Addendum No. One - Sealed (Excluding Revised Sheets).pdf
PDF 477 KB Posted
- Solicitation number
- 081-011-23-02 DST (J)/ROAD (L)
- Issued by
- Brazoria County, Texas
About this file
This is an Addendum No. One to a bid proposal issued by Brazoria County Municipal Utility District No. 57 for water distribution, wastewater collection, storm water facilities, and paving infrastructure serving Meridiana Section Twenty Three-B. The project encompasses the installation of approximately 2,980 linear feet of 8-inch PVC water line, 2,890 linear feet of 8-inch PVC sanitary sewer, 2,150 linear feet of 24-48 inch reinforced concrete pipe storm sewer, and 10,080 square yards of 6-inch reinforced concrete paving. Additional work includes site preparation across 23 acres, installation of water system components such as gate valves, fire hydrants, and service leads, sanitary sewer infrastructure with manholes and service leads, storm water collection components with inlets and outfalls, roadway excavation totaling 14,056 cubic yards, subgrade preparation, and storm water pollution prevention plan compliance. Sealed bids were due by 2:00 p.m. on Tuesday, September 22, 2026, submitted to the office of the Engineer (EHRA) at 10011 Meadowglen Lane, Houston, Texas, or electronically via www.civcastusa.com. The successful contractor must begin work within five calendar days of written notice and achieve final completion within 100 calendar days, with liquidated damages applied for non-completion within the specified timeframe.
The bid proposal requires contractors to provide unit prices for all 63 line items plus four additional bid items and associated lump sum costs for construction permits, staking services, and post-construction surveying and record drawing preparation. The contractor must furnish performance bonds and payment bonds equal to 100 percent of the contract amount, along with satisfactory insurance certificates. The bid quantities were tabulated from a non-approved set of construction drawings, with the caveat that final quantities may vary slightly from bid estimates. Contractors acknowledge receipt of Addendum No. One and agree to execute the contract on standard forms of agreement specified in the bid documents. A third-party entity shall be responsible for complete Storm Water Pollution Prevention Plan compliance and repair of control measures caused by parties other than the contractor, while the contractor remains responsible for repairs resulting from their own construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Documents (Sealed) (2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brazoria County Municipal Utility District No. 57
Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to serve
Meridiana Section Twenty Three-B
ADDENDUM NO. ONE
September 3, 2026
1. Reference to Bid Proposal:
Replace the Bid Proposal with the following revised proposal, dated September 3, 2026, marked Addendum No. One.
Entire bid proposal has been revised.
2. Reference to Bid Set Plans:
Replace the Bid Set Plans with the following revised sheets 1-15, marked Addendum No. One.
Please be reminded that all bids are to be submitted to the office of the Engineer for the District, EHRA, 10011 Meadowglen Lane, Houston, Texas by 2:00 p.m., Tuesday, September 22, 2026, or electronically via www.civcastusa.com
09/03/2026 http://www.civcastusa.com/
EHRA
Master Specifications Bid Proposal
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Addendum No. One.doc
Date:
Bid of , an individual proprietorship/a corporation organized and existing under laws of the State of Texas/a partnership consisting of , for construction of:
Brazoria County Municipal Utility District No. 57 Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to serve
Meridiana Section Twenty Three-B – ADDENDUM NO. ONE
To: Brazoria County Municipal Utility District No. 57
Gentlemen:
The undersigned bidder has carefully examined the Instruction to Bidders, this bid, the form on Contract and its General and Special Conditions, the Technical Specifications, and the Plans for the work herein above described and referred to in the "Invitation to Bid", and also the site of the work and will provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other means of construction to complete all the work upon which he bids, as provided by the Special Conditions of the Contract, the Technical Specifications and shown on the plans, and binds himself on acceptance of his bid to execute a Contract, bonds and insurance, according to the prescribed forms, for performing and completing the said work within the time stated, and for maintaining same as required for the following prices:
If awarded the Contract, I/we will execute Contract on the Standard Forms of Agreement and furnish satisfactory insurance certificate and satisfactory performance and payment bonds in accordance with the Bid Documents.
Bidder acknowledges receipt of the following addendum(s):
No. 1: No. 2: No. 3: No. 4: No. 5: No. 6:
(Bidder-Company Name) (Print or Type Name)
(Signature) (Title)
It is understood that the Contractor is subject to a deduction from payments due him if the work is not completed within the specified number of calendar days. This deduction will be based on the schedule included in the "Special Conditions of the Agreement" which is a part of the Bid and Contract Documents.
