Addendum No. One (Sealed).pdf
PDF 365 KB Posted
- Solicitation number
- 151-031-12-01 DST (K)
- Issued by
- Harris County, Texas
About this file
This is Addendum No. One to a sealed bid proposal issued by Harris County Municipal Utility District No. 525 for the Water Plant No. 1 Expansion to serve Sundance Cove. The addendum, dated August 25, 2026, revises the original bid proposal and extends the bid submission deadline from Wednesday, August 26, 2026 at 3:00 p.m. to Wednesday, September 9, 2026 at 3:30 p.m. The project scope includes the construction of a 212,361-gallon powder-coated bolted steel ground storage tank with associated site work, piping modifications, electrical system modifications, chlorine gas disinfection system modifications, and storm water pollution prevention plan compliance. Bid items encompass site work preparation and restoration, tank construction and disinfection, concrete foundations, piping and valve modifications, electrical modifications, and TPDES compliance enforcement. Bids are to be submitted to the office of the Engineer for the District, EHRA, located at 10011 Meadowglen Lane, Houston, Texas, or electronically via www.civcastusa.com. Contractors must provide the number of calendar days required for substantial completion, begin work within seven calendar days of written notice, and identify all subcontractors for site work, electrical work, and surface preparation and coatings application.
The bid proposal includes separate line items for site work, water plant construction, electrical work, and storm water pollution prevention plan compliance, along with additional costs for mobilization, certificates of insurance, performance and payment bonds (maximum $100,000), construction permits, construction staking services (minimum $6,000), and post-construction topographic verification and as-built survey preparation (minimum $4,000). Bidders must submit a complete equipment supplier and subcontractor list with their proposals; failure to do so results in disqualification. The successful bidder must execute the Contract on standard forms of agreement and furnish satisfactory insurance certificates and performance and payment bonds equal to 100 percent of the contract value. The bid documents note that quantities were tabulated from a non-approved set of construction drawings and may vary slightly from final constructed quantities. Bidders are responsible for liquidated damages if work is not completed within the specified calendar days as detailed in the Special Conditions of the Agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Docs (Sealed).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harris County Municipal Utility District No. 525
Water Plant No. 1 Expansion to serve
Sundance Cove
ADDENDUM NO. ONE
August 25, 2026
1. Reference to Bid Proposal:
Replace the Bid Proposal with the following revised proposal, dated August 25, 2026, marked Addendum No. One.
Site Work Bid Item No. 1 has been added.
Water Plant Bid Item No. 4 has been revised.
2. Reference to Bid Date:
The Bid Date has been changed from Wednesday, August 26, 2026 at 3:00 p.m. to Wednesday, September 9, 2026 at 3:30 p.m.
Please be reminded that all bids are to be submitted to the office of the Engineer for the District, EHRA, 10011 Meadowglen Lane, Houston, Texas or electronically via www.civcastusa.com.
08/25/2026 http://www.civcastusa.com/
EHRA
Master Specifications Bid Proposal
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Addendum No. One.doc
Date:
Bid of , an individual proprietorship/a corporation organized and existing under laws of the State of Texas/a partnership consisting of , for construction of:
Harris County Municipal Utility District No. 525 Water Plant No. 1 Expansion to serve
Sundance Cove – ADDENDUM NO. ONE
To: Harris County Municipal Utility District No. 525
Gentlemen:
The undersigned bidder has carefully examined the Instruction to Bidders, this bid, the form on Contract and its General and Special Conditions, the Technical Specifications, and the Plans for the work herein above described and referred to in the "Invitation to Bid", and also the site of the work and will provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other means of construction to complete all the work upon which he bids, as provided by the Special Conditions of the Contract, the Technical Specifications and shown on the plans, and binds himself on acceptance of his bid to execute a Contract, bonds and insurance, according to the prescribed forms, for performing and completing the said work within the time stated, and for maintaining same as required for the following prices:
If awarded the Contract, I/we will execute Contract on the Standard Forms of Agreement and furnish satisfactory insurance certificate and satisfactory performance and payment bonds in accordance with the Bid Documents.
