This document is a Request for Proposal (RFP) Addendum No. 01 issued by the Department of Technology, Management and Budget (DTMB) for the MCCA KC-46 ADAL Aircrew Training Complex project at Selfridge Air National Guard Base in Michigan. The project involves designing a training facility with multiple simulator components, including a Weapon System Trainer (WST), Boom Operator Trainer (BOT), Fuselage Trainer (FuT), and Pilot Part Task Trainers. The proposal is due on October 16, 2025, at 2:00 p.m. ET, with a design period of performance of 450 calendar days. The addendum provides clarifications about the project, including a mandatory pre-proposal meeting, requirements for a hazardous material survey, and anticipated environmental considerations such as potential PFAS/PFOA presence in the soil.
The addendum includes specific technical requirements for the training complex, detailing power and space needs for various equipment. Design proposals must include an environmental consultant to address potential soil contamination, and construction administration is estimated at 180 calendar days. The project involves detailed specifications for simulator facilities, including storage areas and specific power requirements for different training stations. The file also includes meeting attendance records from a pre-proposal meeting held on October 2, 2025, with representatives from multiple engineering, design, and consulting firms. The project appears to be a comprehensive military training facility upgrade with complex technical and environmental considerations.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 01
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
October 03, 2025
PROJECT NAME
MCCA KC-46 ADAL Aircrew Training Complex Selfridge Air National Guard Base, MI
FILE NUMBER
511/25453.JLM
PROJECT DIRECTOR
Josiah L. Meyers, P.E.
PROPOSAL DUE DATE:
October 16, 2025 @ 2:00 p.m. ET
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Please note the following clarifications:
1. Mandatory pre-proposal meeting sign-in sheets are attached.
2. Design proposal shall include a Hazardous material survey of building 35 to meet National Emission
Standards for Hazardous Air Pollutants (NESHAP) requirements for selective demolition.
3. The design period of performance remains 450 calendar days per the Project Statement and SOW.
4. For pricing of Phase 600 and 700 Construction Administration, please assume a construction duration of 180 calendar days.
5. It is anticipated PFAS/PFOA is present in the soil on the west side of the building (the assumed building addition footprint). Please include an environmental consultant in your cost proposal to address requirements for the contractor in the construction bid documents.
6. KC-46 simulator facility support requirements are below/attached:
• (qty 1) Weapon System Trainer (WST) which is a pilot, full-motion simulator
• (qty 1) Boom Operator Trainer (BOT) which is a Boom Operator, full-motion simulator
• (qty 1) Fuselage Trainer (FuT) which is a static, fuselage of the KC-46 to train on cargo loading etc
• (qty 2?) Pilot Part Task Trainer (PPTT) which is a small, static cockpit that pilots can practice
• FUT Covered Storage: 111' x 27' area for pallet storage
• FUT Cargo Yard: 80' x 40' area for staging cargo loads and maneuvering K-loader
Continued next page http://www.buy4michigan.com/
Please note the following RFI answers:
Q1) Please clarify which owner review period is correct: For scheduling purposes, assume fourteen (28) calendar days each for Owner review for the documentation and recommendation.
A1) Twenty-eight (28) calendar days is correct.
Q2) In the Project Statement, please verify if the following is correct: Firms should only submit one (1) attachment (being less than 6 MB) for proposal submission.
A2) The single file size limit has been increased from 6 MB to 25 MB.
The proposal due date remains unchanged.
APPROVED BY:
PROJECT DIRECTOR Josiah L. Meyers, P.E. DATE: October 03, 2025