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT
1. Stripping and Site Preparation for All Areas to Receive
Fill if and only if, Organics and Deleterious Materials are Present to a Minimum Depth of 6-Inches Below
Natural Ground Prior to the Excavation, Placement and
Grading of Any Fill Material (all strippings are to be evenly placed and graded on the filled and graded areas;
area has already been filled, and this item will be used only as directed and authorized, in writing, by the
Engineer, if required)
AC 23 $_______________ $_______________
TOTAL SITE PREPARATION: $___________________
BRAZORIA COUNTY
MUNICIPAL UTILITY DISTRICT NO. 57
MERIDIANA SECTION TWENTY THREE-B (P-4943)
BID PROPOSAL - ADDENDUM NO. ONE
SITE PREPARATION
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
Quantities reflected on this Bid Proposal were tabulated from a NON APPROVED set of Construction Drawings.
2. Furnish and Install 8-Inch C-900 PVC Pipe, (Including fittings, thrust blocking and appurtenances with
Standard bedding and backfill, complete in place.)
LF 2,527 $____________ $______________
3. Furnish and Install 8-Inch C-900 PVC Pipe with restrained joints, (Including fittings, thrust blocking and appurtenances with Standard bedding and backfill, complete in place.)
LF 454 $____________ $______________
4. 8-Inch Gate Valve and Box (furnish and install, complete in place)
EA 6 $____________ $______________
5. 6-Inch Gate Valve and Box (furnish and install, complete in place)
EA 9 $____________ $______________
6. 6-Inch, C-900, PVC Fire Hydrant Lead, (furnish and install, thrust blocking, all depths, complete in place)
LF 90 $____________ $______________
7. Standard Fire Hydrant (furnish and install, complete in place)
EA 9 $____________ $______________
8. Remove and Dispose End of Line Fire Hydrant
Assembly (Furnish and install complete in place
EA 1 $____________ $______________
9. 8-Inch Wet Connection (furnish and install, complete in place)
EA 1 $____________ $______________
10. Long Single Water Service Lead (furnish and install with meter boxes and 1-Inch Mueller straight curbstop
P-24350 or equal approved by operator, complete in place)
EA 36 $____________ $______________
11. Short Single Water Service Lead furnish and install with meter boxes and 1-Inch Mueller straight curbstop
P-24350 or equal approved by operator, complete in place)
EA 21 $____________ $______________
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
BID PROPOSAL - ADDENDUM NO. ONE
WATER DISTRIBUTION SYSTEM
MUNICIPAL UTILITY DISTRICT NO. 57
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
from a NON APPROVED set of Construction Drawings
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
BID PROPOSAL - ADDENDUM NO. ONE
WATER DISTRIBUTION SYSTEM
MUNICIPAL UTILITY DISTRICT NO. 57
12. Trench Safety System (furnish and install, complete in place)
LF 3,071 $____________ $______________
TOTAL WATER DISTRIBUTION SYSTEM: $___________________
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
13. Furnish and Install 8-Inch SDR-26, PVC Pipe Sanitary
Sewer with Standard Bedding and Backfill (all depths, complete in place)
LF 2,412 $____________ $______________
14. Furnish and Install 8-Inch AWWA C-900, PVC Pipe
Sanitary Sewer with Standard Bedding and Backfill (all depths, complete in place)
LF 460 $____________ $______________
15. Standard City of Manvel 4-Foot Diameter Sanitary
Sewer Manhole (including inflow protectors, furnish and install, complete in place)
EA 19 $____________ $______________
16. Extra Depth for Manhole, Greater Than 8-Foot Deep
(furnish and Install, complete in place)
VF 22 $____________ $______________
17. Long Side Sanitary Sewer Service Lead (furnish and install, complete in place)
EA 8 $____________ $______________
18. Long Side Sanitary Sewer Service Lead with Riser
