Addendum No 2.pdf
PDF 149 KB Posted
- Solicitation number
- RFB-785-2500000034-3
- Issued by
- Hopkins County, Kentucky
About this file
This document is an Addendum No. 2 to an Invitation to Bid (ITB) from the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for Heating and Cooling Systems at the Western Kentucky Veterans Center in Hanson, Kentucky. The addendum includes changes to the bid opening date, updates to the specifications and drawings, and clarifications on requirements such as hot work permits, hazardous materials handling, permits and fees, and refrigerant requirements. It also provides details on the removal and reinstallation of existing equipment, handrails, lighting, fencing, and the need to repair impacted areas to match existing conditions.
The addendum outlines updates to the approved manufacturers list for the packaged dedicated ventilation-air water source heat pump units, including the addition of Aaon and United Cool Air. It also notes that the refrigerant for the outdoor air units is not required to be R-410A, as long as it complies with EPA requirements effective January 1, 2025. The Contractor is responsible for coordinating any electrical changes due to the refrigerant change.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2500000034_1_SO_FORM.PDF | ||
| Addendum No 1.pdf | ||
| Final_RFB_785_2500000034_3_SO_FORM.PDF | ||
| Final_RFB_785_2500000034_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-37-25
FOR: Heating and Cooling Systems Western Kentucky Veterans Center Kentucky Veterans Affairs Hanson, Kentucky
DATE: August 20, 2024
RFB-785-2500000034
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Change Official Bid Opening to August 28, 2024 at 1:30 PM ET
Item 2: See attached pages for change and/or additions and/or deletions to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-37-25 For: Heating and Cooling Systems Western Kentucky Veterans Center Kentucky Veterans Affairs Hanson, Kentucky
Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration
HEATING AND COOLING SYSTEMS
WEST KENTUCKY VETERANS CENTER
HANSON, KENTUCKY
MARCUM NO. 23582
ACCOUNT NO. 074-CAG5-WK08-00
ADDENDUM 2.00
AUGUST 20, 2024
The following Addendum Items shall be made part of the Contract Documents for the referenced project.
2.01 Refer to Section 10000 Special Conditions – Work Restrictions. The Contractor shall be required to file a Hot Work Permit with the Owner and follow the Owner’s
Hot Work requirement whenever open flames or sparks may be present during work within the facility.
2.02 Refer to Section 10000 Special Conditions. If the Contractor encounters materials that they suspect to be hazardous, the Contractor shall stop work and report to the Engineer via Ecomm with a Request for Information and include within the Daily Work Report. The Owner will be responsible for Hazardous
Materials Testing and Abatement if materials are encountered.
2.03 Refer to Section 10000 Special Conditions. All permits, fees, inspection costs, etc. required for the Project are the responsibility of the Contractor.
2.04 Refer to Sections 237438 and 237439. Omit all references to Energy Recovery
Ventilator within these specification sections.
2.05 Refer to Drawing H0.1 – Packaged Dedicated Ventilation-Air Water Source Heat
Pump Unit Schedule and Section 237438. Update the Manufacturers List to include “Aaon”. Final approval will be reserved for the Shop Drawing review stage.
2.06 Refer to Drawing H0.1 – Packaged Dedicated Ventilation-Air Water Source Heat
Pump Unit Schedule and Section 237438. Update the Manufacturers List to include “United Cool Air”. Final approval will be reserved for the Shop Drawing review stage.
2.07 Refer to Drawing H0.1 –Dedicated Ventilation-Air Water Source Heat Pump
Schedule and Section 237439. Update the Manufacturers List to include “Aaon”.
Final approval will be reserved for the Shop Drawing review stage.
2.08 Refer to Drawing H0.1 – Dedicated Ventilation-Air Water Source Heat Pump
Schedule and Section 237439. Update the Manufacturers List to include “United
Cool Air”. Final approval will be reserved for the Shop Drawing review stage.
2.09 Refer to Drawings H0.1 HVAC Equipment Schedules. The refrigerant for the outdoor air units is not required to be R-410A. Refrigerants shall be compliant with EPA requirements listed in the American Innovation and Manufacturing Act effective January 1, 2025. As part of this change, the Mechanical Contractor shall coordinate with the Electrical Contractor for any changes in electrical characteristics of the units including wire sizes and circuit breakers.
2.10 Refer to Drawing DH1.2. The Contractor shall turn over unit tagged MAU-3B to the Owner. Contractor shall protect and move the unit to the Owner’s designated location on-site.
2.11 Refer to Drawings DH1.1 and H1.1. The Contractor shall remove and reinstall existing handrails and lighting bollards at the plan north end of the courtyard for installation of MAU-1. The Contractor shall repair all sidewalks, grass areas, light bollards and plantings as required to match existing conditions.
2.12 Refer to Drawings DH1.1, DH1.2, and DH1.5. Where condensate piping is removed through brick wall, the Contractor shall infill opening with mortar to match existing brick mortar color.
2.13 Refer to Drawings DH1.2 and H1.2. The Contractor shall remove and reinstall existing fencing at the plan south end of the courtyard for installation of MAU-3.
The Contractor shall repair all sidewalks, grass areas, and plantings as required to match existing conditions.
2.14 Refer to Drawing H1.2 – MAU-3 Fencing. The fencing around MAU-3 shall be equal to City Scapes Covrit Gates and Walls – Model Varying Size Slat Wall Infill;
extruded aluminum 6063-T6 Alloy, 0.80” wall thickness, 4000 Series power coat finish on all sides; color to be selected by Owner from manufacturer’s standard colors; surface mount brackets for attaching to concrete pad, pole base cover;
fitted metal post caps; fence height shall be 6’-8” minimum.
2.15 Refer to Drawings DE1.1, DE1.2, DE1.3, DE1.4, and DE1.5. The Contractor shall abandon all heat trace cabling installed below existing piping insulation.
Heat trace cabling shall only be removed from piping where the hot water piping is being modified or removed (i.e. mechanical room, connections of hot water recirculation piping, etc.
Attachments:
1. None
END OF ADDENDUM 2.00
| Addendum No 2.pdf |
| Item 1: Change Official Bid Opening to August 28, 2024 at 1:30 PM ET |
| Item 2: See attached pages for change and/or additions and/or deletions to specifications and/or drawings. |
| END OF ADDENDUM |
2024-08-20 MPE Addm 2.00.pdf