Addendum no 1.pdf

PDF 118 KB Posted

Attached to
RFB-225-25 MA for Dredging of KY River Locks 1 - 5
Solicitation number
RFB 785 2500000638 3
Issued by
Calloway County, Kentucky

About this file

This Addendum No. 1 modifies the Invitation to Bid (RFB-225-25) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for dredging services at the Kentucky River Authority locks 1 through 5. The project requires bidders to provide lump sum pricing for mobilization and hourly rates for travel time (46 hours estimated), crane time (90 hours estimated), compressor time (1 hour estimated), and down time (10 hours estimated). The bid document revision dated April 24, 2025, establishes the pricing structure on the revised page 3 of the official bid document.

The addendum eliminates the bid bond requirement previously specified in the original solicitation, reducing bonding obligations for interested contractors. Bidders must submit completed bids with the authentication of bid statement and statement of non-collusion and non-conflict of interest properly executed for validity. The grand total pricing must be calculated by applying unit prices to the estimated quantities and mobilization lump sum, with all line items and final cost clearly identified on the bid form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-222-25

FOR: MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

DATE: April 24, 2025

RFB-785-2500000638

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to page 3 of the bid document, use attached revised page 3 in lieu of previously issued.

Item 2: No bid bond is required on this project.

END OF ADDENDUM

Invitation to Bid No. RFB-225-25 For: MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

REVISED RFB-225-25

OFFICIAL BID DOCUMENT

FOR

MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

Item No. Description Units Est. Maximum

Time Unit Price Total Cost

1.

Mobilization

LS

2.

Travel Time

Hours

3.

Crane Time

4.

Compressor Time

5.

Down Time

GRAND TOTAL $_____________________________

NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF

INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE BID TO BE VALID.

addendum no 1.pdf
addendum no 1
Add 1 page 2

Pages from Official Bid Document.pdf