(furnish and install, complete in place)
EA 5 $____________ $______________
19. Short Side Sanitary Sewer Service Lead (furnish and install, complete in place)
EA 13 $____________ $______________
20. Short Side Sanitary Sewer Service Lead with Stack
(furnish and install, complete in place)
EA 9 $____________ $______________
21. Remove and Dispose 8-Inch Stub and Plug and Provide
Flexible Water Tight Seal of Pipe to Manhole (complete in place)
EA 1 $____________ $______________
22. Well Point De-Watering for Sanitary Sewer
Construction (only as directed, in writing, by the
Engineer; minimum bid $25.00/LF)
LF 2,872 $____________ $______________
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
WASTEWATER COLLECTION SYSTEM
MUNICIPAL UTILITY DISTRICT NO. 57
BID PROPOSAL - ADDENDUM NO. ONE
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
WASTEWATER COLLECTION SYSTEM
MUNICIPAL UTILITY DISTRICT NO. 57
BID PROPOSAL - ADDENDUM NO. ONE
23. Crushed Stone Foundation with Filter Fabric Wrap as per City of Manvel (only as directed, in writing, by the
Engineer; minimum bid $10.00/LF)(furnish and install, complete in place)
LF 2,872 $____________ $______________
24. Crushed Stone Foundation and Embedment with Filter
Fabric Wrap as per City of Manvel (only as directed, in writing, by the Engineer; minimum bid
$25.00/LF)(furnish and install, complete in place)
LF 1,436 $____________ $______________
25. Adjust Existing Manhole Top to Finished Grade with a minimum of 6-Inch Adjustment Rings (complete in place)
EA 1 $____________ $______________
26. Trench Safety System (furnish and install, complete in place)
LF 2,872 $____________ $______________
TOTAL WASTEWATER COLLECTION SYSTEM: $__________________
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
STORM WATER COLLECTION SYSTEM
27. Furnish and Install 48-Inch RCP, C-76 CL III Storm
Sewer with Standard Bedding and Backfill (complete in place)
LF 385 $____________ $______________
28. Furnish and Install 36-Inch RCP, C-76 CL III Storm
Sewer with Standard Bedding and Backfill (complete in place)
LF 70 $____________ $______________
29. Furnish and Install 30-Inch RCP, C-76 CL III Storm
Sewer with Standard Bedding and Backfill (complete in place)
LF 432 $____________ $______________
30. Furnish and Install 24-Inch RCP, C-76 CL III Storm
Sewer with Standard Bedding and Backfill (complete in place)
LF 1,115 $____________ $______________
31. Furnish and Install 24-Inch RCP, C-76 CL III Storm
Sewer Inlet Lead (complete in place)
LF 224 $____________ $______________
32. 48-Inch RCP Storm Sewer Outfall Pipe (furnish and install, complete in place with standard bedding and backfill)
LF 236 $____________ $______________
33. Standard City of Manvel Type "C" Storm Sewer Inlet
(furnish and install, complete in place)
EA 2 $____________ $______________
34. Standard City of Manvel Type "C-1" Storm Sewer
Inlet (furnish and install, complete in place)
EA 11 $____________ $______________
35. Standard City of Manvel Type "C" Storm Sewer
Manhole (24"-42") (furnish and install, complete in place)
EA 20 $____________ $______________
BRAZORIA COUNTY
BID PROPOSAL - ADDENDUM NO. ONE
MERIDIANA SECTION TWENTY THREE-B (P-4943)
MUNICIPAL UTILITY DISTRICT NO. 57
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
STORM WATER COLLECTION SYSTEM
BRAZORIA COUNTY
BID PROPOSAL - ADDENDUM NO. ONE
MERIDIANA SECTION TWENTY THREE-B (P-4943)
MUNICIPAL UTILITY DISTRICT NO. 57
36. Connection of Storm Sewer Outfall to Existing
Detention Pond including but not limited to; Plugging, By-Pass Pumping and Re-Establishment of Existing
Conditions (i.e. Clay Liner, Side Slope, Highbank, Maintenance Berm, Landscaping, Seeding, etc.)
Contractor to provide plan of execution in writing to the Engineer for approval. CMT testing is required.
