1-Proj Stmt-KC-46 ADAL Aircrew Trng Complex 511.25453.JLM.pdf

PDF 117 KB Posted

Attached to
511/25453. JLM; Selfridge ANGB - Bldg 35 Renovations
Solicitation number
RFP-171-250000003108-4
Issued by
Macomb County, Michigan

About this file

This is a Project Statement from the State of Michigan's Department of Technology, Management and Budget (DTMB), soliciting professional architectural and engineering services for the Michigan Department of Military and Veterans Affairs (DMVA), specifically for the Michigan Air National Guard at Selfridge Air National Guard Base. The project involves designing and altering Building 35 to accommodate KC-46 simulators and forward supply point functions, with a total facility modification of approximately 35,309 square feet, including alterations to the flight simulator facility (21,809 SF), warehouse supply (8,000 SF), and adding aircrew training space (5,500 SF). The mandatory walk-through inspection is scheduled for October 2, 2025, at 10:00 a.m. EDT, with proposals due on October 16, 2025, at 2:00 p.m. Eastern. The desired contract timeline includes award in November 2025, 35% design submittal by May 1, 2026, complete design from December 2025 to February 2027, bidding from March to June 2027, and construction starting in August 2027.

The project is budgeted at $29,580,000 for construction, with professional services required for Phase 300 Schematic Design, Phase 400 Preliminary Design, Phase 500 Final Design, and Phases 600/700 Construction Administration. The professional services contractor will be responsible for comprehensive design services, including gathering base information, preparing design documents, conducting design review submittals at multiple stages (15%, 35%, 65%, 100% Pre-final, and 100% Final), assisting with bidding and contracting, and providing construction administration. The project must comply with Department of Defense Unified Facilities Criteria, Air Force base design standards, and various federal, state, and local regulations. Special considerations include challenging soil conditions, a high water table, and supporting the installation of specialized training equipment like Weapons System Trainer, Boom Operator Weapon System Trainer, and Fuselage Trainer.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0427 (R 10/22)

PROJECT STATEMENT

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design and Construction Division 3111 West St. Joseph Street

Lansing, Michigan 48909

FILE NUMBER

511/25453.JLM

PROPOSAL DUE DATE

October 16, 2025, at 2:00 p.m., EASTERN

CLIENT AGENCY

Department of Military and Veterans Affairs

PROJECT NAME AND LOCATION

Project Name: MCCA KC-46 ADAL Aircrew Training Complex Selfridge Air National Guard Base, MI PROJECT ADDRESS (if applicable) 28900 Selfridge Ave, Building 127, Selfridge Air National Guard Base, MI 48045

CLIENT AGENCY CONTACT

Thomas Resh

TELEPHONE NUMBER

248-206-9921

DTMB - DCD PROJECT DIRECTOR

Josiah L. Meyers, P.E.

TELEPHONE NUMBER

517-614-7705

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION: Thursday, October 2, 2025 at 10:00 a.m. EDT, Bldg. 127, Selfridge Air National Guard Base, Harrison Township, MI 48045. Arrive at the base 30 minutes early to allow time for security screening.

MANDATORY (Check box if Mandatory)

CONTRACTOR ACCESS ENTRY REQUEST All contractor/vendor representatives attending Preproposal Walk-through Meeting must submit a 127th Security Forces Access Request Vetting Form five business days prior to the meeting date (See the attached request form, password 127sfs). Send the completed form by email to Josiah Meyers at email address: meyersj11@michigan.gov . The email “Subject” must include: Facility name, project name, date and time of Pre-Proposal Walkthrough Meeting.

PROJECT DESCRIPTION/SERVICES REQUESTED

The Department of Technology, Management and Budget (DTMB) on behalf of Michigan Department of Military and Veterans Affairs (DMVA), Michigan Air National Guard (MIANG), is requesting professional architectural and engineering services to perform Phase 300-700 Professional Services to design the subject project at Selfridge Air National Guard Base, Michigan. The intent of this selection process is to contract with a qualified firm to provide ad-hoc professional services to prepare construction drawings and bid documents to add to and alter Building 35 to accommodate KC-46 simulators and forward supply point functions.

The facility will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards including UFCs 3-260-01, 3-600-01 and 4-211-01, and ETL 02-15. This project will comply with DoD antiterrorism/force protection requirements per Unified Facilities Criteria. Special Requirements: Special foundations due to challenging soil conditions and a high water table, and allied support for installation of Weapons System Trainer (WST), Boom Operator Weapon System Trainer (BOWST), and Fuselage Trainer (FUT) equipment.

The project scope includes all building and infrastructure required for a complete and usable facility, including:

-ALTER FLIGHT SIMULATOR FACILITY (21,809 SF))

-ALTER WAREHOUSE SUPPLY (8,000 SF)

-ADD AIRCREW TRAINING (5,500 SF)

-SUPPORTING FACILITIES

-UTILITIES

-PAVEMENTS/ACCESS ROAD/PARKING

-SITE IMPROVEMENTS

-COMMUNICATION SUPPORT

DMVA/Air National Guard has budgeted $29,580,000 for construction of this project.

