Addendum No 1.pdf

PDF 166 KB Posted

Attached to
RFB-55-25 DMA-ACA Harlan HVAC & Latrine Upgrade
Solicitation number
RFB-785-2500000076-2
Issued by
Harlan County, Kentucky

About this file

This document is an addendum to an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the HVAC and Latrine Upgrade at the Appalachian Challenge Academy Department for Military Affairs located in Grays Knob, Kentucky. The addendum clarifies requirements related to washroom accessories, door specifications, and the core/keying system. It instructs bidders to conform to the changes outlined, which will become binding upon the contract issued. The addendum also notes that bidders must acknowledge receipt of the addendum in their proposal form.

The addendum does not provide any details on pricing terms, set asides, incumbents, funding requirements, or other salient financial information. It is solely focused on clarifying technical specifications and requirements for the project.

View the file

Other files

File Type Posted
Final_RFB_785_2500000076_1_SO_FORM.PDF PDF
Final_RFB_785_2500000076_2_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-55-25

FOR: HVAC and Latrine Upgrade Appalachian Challenge Academy Department for Military Affairs Grays Knob, Kentucky

DATE: August 22, 2024

RFB-785-2500000076

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-55-25 For: HVAC and Latrine Upgrade Appalachian Challenge Academy Department for Military Affairs Grays Knob, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

ADDENDUM NO.1

8/22/2024

To: All Planholders

From: alt32 Architecture | Design 310 Old Vine Street, Suite 300 Lexington, KY 40507-1582

Re: DMA-ACA Harlan-HVAC and Latrine Upgrades, 095CB5THR0500

This addendum is (1) Pages of 8-1/2 x 11

The purpose of this addendum is to clarify further the requirements of the plans. The contractors are governed by the information in the addendum as if included in the plans. The addendum is part of the contract documents. The bidders shall acknowledge receipt of the addendum in their form of proposal.

1) Reference Spec Section 102800, 2.2 Washroom Accessories and drawings: A question was asked about the scope of work related to Toilet paper, Paper towel, Soap dispensers, Grab bars, Sanitary napkin disposals, Mirrors, Shower curtains and Rods, as well as Mop and Broom holders. The Accessory schedule shown on G2 will dictate the scope and contract obligations for the accessories.

2) Reference Spec Section 081416, 2.3 A-2. The notes in the specs call out for the contractor to match existing. A bidder has asked the question for us to define the exact species. The exact species of wood is oak (likely red oak). The intent is for the door vendor to provide wood color and grain swatches during the submittal phase and allow the design team to select. Architect recommends that the contractors view the doors (wood) during the upcoming site visit and evaluate the species of wood. For the purposes of bidding, contractor shall bid a red oak veneer door.

3) Reference Spec Section 087100 – 2.05 and 2.12 A question was asked about the core/keying system – bid docs note to match existing. Coring is a traditional best system and defined in the sections noted above.

End of Addendum.

Addendum No 1.pdf
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM

ADDENDUM NO 1 (5).pdf

File details come from the government source that posted it. Updated .