(complete in place)
EA 2 $____________ $______________
37. Pumping of Storm Water Run-Off as Required During
Outfall Construction (3,000 GPM minimum per pumping operation; one (1) day is defined as pumping out Storm Water Run-Off for one (1) continuous twelve (12) hour period with one (1) 3,000 GPM pump (min); only as directed and as authorized by the
Engineer)
DAYS 10 $____________ $______________
38. Clean, De-Muck and Fill Existing Swale (complete in place)
LF 1,454 $____________ $______________
39. Trench Safety (furnish and install, complete in place) LF 2,462 $____________ $______________
TOTAL STORM WATER COLLECTION SYSTEM: $__________________
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
40. Roadway Excavation - on-site disposal on stripped (4-inch minimum depth) and proof-roll tested areas in Meridiana Section Twenty Three-
B as Indicated in the Approved Construction
Drawings; Including 4,931 CY of utility spoil
(haul, place, grade and compact spoil/fill to proposed grades in maximum 8-Inch lifts (loose measure) and compact to 95% SPD, +/-2% of
Optimum Moisture)
CY 14,056 $____________ $_______________
41. Lot Manipulation/Excavation (Contractor to strip all lots/areas to receive fill of all organics to a minimum depth of four (4) inches below natural ground prior to placement and grading of said fill material; all strippings are to be placed and evenly graded over filled lots/areas)
CY 3,682 $____________ $_______________
42. Proof-Roll test paving subgrade and spoil sites with fully loaded street legal tandem axle dump truck before subgrade stabilization operations and prior to placement of pavement (test to be witnessed by a representative from the construction materials testing service provider and by a representative from the Engineer; a minimum of 24 hours advanced prior notice must be given to the project site representative prior to proof-roll testing operations)
LS 1 $____________ $_______________
43. Type "B" Lime (60#/Sy.; furnish, complete in place)
TONS 336 $____________ $_______________
44. Class "C" Fly Ash (15#/Sy.; furnish, complete in place)
TONS 84 $____________ $_______________
45. 8-Inch Stabilized Subgrade Preparation (furnish and install, complete in place)
SY 11,195 $____________ $_______________
BID PROPOSAL - ADDENDUM NO. ONE
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
EXCAVATION, PAVING AND GRADING
MUNICIPAL UTILITY DISTRICT NO. 57
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
BID PROPOSAL - ADDENDUM NO. ONE
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
EXCAVATION, PAVING AND GRADING
MUNICIPAL UTILITY DISTRICT NO. 57
46. 6-Inch Reinforced Concrete Pavement (furnish and install, complete in place)
SY 10,072 $____________ $_______________
47. 6-Inch Reinforced Concrete Curb (furnish and install, complete in place)
LF 1,132 $____________ $_______________
48. 4-Inch x 12-Inch Reinforced Concrete Curb
(furnish and install, complete in place)
LF 4,948 $____________ $_______________
49. Tie Into Existing Reinforced Concrete Pavement
(complete in place)
EA 2 $____________ $_______________
50. Wheelchair Ramps (per details; furnish and install, complete in place)
EA 4 $____________ $_______________
51. Remove and Dispose of Existing Type III
Barricade (complete in place)
EA 2 $____________ $_______________
52. Stop Sign with Dual Street Name Sign (as per recorded plat; furnish and install, complete in place)
EA 3 $____________ $_______________
53. Dual Street Name Sign (as per recorded plat;
furnish and install, complete in place)
EA 2 $____________ $_______________
54. 30-Inch x 30-Inch No Outlet Sign (W14-
2)(furnish and install, complete in place)
EA 1 $____________ $_______________
55. Lot Grading (complete in place) EA 57 $____________ $_______________
56. Reserve Grading (per supplemental grading sheet;
complete in place)
EA 3 $____________ $_______________
57. Subdivision Traffic Buttons and Pavement
Markings (Inclusive of parking stall striping)
LS 1 $____________ $_______________
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
BID PROPOSAL - ADDENDUM NO. ONE
BRAZORIA COUNTY
MERIDIANA SECTION TWENTY THREE-B (P-4943)
EXCAVATION, PAVING AND GRADING
MUNICIPAL UTILITY DISTRICT NO. 57
58. 5-Inch Thick Reinforced concrete Slope Paving including Toe Wall (complete in place)
SY 36 $____________ $_______________
59. 2-Inch, Sch-40 PVC Irrigation/Electrical Sleeve
(including cement stabilized sand bedding and backfill, elbows, risers, fittings, caps, etc.; only as authorized and as directed, in writing, by the
Engineer; furnish and install, complete in place)
LF 114 $____________ $_______________
60. 2-Inch Gray PVC Conduit (including cement stabilized sand bedding and backfill, elbows, risers, fittings, caps, etc.; only as authorized and as directed, in writing, by the Engineer; furnish and install, complete in place)
LF 44 $____________ $_______________
61. 1-Inch Gray PVC Conduit (including cement stabilized sand bedding and backfill, elbows, risers, fittings, caps, etc.; only as authorized and as directed, in writing, by the Engineer; furnish and install, complete in place)
