This is an addendum to contract documents for the City of Zebulon's Westside Drainage Improvements project prepared by Watkins Engineering. The project, identified as W&A Project No. W2605-003-01, involves drainage and sewer infrastructure improvements. Bids are due on Tuesday, March 24, 2026, at 11:00 AM. The addendum clarifies specific bid items and specifications that are to be incorporated into the overall project's contract documents and construction drawings.

The addendum provides clarifications on two key bid items: Item 210-0100 encompasses the removal and disposal of existing storm piping, headwalls, driveways, and other elements that must be removed to accommodate the proposed work. The second clarified item addresses the removal and replacement of an 8-inch V.C. sewer main with an 8-inch ductile iron epoxy coated pipe, with the bid cost including any bypass pumping necessary to maintain sewer flow during installation. No pricing information, set-asides, incumbents, or funding sources are specified in this addendum document.

View the file

Other files

File Type Posted
00111 _ Advertisement for Bids.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T: 229.388.8823 | 1606 Whiddon Mill Road, Tifton, GA 31793 | WWW.WATKINSENG.COM

ADDENDUM NO. 1

CONTRACT DOCUMENTS & SPECIFICATIONS

March 18, 2026

PROJECT: Westside Drainage Improvements

W&A Project No.: W2605-003-01

OWNER: City of Zebulon

BID DATE: Tuesday, March 24, 2026, at 11:00 AM

1. CONTRACT DOCUMENTS – Section 00410, Bid Form:

This addendum includes the clarification of bid items listed below and shall be incorporated into the overall Project’s Contract Documents, Specifications & Construction Drawings.

• Item 210-0100 includes the removal & disposal of existing storm piping, headwalls, driveways, etc. that must be removed to install the proposed work.

• Item Remove & Replace 8- Inch V.C. Sewer Main with 8-Inch Ductile Iron epoxy coated pipe includes the cost of any bypass pumping required to maintain sewer flow while work is being installed.

END ADDENDUM NO. 1