This is Addendum No. 1, issued June 5, 2025, by City Schools of Decatur, Georgia for ITB 25-008 Interior Painting Services. The addendum modifies the original solicitation specifications for interior painting services at five schools, including hallways, common areas, classrooms, offices, walls, metal surfaces, handrails, exterior doors, and door frames, excluding closets and storage areas. All surfaces require a minimum of two topcoats after proper wall preparation. The project must be completed by June 30, 2025, with the project owner and awarded vendor to determine the start date and sequence of work across the five schools based on prioritized needs. A color schedule will be provided by the owner after contract award. The addendum clarifies that all references to interior wood have been removed from the specifications, addressing bidder confusion regarding wooden door preparation and finishing requirements.
Pricing must include priming costs regardless of final color selection, with payment terms specified as net 30 days following line item completion, accurate invoice submission with an invoice number, and project owner approval. Line items correspond to the bid schedule. The contractor must submit a detailed paint schedule within three business days of contract award, listing manufacturer names, specific product labels, and surfaces to which each product will be applied. Paint materials must be delivered to the job site at least three days before painting in original, unbroken containers and stored in a locked room. Award criteria will consider schedule, references, experience, and other factors with equal weight when pricing is comparable. An optional prebid site visit sign-in sheet is included in the addendum, and all other original terms and conditions of ITB 25-008 remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 25_008 Interior Painting Services_pdf FIN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Schools Of Decatur
Vision
We strive to cultivate an educational foundation that empowers students to realize their full potential, thrive as productive global citizens, ignite positive change, and create a more just and equitable world.
ADDENDUM NO.1
DATE: June 5, 2025
TO: All Bidders
FROM: Lonita Broome, PhD.
Chief Financial Officer
RE: ITB 25-008 - Interior Painting Services
Addendum No. 1 for the above-referenced solicitation.
The following changes have been made to ITB 25-008- Interior Painting Services:
A. Specification:
Page 36 - Summary Revised.
The word "wood" has been removed from the summary.
B. Part 3 Execution
Page 37 & 38 - 3.2 Preparation Item B. Revised
The first sentence, which references "Interior Wood" has been removed.
Page 38 - 3.2 Preparation Item G. Removed
Removal of "interior wooden doors".
Page 39 - 3.4 Exclusions Revised. Add Item "¡"
Item "i" added to include "All Interior Wood"
The following questions were received:
C. Questions and Answers:
Dr. Carmen Sulton
Chair
Hans Utz Tracey Anderson James Herndon Dr. Jana Johnson-Davis Sophia D'Elena
Vice Chair Board Member Board Member Board Member Student Representative
125 Electric Avenue• Decatur, Georgia 30030 404-371-3601 www.csdecatur.net
City Schools Of Decatu
Q1. I'm reviewing the bidding documents for this, which state on page 38 that "All interior wooden doors will have all tape, stickers, etc., removed before sanding."
Are all wooden doors to be sanded? Are they to be stained after sanding?
A1. All references to interior wood have been removed from the specifications.
Q2. When do we need to start the project, and when does it need to be completed by?
A2. The project owner will work with the awarded vendor to determine the start of the project; however, the project must be completed by June 30, 2025.
Q3. It states the color schedule will be provided after award of the contract, but we need to know the color to bid priming or not, unless we should include priming no matter what.
A3. Yes, priming should be included in your price.
Q4. Does this deadline include doing all five schools simultaneously?
A4. The project owner will work with the awarded vendor to determine the sequence of the school painting. CSD will prioritize based on need.
Q5. It says that payments will be made net 30 after line items are closed out, what would a line item constitute? Is it to match the bid schedule?
A5. Yes, line items match the bid schedule. After completion of the job, receipt of an accurate invoice with an invoice number on it, and approval from the project owner, payment will be made within 30 days.
Q6. If pricing is close, what factors matter most (schedule, references, experience, etc)?
A6. All of the factors will be taken into consideration.
Q7. I am requesting soft copies of the Plans, Specifications, and Prebid
Sign-In-Sheet or Planholders related to ITB 25-008 Interior Painting Services.
A7. A PDF of the sign-in sheet for the optional site visit is included in this addendum.
All other terms and conditions remain the same.
SPECIFICATIONS
SUMMARY
Revised 6/6/2025 – Page 36
These projects include interior painting of the hallways, common areas, classrooms and offices of the buildings. Scope of work will include painting of walls, wood and metal surfaces, handrails, exterior doors, and door frames, excluding closets/storage. (Where items are not mentioned), finish them as specified for similar work.
*All surfaces will require a minimum of two (2) topcoats for proper coverage after walls are prepped.
PART I GENERAL
1.1 QUALITY ASSURANCE
A. It is the intent of these specifications where brands or trade names are mentioned to set a quality for that particular product. Manufacturer Sherwin Williams Pro
Industrial Pre-Catalyzed Water-based Epoxy for all metal surfaces and Pro Mar 200
Primer and Interior Latex for wall surfaces (low VOC paint). Other manufacturers with equal products will be considered. Written permission will be required.
1.2 SUBMITTAL
A. Paint Schedule - Within three (3) business days after contract is awarded, submit for approval, a detailed schedule of the paint proposed listing the name of the manufacturer, the specific label name of each product, and the surface to which it will be applied. Such schedule, when approved, shall be equal force with these specifications in that no deviation from it will be allowed except with owners' written approval. Omission of any item from the approved schedule shall not relieve contractor of this obligation to comply with these specifications.
B. Color Schedule - Owner will provide color schedule after award of contract.
1.3 PRODUCT HANDLING
A. Deliver all painting materials to job site at least three (3) days before painting, in original unbroken containers showing manufacturer's name and type of paint, subject to owners inspection and approval. Store all paint in a locked room. Paint shall be used directly from original containers or shall be mixed on job to match approved samples.
B. The floor and wall surfaces of paint storage room shall be suitably protected against damage or defacement. Necessary precautions shall be taken to reduce fire hazard to a minimum.