LF 114 $____________ $_______________
62. 6-Inch, ADS N-12 Sleeve (including cement stabilized sand bedding and backfill, elbows, risers, fittings, caps, etc.; only as authorized and as directed, in writing, by the Engineer; furnish and install, complete in place)
LF 44 $____________ $_______________
TOTAL EXCAVATION, PAVING AND GRADING: $__________________
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
STORM WATER POLLUTION PREVENTION PLAN
63. Enforcement of TPDES Requirements and General
Source Controls; Including Filing NOI and NOT, Jobsite Postings, Regular Inspections, Filing Reports, etc. as Required for SWPPP Compliance for Duration of Construction Project; Contractor is to Practice
Good Housekeeping Rules at All Times During
Construction and is Responsible to Repair All
Damage to the Control Measures as a Result of their own Construction Activities; a Third Party will be
Responsible for Complete SWPPP Compliance for the Developer and for the Repair of Any and All
Damage to the Control Measures Caused by Parties
Other than the Contractor
LS 1 $____________ $_______________
TOTAL STORM WATER POLLUTION PREVENTION PLAN: $__________________
BRAZORIA COUNTY
BID PROPOSAL - ADDENDUM NO. ONE
MERIDIANA SECTION TWENTY THREE-B (P-4943)
MUNICIPAL UTILITY DISTRICT NO. 57
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
DESCRIPTION AMOUNT
Site Preparation $_____________________
Water Distribution System $_____________________
Wastewater Collection System $_____________________
Storm Water Collection System $_____________________
Excavation, Paving and Grading $_____________________
Storm Water Pollution Prevention Plan $_____________________
Certificates of Insurance and Performance, Payment and Maintenance Bonds as Indicated in the Contract
Documents
Construction Permits $_____________________
One-Time Only Construction Staking Service as
Indicated in the Special Conditions section of the
Contract Documents
Post Construction Topographic Verification, As-Built
Survey and Record Drawing Preparation to be performed by Edminster, Hinshaw, Russ & Associates, dba, EHRA, as Indicated in the Special Conditions section of the Contract Documents and in Accordance with Standards, Rules and Regulations and signed by
Registered Professional Engineer. (minimum bid
$18,500.00)
TOTAL AMOUNT BID: $____________________
BRAZORIA COUNTY
MUNICIPAL UTILITY DISTRICT NO. 57
MERIDIANA SECTION TWENTY THREE-B (P-4943)
BID PROPOSAL - ADDENDUM NO. ONE
BID SUMMARY
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
ADD 1.1 Extra Cost for Hauling in Off-Road Trucks to
Alternate Spoil Site, no further than 2 miles round-trip from end of project boundary
(complete in place)
CY 2,000 $____________ $_______________
ADD 1.2 Extra Cost for Hauling in On-Road Trucks to
Alternate Spoil Site, no further than 2 miles round-trip from end of project boundary
(complete in place)
CY 2,000 $____________ $_______________
ADD 1.3 Dewatering Deep Wells (complete in place) EA 10 $____________ $_______________
ADD 1.4 Pipeline Corridor Construction Crossing
Includes Wood Mats, Air Bridges, etc. and
Coordination, as Required for Completion of
Project (furnish and install at direction of
Pipeline Company; complete in place)
LS 1 $____________ $_______________
TOTAL EXCAVATION, PAVING AND GRADING: $___________________
BRAZORIA COUNTY
MUNICIPAL UTILITY DISTRICT NO. 57
MERIDIANA SECTION TWENTY THREE-B (P-4943)
BID PROPOSAL - ADDENDUM NO. ONE
EXCAVATION, PAVING AND GRADING
ADDITIONAL BID ITEMS
EHRA
September 3, 2026
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Meridiana Sec 23B - WSD and Paving - Addendum No. One
ADDENDUM NO. ONE
EHRA
Master Specifications Bid Proposal
P:\081-011-23-02\CPS\Utilities (DST)\Contract Docs\Bid Docs\Bid Proposal - Addendum No. One.doc
It is also understood that in the event the successful bidder fails to enter into the Contract and to furnish a Performance Bond and Payment Bond in the amount of 100 percent of the contract for all parts of the work, he will forfeit the Cashier's Check, Certified Check, or Bidder's Bond, as provided in the Specifications.
The undersigned proposes, if awarded the contract, to begin work within five (5) calendar days from written notice to commence work is given by the Engineer, and to have Final Completion of the work within one hundred (100) calendar days from the date of the written notice to commence work.
The quantities reflected in this Bid Proposal were tabulated from a set of drawings issued for bidding purposes only. The final quantities constructed may vary slightly from the bid quantities.
This bid proposal shall be considered part of the Contract.
Respectfully yours, (Bidder-Company Name) (Address - Physical)
(Signature) (City) (County)
(Print or Type Name) (State) (Zip Code)
(Title) (Address - Mailing)
(Name of Surety) (City) (State) (Zip Code)
(Phone)
ATTEST
(Fax)
Seal, if Bidder is a Corporation (E-mail)
File details come from the government source that posted it. Updated .