This Addendum No. 1, issued February 6, 2022, modifies the contract documents for the Quarles Vacuum Priming Systems Replacement Equipment project for the Cobb County-Marietta Water Authority in Georgia. The project involves supplying two vacuum priming systems: one for the Quarles 2 High Service Pump Station and one for the Quarles Water Treatment Plant Raw Water Pump Station No. 1, to be awarded under a single contract. The bid deadline and public opening have been extended from February 9, 2022, to February 16, 2022, with bids due by 1:00 p.m. local time and public opening at 1:15 p.m. The deadline for submitting questions to the Owner's Project Manager, Rita Neely, has been extended to 4:00 p.m. local time on February 10, 2022, at rneely@ccmwa.org. Bidders must acknowledge receipt of this addendum and all other addenda as part of their bid submission, and failure to do so may result in bid rejection. Only sealed bids will be considered; facsimile and email bids are not acceptable.
The addendum also addresses a technical specification question regarding the Operator Interface Unit (OIU) in Section 2.06 F. A bidder inquired whether the OIU must be a PanelView Plus component or if an equivalent could be substituted due to current long lead times for Allen-Bradley components. The Owner's response indicates that the OIU must be furnished as specified; however, the Owner committed to working with the awarded bidder to determine a satisfactory delivery time based on current market conditions. This response acknowledges supply chain constraints while maintaining specification requirements.
Text of this file
Quarles Vacuum Priming Systems Replacement Equipment Addendum No. 1 (2/6/2022) Page 1 of 2
ADDENDUM NO. 1
ISSUE DATE: February 6, 2022 for
QUARLES VACUUM PRIMING SYSTEMS REPLACEMENT EQUIPMENT
COBB COUNTY-MARIETTA WATER AUTHORITY
Receipt of this addendum, and all other addenda, should be acknowledged as part of your Bid (refer to Section 00300, Bid Form). Failure to acknowledge receipt of the addenda may result in rejection of the Bid. This addendum forms a part of the Contract Documents.
Please note the following CHANGES to the above referenced Contract Documents as follows:
SPECIFICATIONS
1. Section 00020, REPLACE text “SEPARATE SEALED BIDS for furnishing equipment will be received by the Cobb County-Marietta Water Authority at 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066 until 1:00 p.m., local time, February 9, 2022, for the Project known as:
Quarles Vacuum Priming Systems Replacement Equipment
Bids will be publicly opened and read aloud on February 9, 2022, at 1:15 pm. Bids received after the designated time for receival of bids will not be considered. Unsealed Bids, including facsimile Bids or Bids sent by e-mail, will not be considered. The Owner of the project is Cobb County Marietta Water Authority. Bid opening time is subject to extension pursuant to O.C.G.A. Section 36-91-20(d).”
WITH “SEPARATE SEALED BIDS for furnishing equipment will be received by the Cobb County- Marietta Water Authority at 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066 until 1:00 p.m., local time, February 16, 2022, for the Project known as:
Quarles Vacuum Priming Systems Replacement Equipment
Bids will be publicly opened and read aloud on February 16, 2022, at 1:15 pm. Bids received after the designated time for receival of bids will not be considered. Unsealed Bids, including facsimile Bids or Bids sent by e-mail, will not be considered. The Owner of the project is Cobb County Marietta Water Authority. Bid opening time is subject to extension pursuant to O.C.G.A. Section 36-91-20(d).”
2. Section 00020, REPLACE text “All questions related to the Project shall be submitted by email no later than 4:00 p.m., local time, February 4, 2022 to the Owner’s Project Manager, Rita Neely, at rneely@ccmwa.org.” WITH “All questions related to the Project shall be submitted by email no later than 4:00 p.m., local time, February 10, 2022 to the Owner’s Project Manager, Rita Neely, at rneely@ccmwa.org.
mailto:rneely@ccmwa.org mailto:rneely@ccmwa.org
Addendum No. 1 (2/6/2022) Page 2 of 2
- End Addendum No. 1 -
Attachments
1. Questions and Responses No. 1.
Questions and Responses No. 1 (2/6/2022) Page 1 of 1
QUESTIONS AND RESPONSES NO. 1
ISSUE DATE: February 6, 2022 for
QUARLES VACUUM PRIMING SYSTEMS REPLACEMENT EQUIPMENT
COBB COUNTY-MARIETTA WATER AUTHORITY
QUESTION 1:
In Section 2.06 F, does the OIU have to be a PanelView Plus? There is a very long lead time with Allen-Bradley components currently. Can this be subbed for an equivalent?
Q1 RESPONSE:
No, please furnish OIU as specified. Owner will work with awarded bidder to determine a satisfactory delivery time for all equipment based on current market conditions.
SPECIFICATIONS
Other files
| File | Type | Posted |
|---|---|---|
| Quarles Vacuum Priming System | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .