This Addendum No. 1 modifies the Invitation to Bid (RFB-225-25) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for dredging services at the Kentucky River Authority locks 1 through 5. The project requires bidders to provide lump sum pricing for mobilization and hourly rates for travel time (46 hours estimated), crane time (90 hours estimated), compressor time (1 hour estimated), and down time (10 hours estimated). The bid document revision dated April 24, 2025, establishes the pricing structure on the revised page 3 of the official bid document.
The addendum eliminates the bid bond requirement previously specified in the original solicitation, reducing bonding obligations for interested contractors. Bidders must submit completed bids with the authentication of bid statement and statement of non-collusion and non-conflict of interest properly executed for validity. The grand total pricing must be calculated by applying unit prices to the estimated quantities and mobilization lump sum, with all line items and final cost clearly identified on the bid form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-222-25
FOR: MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
DATE: April 24, 2025
RFB-785-2500000638
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to page 3 of the bid document, use attached revised page 3 in lieu of previously issued.
Item 2: No bid bond is required on this project.
END OF ADDENDUM
Invitation to Bid No. RFB-225-25 For: MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration
REVISED RFB-225-25
OFFICIAL BID DOCUMENT
FOR
MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
Item No. Description Units Est. Maximum
Time Unit Price Total Cost
1.
Mobilization
LS
2.
Travel Time
Hours
3.
Crane Time
4.
Compressor Time
5.
Down Time
GRAND TOTAL $_____________________________
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF
INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE BID TO BE VALID.