & BMP 4
BID ITEM DESCRIPTION
23073AMLBAML HUBERT SPENCE DRAINAGE AML RECLAMATION PROJECT
MARTIN COUNTY, KENTUCKY
NO ITEM DESCRIPTION
1 MOBILIZATION This item consists of the mobilization and demobilization of the
CONTRACTOR’S forces and equipment in accordance with the
“Mobilization/Demobilization” AML Standard Technical Specification. The amount of this bid item is not to exceed 5 percent of the sum of the lump sum bid price.
Measurement: Not Applicable.
Payment: Payment shall be made at increments set in the AML Technical
Specifications totaling the Lump Sum price.
2 UTILITY
RELOCATION /
REPLACEMENT
This consists of furnishing all materials, equipment, and labor necessary to replace utilities damaged by construction or relocate any utilities that are in the construction area in accordance with the “Utility Relocation” AML Standard
Technical Specification. The CONTRACTOR is required to supply the
ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable.
Payment: Payment shall be made for Actual Documented Costs for
“UTILITY RELOCATION/REPLACEMENT” approved by the
ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
COR & BID & BMP 5
3 LANDSCAPE
ALLOWANCE
This item of work shall consist of furnishing all materials, equipment, and labor necessary to replace damaged landscape structures, plants and trees as depicted on Drawings and as directed by ENGINEER in accordance with the
“Revegetation” AML Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Conduct a picture inventory of landscape items that may be affected before construction starts and keep an item list of those landscape items that are affected.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable
Payment: Payment for Actual Documented Costs “LANDSCAPE
ALLOWANCE” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for the removal/replacement of landscape features as approved/directed by the ENGINEER in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
4 TRAFFIC CONTROL This item consists of maintaining and controlling traffic on existing roads
(public and private) affected by this project as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Traffic Control” AML
Standard Technical Specification. Appropriate signs shall be erected at the project limits and flag persons shall be used as needed.
Special Considerations: None
Major Incidentals: Signs, flaggers, steel plates, immediately clearing debris from roadway.
Measurement: Not Applicable.
Payment: Payment shall be made at the Lump Sum price bid for “TRAFFIC
CONTROL” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.
COR & BID & BMP 6
5 STRUCTURE
REMOVAL/
REPLACEMENT
This item represents the ENGINEER'S best estimate of removal/replacement cost of designated qualifying structural features “in kind” to facilitate normal construction activities as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Structure Removal / Replacement” AML
Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Inventory of structures, pictures, and dimensions, before construction starts. Any structures that are removed shall be accompanied by pictures.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: None
Payment: Payment shall be made for Actual Documented Costs for
“STRUCTURE REMOVAL/REPLACEMENT” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
6 SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 7
7 SITE
PREPARATION-
WASTE AREAS
This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, access improvement/construction, in-kind fence repair/replacement.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION- WASTE AREAS” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
8 60-KSI
REINFORCING
STEEL
This item consists of furnishing all materials, equipment, and labor necessary to properly installing 60 KSI reinforcing steel of various diameters and lengths as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” and “Steel” AML Standard Technical Specifications.
This bid item covers steel used for: reinforcement in concrete ditches (all types), footers, retaining walls, concrete piles & cap reinforcement, anchors, Special Considerations: See AML Technical Specification for overlap Steel
Item 2.2.6.
No splicing shall be permitted for length of steel less than 10 feet in length.
Splicing of lengths between 10 feet and 20 feet is allowed. No lengths less than
4 feet is allowed including the overlap.
For lengths greater than 20 feet splicing is allowed. Minimum length of steel shall be 10 foot including overlap.
Maximum of 10 % payment for overlap steel.
Major Incidentals: Coatings, excess steel, connections, cut-offs, testing, and waste materials
Measurement: Actual Quantities shall be measured as pounds of reinforcing steel placed and accepted by the ENGINEER. Actual Quantities may be obtained by using a CRSI chart that shows lbs/lf for each size bar and multiplying the length of each bar used.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “60-KSI REINFORCING STEEL” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment as specified shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 8
CONCRETE-
FORMED &
FINISHED
This item consists of furnishing all materials, equipment, and labor necessary to construct concrete field cast items as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” AML Standard
Technical Specification. This bid item covers concrete used for: concrete ditches (all types), retaining walls (all types), footers, caps, and any other purpose that requires formwork and/or finishing. All formwork, no matter the size/scale or changes are incidental, including increases in heights of walls.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Formwork (including height/width increases), admixtures, finishing, materials testing.
Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price for “CONCRETE- FORMED & FINISHED” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
10 FILTER FABRIC This item consist of furnishing all materials, equipment, and labor, necessary to install filter fabric utilized in ditch construction as depicted on the Drawings and as directed by the ENGINEER in accordance with “Filter Fabric” AML
Standard Technical Specification. This includes all types of filter fabric used on a jobsite. The standard details list the type and quantity of fabric for each purpose.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Staples
Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “FILTER FABRIC” in accordance with the “General
COR & BID & BMP 9
11 GEOGRID This item consist of furnishing all materials, equipment, and labor, necessary to install geogrid, including all labor, materials, and accessories as depicted on the
Drawings and as directed by the ENGINEER in accordance with “Geo-grid”
AML Standard Technical Specification. All geo-grid is bi-axial, except for tails behind Non-reinforced Block Walls- Type I.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Staples
Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “GEOGRID” in accordance with the “General
12 NO. 2 STONE
BACKFILL
This item shall consists of furnishing all materials, equipment, and labor necessary to place No. 2 stone aggregate as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed Aggregate and
Channel Lining” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “NO. 2 STONE BACKFILL” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and
13 CLASS II BACKFILL This item consists of furnishing all materials, equipment, and labor necessary to place Class II aggregate as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II BACKFILL" in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 10
14 SILT BARRIER–
BALES & FENCE
This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML
Standard Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.
Special Considerations: None
Major Incidentals: Maintenance, silt fence trenching and removal
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and
15 HOE RAM This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of rock utilizing a hoe ram as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Equipment” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Equipment, operator, fuel, maintenance items
Measurement: Actual Quantities shall be measured as the next whole equipment hour when required to construct ditches and other features approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HOE RAM” in accordance with the “General constitute full compensation for materials, equipment, labor and incidentals.
COR & BID & BMP 11
16 EARTHWORK This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: No measurements will be made unless the ENGINEER significantly revises the dimensions of the work area(s).
Payment: Payment shall be the product of the Plan Quantity Volume and the
Unit Price bid for “EARTHWORK” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and gradework efforts associated with designated waste areas.
17 EARTHWORK –
GRADEWORK
This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavating, placement, and grading of material as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre.
Payment: Payment shall be the product of the Plan Quantity Volume and the
Unit Price bid for “EARTHWORK-GRADEWORK” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and gradework efforts associated with designated waste areas.
COR & BID & BMP 12
18 EROSION
CONTROL
BLANKET-ECB
(BENCHES,
DITCHES, &
SLOPES)
This item consist of furnishing all materials, equipment, and labor necessary to install all types of erosion control blanket (ECB) as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Erosion Control Blanket” AML Standard Technical Specification.
Subgrade preparation shall be incidental. Placement of ECB for slope protection will also be covered by this bid item.
Special Considerations: None
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EROSION CONTROL BLANKET-ECB” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.
19 CLASS II / III –
(DITCHES,
ANCHORS, DRAINS,
& BUTTRESSES)
This item consist of furnishing all materials, equipment, and labor necessary to install Class II and Class III rock as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” and “Ditches” AML Standard Technical
Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report %
CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton.
Material exceeding the 85% minimum is not adjusted.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II/III” in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 13
RETAINING WALL
SUBDRAIN
This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface
Drains” AML Standard Technical Specifications.
Special Considerations: None
Major Incidentals: Pipe, filter fabric, aggregate backfill
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “RETAINING WALL SUBDRAIN” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, 21 SUBDRAIN (12”
DIA.)
This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface
Drains” AML Standard Technical Specifications.
Special Considerations: All subdrain on this project is modified with 12” dia.
pipe.
Major Incidentals: Excavation to depth of 3’, pipe, filter fabric, aggregate backfill to depth of 3’.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER. Subdrains requiring more than the incidental quantity of rock will be paid from the No. 2 Stone bid item or
Roadway Stone if a No. 2 Stone bid item is not listed. All excavation is incidental to the earthwork.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SUBDRAIN” in accordance with the “General
COR & BID & BMP 14
22 SUBDRAIN
CONCRETE
COLLARS
This item of work shall consist of furnishing all labor, materials, and equipment necessary to construct subdrain concrete collars as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete” and “Subsurface Drains” AML Standard Technical
Specifications.
Special Considerations: None
Major Incidentals: Concrete, forming, steel
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “SUBDRAIN CONCRETE COLLARS” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
12” DIA. HDPE PIPE-
STANDARD
This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the
Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout
Products”, and “Pipe” AML Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
COR & BID & BMP 15
15” DIA. HDPE PIPE-
STANDARD
This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the
Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout
Products”, and “Pipe” AML Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
25 DROP BOX-
CONCRETE
This item consists of furnishing all materials, equipment, and labor, necessary to construct concrete drop boxes as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with the “Drop /
Junction Boxes” AML Standard Technical Specifications up to a depth of 8’.
Special Considerations: None
Major Incidentals: Concrete, steel reinforcement, grout, formwork, aggregate backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “DROP BOX-CONCRETE” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, COR & BID & BMP 16
26 CONCRETE
HEADWALL- PIPES
≤36” DIA.
This item consists of furnishing all materials, equipment, and labor, necessary to construct the headwalls as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete
Headwalls” AML Standard Technical Specification. Units cast in the field require fiber, pre-cast units require manufacturer certification that concrete meets or exceeds required strength.
Special Considerations: None
Inspector Notes: For pre-cast units collect manufacturer certificate (includes strength of concrete used).
Major Incidentals: Concrete, steel reinforcement, fiber, grout, formwork, dissipaters, backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CONCRETE HEADWALL- PIPES ≤36”
DIA.” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
27 RAILROAD RAILS-
130 LBS/YD
This item consists of furnishing all materials, equipment, and labor necessary to install the railroad rail steel as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Barrier- Rail/Steel Panel Wall” AML
Standard Technical Specification.
Special Considerations: This bid item is intended for (but not limited to) stabilization of the earthen bank behind the Cubert Spence garage using 10’ lengths of rail steel pushed into place by an excavator to refusal.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “RAILROAD RAILS- 130 LBS/YD” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, COR & BID & BMP 17
28 GABION
RETAINING WALL
This item consists of furnishing all materials, equipment, and labor, necessary to prepare a uniform foundation, furnishing, placing and filling gabion baskets as depicted on the Drawings, AML Standard Details, and as directed by the
ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”
“Geogrid”, “Filter Fabric”, and “Gabions” AML Standard Technical
Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Gabion baskets, gabion aggregate, Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for “GABION RETAINING WALL” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
29 PORTAL CLOSURE This item consists of furnishing all materials, equipment, and labor necessary to close mine portals as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Portal Closure” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Earthwork, excavation, cement, block, pipe, steel, concrete
Measurement: Actual Quantities shall be measured as “EACH” closure completed and accepted by ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “PORTAL CLOSURE” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payments shall
30 SEEDBED
PREPARATION
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEEDBED
PREPARATION” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 18
31 AGRICULTURAL
LIMESTONE
These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. DAML will use the current Limestone
Sample Results published by the KY Department of Agriculture to determine a
Relative Neutralizing Value (RNV) for weight adjustment.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Application and incorporation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.) aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "AGRICULTURAL
LIMESTONE” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
32 FERTILIZER
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, COR & BID & BMP 19
33 SEED
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Seed mixture will be listed on the
Drawings, Project Description, and/or Special Conditions.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals:
Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEED” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and
34 MULCH- STRAW &
HAY
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
35 TOPSOIL This item shall consist of furnishing all materials, equipment, and labor necessary replace to place topsoil as depicted on the Drawings and as directed by the ENGINEER in accordance with “Revegetation” AML Standard
Technical Specification.
Special Considerations: This bid item is intended for use in the Cubert Spence and Egie Stepp yard areas in conjunction with gradework.
Major Incidentals: Transportation and Placement.
Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “TOPSOIL” in accordance with the “General Provisions”
AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
COR & BID & BMP 20
36 COVER CROP
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Cover crop will be winter wheat in the fall and winter and German Foxtail Millet in the spring and summer months.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole bushel approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for “COVER CROP” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
37 RESIDENTIAL
SEEDING
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Seedbed preparation, agriculture limestone, fertilizer, seed, and mulch
Measurement: Actual Quantities shall be measurement as the next tenth of an acre seeded as approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “RESIDENTIAL SEEDING” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
38 ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining” AML Standard Technical
Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROADWAY STONE” in accordance with the “General
COR & BID & BMP 21
39 BITUMINOUS
REPAIR
This item shall consist of furnishing all materials, equipment, and labor necessary to repair bituminous surfaces damaged by construction activities as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Bituminous Repair” AML Standard Technical Specification.
Removal and disposal of old materials are covered under the site preparation bid item.
Special Considerations: None
Major Incidentals: DGA, subgrade preparations, materials, placement
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of bituminous placed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “BITUMINOUS REPAIR” in accordance with the “General
40 CHAIN LINK FENCE This item shall consist of furnishing all materials, equipment, and labor necessary to construct a chain-link safety fence as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Fence” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole linear feet of fence installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for “CHAIN LINK FENCE” in accordance with the “General
COR & BID & BMP 22
Erosion and Sediment Control
Best Management Practices (BMP) Plan
January 2017
COR & BID & BMP 23
OVERVIEW
This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned
Mine Lands (DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML)
Reclamation and Acid Mine Drainage (AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical Specifications and Standard
Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.
This general BMP document is to outline the various pollution prevention measures used on
AML Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES
Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas
(DDAs) and related information. The construction notes and project description may…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .