Addendum No 1.pdf

PDF 2 MB Posted

Attached to
RFB-96-25 KCTCS - Water Infiltration Maysville CTC
Solicitation number
RFB-785-2500000183-2
Issued by
Lincoln County, Kentucky

About this file

This document is Addendum No. 1 to the Invitation to Bid No. RFB-96-25 for the Water Infiltration Study and Remediation - Phase 2 project at the Maysville Community & Technical College in Maysville, Kentucky. The addendum outlines corrections and changes to the bid documents, including the addition of a missing drawing sheet TA-2.1 that details the roof details and reference images for the Technical Center. The addendum also provides instructions for bidders to thoroughly clean all steel members, remove rust buildup, and prepare for painting, as well as to protect the existing roofing system during the installation of the new TPO roofing system.

The addendum includes detailed requirements for the installation of the new TPO roofing system, including the use of substrate board, flashing tape, counterflashing, and joint sealants. It also provides instructions for protecting existing utilities, equipment, and rooftop elements during the construction activities. The addendum does not contain any information about pricing, set-asides, incumbents, funding sources, or contract term details.

View the file

Other files

File Type Posted
Final_RFB_785_2500000183_1_SO_FORM.PDF PDF
Final_RFB_785_2500000183_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-96-25

FOR: Water Infiltration Study and Remediation - Phase 2 KCTCS - Maysville Community & Technical College Maysville, Kentucky

DATE: October 22, 2024

RFB-785-2500000183

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-96-25 For: Water Infiltration Study and Remediation - Phase 2 KCTCS - Maysville Community & Technical College Maysville, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

Water Remediation – Maysville CTC – Phase 2 Account # 470 CABR MV50 01

Science Building and Technical Center - Maysville, Kentucky October 2024

Addendum No. 1 - 1

ADDENDUM NUMBER ONE

Bidders shall conform to the following changes, as same shall become binding to the Bid Documents for the purpose of bidding.

PROJECT INFORMATION

The bid advertisement indicates the following Site Visit Information:

CORRECTIONS AND CHANGES:

1. Sheet TA-2.1: Sheet TA-2.1 “MAYSVILLE TECHNICAL CENTER ROOF DETAILS AND REF IMAGES” was listed in the index of drawings on the project cover sheet but was inadvertently omitted from the bidding drawings. That missing sheet, TA-2.1, is attached.

END OF ADDENDUM NUMBER ONE. Refer to attachments.

THOROUGHLY CLEAN ALL STEEL

MEMBERS, REMOVING ALL RUST BUILD

UP, PREP FOR PAINTING.

PROTECT EXISTING ROOFING

SYSTEM DURING INSTALLATION OF

NEW TPO SYSTEM

07 5423-01

TPO ROOFING SYSTEM

07 5423-02

1/4" SUBSTRATE BOARD, ANCHOR

OR ADHERE TO EXISTING FACE

BRICK

PROTECT EXISTING COPING

DURING INSTALLATION OF NEW

TPO SYSTEM

TA-2.1

TA-2.1

PROTECT EXISTING

ROOFING SYSTEM

DURING INSTALLATION

OF NEW TPO SYSTEM

THOROUGHLY CLEAN ALL STEEL

MEMBERS, REMOVING ALL RUST BUILD

UP, PREP FOR PAINTING.

PROTECT EXISTING ROOFING

SYSTEM DURING INSTALLATION OF

NEW TPO SYSTEM

07 5423-01

TPO ROOFING SYSTEM

09 9123-01

INTERIOR PAINTED FINISH

AT EDGE ANGLE AND BAR

JOISTS, LENGTH OF ENTIRE

WALL

PRIME SUBSTRATE BOARD AS

NEEDED FOR NEW TPO ROOFING

SYSTEM

07 5423-02

1/4" SUBSTRATE BOARD, ANCHOR

OR ADHERE TO EXISTING FACE

BRICK

07 5423-03

TPO FLASHING TAPE ACCESSORY

PROTECT EXISTING ROOFING BASE

AND COUNTER FLASHING TO

REMAIN

07 6200-03

COUNTERFLASHING

07 9200-02

JOINT SEALANT

ALONG TOP EDGE OF

EXISTING COUNTER

FLASHING

T2

T5

PROTECT ALL EXISTING

ROOF MOUNTED

EQUIPMENT, TYP.

PROVIDE NEW JOINT

SEALANT AT ALL SEAMS

OF METAL PANELS

BELOW CLERESTORY

CURTAIN WALL

FRAMES, TYP.

T5

PROVIDE NEW JOINT SEALANT

AT TOP OF EXISTING COUNTER

FLASHING, TYP.

PROTECT EXISTING ROOF

SYSTEM DURING

CONSTRUCTION ACTIVITIES,

TYP.

T1

T6

PROTECT ALL EXISTING

UTILITIES AND

EQUIPMENT IN LAB

ENVIRONMENT DURING

METAL EDGE ANGLE

PREP AND PAINTING

ACTIVITIES, TYP.

REMOVE ALL RUST

FROM EXISTING EDGE

ANGLE AND PREPARE

FOR NEW PAINTED

FINISH. PROVIDE NEW

PAINTED FINISH AT

EDGE ANGLE.

07 5423-01

TPO ROOFING SYSTEM

PROTECT EXISTING COPING DURING

INSTALLATION OF NEW TPO SYSTEM

07 5423-02

1/4" SUBSTRATE BOARD, ANCHOR

OR ADHERE TO EXISTING FACE

BRICK

PRIME SUBSTRATE BOARD AS

NEEDED FOR NEW TPO ROOFING

SYSTEM

07 5423-04

TPO TERMINATION BAR - INSTALL

CONTINOUS BED OF JOINT

SEALANT

07 6200-03

COUNTERFLASHING

07 9200-02

JOINT SEALANT

AT ALL SEAMS IN EXISTING COPING

07 9200-02

JOINT SEALANT

AT TOP OF SUBSTRATE BOARD

EXTEND UNDER EXISTING COPING

GASKETED FASTENER

RTA DATE

DRAWN BY

CHECKED BY

A & E FILE NO

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

AS BUILT DATE

DECA LOG #

ACCOUNT NO.

DRAWING NO.

DESCRIPTION OF REVISIONS DATE

DRAWING DATE

PHASE

REVISION HISTORY OF THIS DRAWING

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

470-CABR-MV50-01

RTA

09/06/24

CG

JM TA-2.1

MAYSVILLE TECHNICAL CENTER ROOF DETAILS AND REF IMAGES09/06/24

2221.01 MAYSVILLE, KY

KCTCS - MCTC WATER INFILTRATION MITIGATION

TA-2.1 1 1/2" = 1'-0"

1 TECHNICAL CENTER - WALL TO ROOF SECTION

TA-2.1 3" = 1'-0"

3 TECHNICAL CENTER - WALL TO ROOF SECTION

TA-2.1 NTS

5 TECHNICAL CENTER - REFERENCE PHOTO 6

TA-2.1 NTS

4 TECHNICAL CENTER - REFERENCE PHOTO 7

TA-2.1 NTS

6 TECHNICAL CENTER - REF. PHOTO AT RM 124

TA-2.1 3" = 1'-0"

2 TECHNICAL CENTER - WALL TO ROOF SECTION

TECHNICAL CENTER KEY NOTES

T1 CAREFULLY REMOVE EXISTING EXTERIOR JOINT SEALANT AND BACKER

MATERIAL AT PERIMETER OF EXISTING WINDOW/CURTAIN WALL FRAME.

PREPARE SUBSTRATE AND FILL VOIDS WITH SPRAY POLYURETHANE

FOAM INSULATION TO PROPERLY SEAL PERIMETER JOINT AND INSTALL

NEW EXTERIOR JOINT SEALANT.

T2 DEMOLISH EXISTING CLERESTORY STOREFRONT FRAMES. REPLACE

WITH NEW 6" CURTAIN WALL. ONCE REPLACEMENT CURTAIN WALL HAS

BEEN INSTALLED, FILL VOIDS WITH POLYURETHANE SPRAY FOAM

INSULATION AND PROVIDE NEW EXTERIOR AND INTERIOR JOINT

SEALANT AT PERIMETER OF CURTAIN WALL FRAME. REFER TO

SPECIFICATIONS FOR ADDTIONAL REQUIREMENTS.

T3 PATCH AND REPAIR ALL GYPSUM BOARD AT HEAD, JAMB, AND SILLS OF

CURTAIN WALL FRAME. REMOVE ALL WATER DAMAGED MATERIAL AND

REPLACE WITH NEW.

T4 CAREFULLY REMOVE DOOR THRESHOLDS, CLEAN SUBSTRATES, AND

REINSTALL THRESHOLDS IN TWO CONTINUOUS BEADS OF SEALANT,

TYPICAL AT EXTERIOR DOORS.

T5 PROVIDE NEW VERTICAL PARAPET WALL TPO ROOFING AND FLASHING

TO OUTSIDE OF EXISTING BRICK WALL ON ROOF.

T6 REMOVE RUST, CLEAN, AND PREPARE EXISTING STEEL MEMBERS FOR

NEW PAINTED FINISH. PROVIDE PRIMER AND TWO FINISH COATS OF

PAINTED FINISH SYSTEM.

T7 DEMOLISH EXISTING FLOORING IN VESTIBULE ONLY. PREPARE

SUBSTRATE AND INSTALL NEW ENTRANCE MAT CARPET TILES IN

VESTIBULE.

E NO.

COMMONWEALTH

OF

STERE

D

I G

R

TN

E K

U C K Y

G.K I W

D A

H C

A

L L A

IH

C R A

TE

C T

C

S

G

Addendum No 1.pdf
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM