ADDENDUM NO 1 - 26-020_Signed.pdf

PDF 189 KB Posted

Attached to
Wastewater Continuing Engineering Services State and local contract opportunity
Solicitation number
RFP 720 26-020 3
Issued by
Palm Beach County, Florida

About this file

This is an Addendum No. 1 issued by the Palm Beach County Water Utilities Department for Wastewater Continuing Engineering Services (Project No. PBCWUD 26-020). The addendum revises the pre-proposal meeting schedule, moving the non-mandatory meeting from Wednesday, June 3, 2026 to Monday, June 8, 2026 at 9:00 a.m. local time. The meeting will be held at the Central Region Operations Center, Operations and Maintenance Building, Conference Room 55, located at 8100 Forest Hill Blvd, West Palm Beach, FL 33413. All respondents are encouraged to attend and should plan to arrive prior to the scheduled time.

The addendum was certified and signed by Jane House, P.E., LEED AP, Director of Engineering for the Palm Beach County Water Utilities Department on June 3, 2026. This document serves to notify all bidders and other interested parties of the change to the original meeting date and location details for the continuing engineering services procurement.

View the file

Other files for this state and local contract opportunity

Other files attached to Wastewater Continuing Engineering Services, newest first.
File Type Posted
26-020, 26-027 and 26-028 Pre-Proposal Meeting-9AM_20260605.pdf PDF
2026 AD Wastewater Eng Svc RFP_20260526.pdf PDF
Plan Holder Registration Form.pdf PDF
ADDENDUM NO 2- 26-020_Signed.pdf PDF
26-020 Wastewater Attendance Sheet.pdf PDF
Master Professional Service Contract Template_20260306.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

PALM BEACH COUNTY WATER UTILITIES DEPARTMENT

WASTEWATER CONTINUING ENGINEERING SERVICES

Project No. PBCWUD 26-020

TO ALL BIDDERS AND OTHERS CONCERNED:

The following section of the advertisement is revised as follow:

A non-mandatory pre-proposal meeting will be held on Wednesday, June 3, 2026 Monday, June 8, 2026, at 9:00 a.m. local time at the Central Region Operations Center, Operations and Maintenance Building, Conference Room 55, 8100 Forest Hill Blvd, West Palm Beach, FL 33413. All Respondents are encouraged to attend this meeting. Attendees shall provide sufficient time to ensure arrival prior to the indicated time.

Dated this 3rd day of June 2026

Palm Beach County Water Utilities Department

Jane House, P.E., LEED AP Director of Engineering

2026-06-03T15:02:22+0000
Certified by Adobe Acrobat Sign

File details come from the government source that posted it. Updated .