This request is to provide Phase 300 Schematic Design, Phase 400 Preliminary Design & Phase 500 Final Design, and Phases 600/700 Construction Administration. Phase 300, 400 & 500 design review submittals will be required at typical federal design milestones (15%, 35%, 65%, 100% (Pre-final) & 100% (Final)).

Phase 300 – 15%, 35% Phase 400 – 65% Phase 500 – 100% (Pre-final), 100% (Final) Phase 600 & 700 construction administration will be required, and the PSC will participate in the bidding process. Reference attached A-E Statement of Work (SOW) for full design scope of work.

Provide a complete PSC proposal for all required Professional Architectural and Engineering Services in compliance with the State of Michigan, Department of Technology, Management and Budget (DTMB) Project Statement (DTMB-0427), DTMB Billable Rate Professional Services Contract and the DTMB Request for Proposal Billable Rate Form (DTMB-0430) and the DTMB, State Facilities Administration, Design and Construction (DCD) policies and procedures for complete Phase 300, 400 and 500 design services to produce the deliverables detailed in the Scope of Work and ANGETL 24-02. Include Phase 600 & 700 construction administration services as part of the proposal.

Professional services shall also include, but are not limited to:

• Gathering and verifying all base information required for the proper design of the project.

• Phase 300, 400, 500 design services as required to produce schematic plans through contract document development.

• Design submittals at 15%, 35%, 65%, 100% (Pre-final) & 100% (Final) contract documents for owner review. Submittals shall comply with ANG Engineering Technical Letter (ANGETL) 24-02 – Air National Guard Design Objectives & Procedures (“Tab C”) (or most current version if superseded)

• Phase 500 assistance with bidding and contracting process.

• Phase 600 & 700 construction administration services.

• Gathering or preparing all data and design development information that shall ultimately be necessary for plans, submittals, and permit application considerations required for the Environment, Great Lakes and Energy (EGLE), and governing agency approvals. Include as reimbursable expenses.

• Provide a proposed design schedule. Design schedule shall be kept up to date through the project and will be incorporated into the Construction Manager’s master schedule.

• If requested, provide up to four (4) full-size sealed hardcopy sets of contract documents of each of the (3) design tasks, including addenda, for DTMB and DMVA use during construction.

• Macomb County Soil Erosion and Sedimentation Control Permitting (SESC) plan review submittal

• Sub-consultants, site surveying, soil borings, field and laboratory testing, printing/reproduction, postage, and project travel (over 100 miles) are to be included as a reimbursable expense.

The PSC proposal shall include:

• The proposal must include meetings as required to fulfill the intent of the contract. While some project team meetings may be considered in the form of computer-based meetings (e.g., Teams, Zoom, etc.), key review meetings shall be in person. For all document review meetings, required review information shall be submitted within sufficient time to allow for complete Owner review, in electronic and in hard copy formats. At a minimum, five (5) face to face meetings will be required, including but not limited to: the predesign charrette/kickoff meeting, pre bid meeting and pre-construction meetings.

• Provide a bi-weekly progress summary email to the project team, briefly documenting the prior two week’s progress by the PSC and display the initial project schedule and current schedule status.

• All testing required to verify the site conditions for the proper design are to be identified in the PSC

Technical proposal, and the associated costs of testing are to be itemized in the PSC Cost proposal as reimbursements. The PSC shall indicate in their proposal any testing requirements.

• A graphic bar chart schedule (in weeks) indicating the PSC’s proposed timeline for services based on a proposed PSC contract start date of 1 December 2025. For scheduling purposes, assume fourteen (28) calendar days each for Owner review for the documentation and recommendation.

The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, base information, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders, and communications. The budget for this work is believed to be reasonable to accommodate the services requested. However, in the event it is insufficient to fund all the work requested, it is anticipated that a contract modification may be requested at a later date.

Reference attached SOW for required milestones, meetings, deliverables, plan reviews and schedules.

Comply with all regulations identified in the PWS, attachments incorporated by reference below, and all applicable local, state, and federal regulations.

Please NOTE:

Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.

Firms should only submit one (1) attachment (being less than 6 MB) for proposal submission. The attachment is to be the technical and cost proposal combined.

Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.

If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

Responses should NOT be emailed to the Project Director.

NIGP CODES

90607, 92533, 92517, 92588

DESIRED SCHEDULE OF WORK

Contract Award: November 2025 35% Design Submittal: 1 May 2026 Complete Design: December 2025 – February 2027 (15 Months) Bid and Award: March – June 2027 Construction: Start August 2027

ACCEPTING RFP QUESTIONS UNTIL:

Please do not submit online questions via SIGMA VSS. All questions should be emailed to Josiah Meyers at meyersj11@michigan.gov address no later than 5:00 p.m., Eastern on Thursday, October 9, 2025.

REFERENCE STANDARDS: This project will comply with all applicable codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DHHS, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply. See SOW for additional reference standards.

This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)

Attachment(s):

-Architect – Engineer Statement of Work -DD Form 1391 (draft)