Addendum No.1 - RFP 25-182-PSC.pdf

PDF 178 KB Posted

Attached to
EWEB ITB 25-182-PSC NERC CIP Compliance Evaluation and Roadmap
Solicitation number
S-P00140-00015020
Issued by
Lane County, Oregon

About this file

This is an Addendum #1 for a Request for Proposal (RFP 25-182-PSC) issued by the Eugene Water & Electric Board (EWEB) for a NERC CIP Compliance Evaluation and Roadmap project. The addendum provides clarification on several key aspects of the project, including details about the scope of work for Phases I and II. EWEB is seeking a comprehensive evaluation of their Bulk Electric System (BES) Asset Inventory, which includes 39 electric assets, with the potential for both minor and significant system reconfigurations to improve grid reliability.

The addendum confirms that EWEB will allow offshore resources to be leveraged for the project and outlines the internal stakeholder groups that will be involved in Phase II, including Cyber Security, Information Services (IT), Electric-Systems Engineering, and the Communications Shop (which manages Electric SCADA systems). The project may involve exploring operational changes such as system simplification, potential third-party system operations, limiting mid-span disruptions, and evaluating contiguous elements. The closing date and time for the RFP remain unchanged, and this addendum is classified as a non-material change that does not require signing or returning.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum - Nonmaterial Change Rev 4-21-20

October 21, 2025

ADDENDUM #1

NERC CIP Compliance Evaluation and Roadmap

RFP 25-182-PSC

This addendum provides clarification to the solicitation document(s) for work only to the extent indicated herein.

Questions and Answers:

RFP

Section

Page # Question Response

2.4 9 As part of Phase 1, review of the BES Asset Inventory, what is the current count of Assets that will need to undergo the evaluation?

We have 39 Electric Assets

5.3 17 Does EWEB allow offshore resources to be leveraged for scope of work?

Yes

2.4 9 Phase II - How many "internal stakeholder" groups will be involved in

Phase II from EWEB?

Our internal stakeholder groups will include Cyber Security, Information

Services (IT), Electric-Systems Engineering, and the

Communications Shop (manages Electric SCADA systems).

2.4 9 For Phase I, can you clarify what level of configuration or operational changes

EWEB envisions for the review? Are you seeking recommendations only for minor adjustments, or should the analysis also encompass more significant reconfigurations that might simplify systems and impact grid reliability?

We are considering both minor or more significant reconfiguration that could simplify systems. Revisions could entail operation of systems by third parties, limiting mid-span disruptions, and evaluation of contiguous elements.

Addendum - Nonmaterial Change Rev 4-21-20

CLOSING DATE AND TIME

The closing date and time will remain unchanged.

This addendum constitutes a NON-MATERIAL CHANGE to the bid and does not need to be signed or returned.

Addendum prepared by:

Wendy Lopez, CPPB Purchasing Analyst

Cc: Sarah Gorsegner

End of Addendum