Bidder acknowledges receipt of the following addendum(s):
No. 1: No. 2: No. 3: No. 4: No. 5: No. 6:
(Bidder-Company Name) (Print or Type Name)
(Signature) (Title)
It is understood that the Contractor is subject to a deduction from payments due him if the work is not completed within the specified number of calendar days. This deduction will be based on the schedule included in the "Special Conditions of the Agreement" which is a part of the Bid and Contract Documents.
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT
1. Restoration of Access Road to Equal or Better Conditions. Quantity reflects a 10 CY/truck load assumption. (ONLY AS AUTHORIZED AND
APPROVED BY ENGINEER IN WRITING).
TL 10 $____________ $______________
2. Construct all Site Work Preparation including, but not limited to, Clearing, Grubbing, Stripping and Proof Rolling, Etc. (Complete in place and Fully Operational and Functional Including all Miscellaneous and Required Components and Appurtenances; as per the Approved Construction Drawings and Details, Contract Documents, General Notes, General and Special Conditions, Technical Specifications and any Addenda)
AC 1 $____________ $______________
3. Final Site Clean Up and Grading (including hydro-mulch seeding, inclusive of waterings, drainage swale, rip rap, fertilizing, mowing, over-seeding and maintenance until a stand of Bermuda grass has been established and all approving agencies have inspected and accepted the project after the one-year maintenance period has been successfully satisfied)
LS 1 $____________ $______________
TOTAL SITE WORK: $___________________
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID PROPOSAL - ADDENDUM NO. ONE
SITE WORK
EHRA
August 25, 2026
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
Quantities reflected on this Bid Proposal were tabulated from a NON APPROVED set of Construction Drawings
4. Construct a Fully Functional and Operational 212,361 Gallon Powder Coated Bolted Steel Ground Storage Tank (Complete in place and Fully Operational and Functional Including all Miscellaneous and Required Components and Appurtenances, Testing; as per the Approved Construction Drawings and Details, Contract Documents, General Notes, General and Special Conditions, Technical Specifications and any Addenda)
EA 1 $____________ $______________
5. Disinfection of Tanks as per AWWA and TCEQ Standards; Including a Minimum of Three (3) Water Bacteriological Tests per Tank.
LS 1 $____________ $______________
6. Reinforced Concrete Foundations (Including but not limited to ring foundation for Ground Storage Tank and Splash Pads)
LS 1 $____________ $______________
7. Modification to Existing Water Plant Yard Piping System, Valves, Fittings and Appurtenances and Painting of Above Ground Piping (Complete in place and Fully Operational and Functional Including all Miscellaneous and Required Components and Appurtenances; as per the Approved Construction Drawings and Details, Contract Documents, General Notes, General and Special Conditions, Technical Specifications and any Addenda)
LS 1 $____________ $______________
8. Modification to Existing Chlorine Gas Disinfection System. (Complete in place and Fully Operational and Functional Including all Miscellaneous and Required Components and Appurtenances; as per the Approved Construction Drawings and Details, Contract Documents, General Notes, General and Special Conditions, Technical Specifications and any Addenda)
LS 1 $____________ $______________
TOTAL WATER PLANT: $___________________
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID PROPOSAL - ADDENDUM NO. ONE
WATER PLANT
EHRA
August 25, 2026
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
9. Modification to Existing Water Plant Electrical System (Complete in place and Fully Operational and Functional Including all Miscellaneous and Required Components and Appurtenances; as per the Approved Construction Drawings and Details, Contract Documents, General Notes, General and Special Conditions, Technical Specifications and any Addenda)
LS 1 $____________ $______________
TOTAL ELECTRICAL: $___________________
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID PROPOSAL - ADDENDUM NO. ONE
ELECTRICAL
EHRAAugust 25, 2026 P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
10. Enforcement of TPDES Requirements and General Source Controls; Including Filing NOI and NOT, Jobsite Postings, Regular Inspections, Filing Reports, etc. as Required for SWPPP Compliance for Duration of Construction Project; Contractor is to Practice Good Housekeeping Rules at All Times During Construction and is Responsible to Repair All Damage to the Control Measures as a Result of their own Construction Activities; a thirdy party will be Responsible for Complete SWPPP Compliance for the Developer and for the Repair of Any and All Damage to the Control Measures Caused by Parties Other than the Contractor
LS 1 $____________ $______________
TOTAL STORM WATER POLLUTION PREVENTION PLAN: $___________________
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID PROPOSAL - ADDENDUM NO. ONE
STORM WATER POLLUTION PREVENTION PLAN
EHRA
August 25, 2026
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
ITEM DESCRIPTION AMOUNT
Site Work $_____________________
Water Plant $_____________________
Electrical $_____________________
Mobilization, Certificates of Insurance and Performance, Payment and Maintenance Bonds as Indicated in the Contract Documents (maximum bid $100,000.00)
Construction Permits $_____________________
One-Time Only Construction Staking Service to be performed by Edminster, Hinshaw, Russ & Associates, dba, EHRA, as Indicated in the Special Conditions section of the Contract Documents. All additional staking is at the expense of the Contractor.
(minimum bid $6,000.00)
Post Construction Topographic Verification, As-Built Survey and Record Drawing Preparation to be performed by Edminster, Hinshaw, Russ & Associates, dba, EHRA, as Indicated in the Special Conditions section of the Contract Documents and in Accordance with Harris County Public Infrastructure Department (HCPID) Standards, Rules and Regulations and signed by Registered Professional Engineer. (minimum bid $4,000.00)
TOTAL AMOUNT BID: $____________________
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID SUMMARY
EHRA
August 25, 2026
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
Site Work Contractor:
Electrical Contractor:
Surface Preparation and Coatings Application Contractor:
NOTE: This portion MUST be filled out and submitted with the Contractor's Bid. Failure to provide this information will result in disqualification of bid.
HARRIS COUNTY
MUNICIPAL UTILITY DISTRICT NO. 525
WATER PLANT NO. 1 EXPANSION (P-4975)
BID PROPOSAL - ADDENDUM NO. ONE
EQUIPMENT SUPPLIER AND SUBCONTRACTOR LIST
Subcontractor List (must be completed):
EHRA
August 25, 2026
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Sundance WP Exp - Addendum No. One
ADDENDUM NO. ONE
EHRA
Master Specifications Bid Proposal
P:\151-031-12-01\CPS\WP 1 Expansion (rebid)\Contract Docs\Bid Docs\Bid Proposal - Addendum No. One.doc
It is also understood that in the event the successful bidder fails to enter into the Contract and to furnish a Performance Bond and Payment Bond in the amount of 100 percent of the contract for all parts of the work, he will forfeit the Cashier's Check, Certified Check, or Bidder's Bond, as provided in the Specifications.
The undersigned proposes, if awarded the contract, to begin work within seven (7) calendar days from written notice to commence work is given by the Engineer, and to Substantially Complete the work within _____________ (___) calendar days from the date of the written notice to commence work.
The quantities reflected in this Bid Proposal were tabulated from a set of drawings issued for bidding purposes only. The final quantities constructed may vary slightly from the bid quantities.
This bid proposal shall be considered part of the Contract.
Respectfully yours, (Bidder-Company Name) (Address - Physical)
(Signature) (City) (County)
(Print or Type Name) (State) (Zip Code)
(Title) (Address - Mailing)
(Name of Surety) (City) (State) (Zip Code)
(Phone)
ATTEST
(Fax)
Seal, if Bidder is a Corporation (E-mail)
| Harris County |
| Municipal Utility District No. 525 |
| ADDENDUM NO. ONE |
| Bid Proposal - Addendum No. One.pdf |
| Harris County Municipal Utility District No. 525 |
| Water Plant No. 1 Expansion to serve |
| Sundance Cove – ADDENDUM NO. ONE |
| To: Harris County Municipal Utility District No. 525 |
| Bid Proposal - Sundance WP Exp - Addendum No. One.pdf |
| Site Work |
| Water Plant |
| Electrical |
| SWPPP |
| Totals |
| Subs |
File details come from the government source that posted it. Updated .